Review Stop B BUILDING (STRUCTURAL)
Rev No 7 Status P Date 2006-02-28 Cont ID  
Sent By jgomez Date 2006-02-28 Time 13:51 Rev Time 0.33
Received By jgomez Date 2006-02-28 Time 13:51 Sent To P
Notes
2006-02-28 00:00:00DRAWING A-1.0 SUBMITTAL.

Review Stop B BUILDING (STRUCTURAL)
Rev No 6 Status F Date 2006-02-14 Cont ID  
Sent By jgomez Date 2006-02-14 Time 16:28 Rev Time 0.35
Received By jgomez Date 2006-02-14 Time 16:28 Sent To P
Notes
2006-02-14 00:00:00BUILDING REVISION CHECKLIST:
 1- PLUMBING RISER DIAGRAM WAS CROSSED
 OUT ON SHEET A-1.0. PLUMBING RISER
 DIAGRAM IS PART OF THE CONSTRUCTION
 DOCUMENTS. RE-SUBMIT CLEAN COPIES OF DWG
 A-1.0 TO ROUTE TO PROPER REVIEW TRADES.
  
 JULIO GOMEZ
 BUILDING PLANS EXAMINER
 (561)805-6712

Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status F Date 2006-01-18 Cont ID  
Sent By jgomez Date 2006-01-18 Time 18:30 Rev Time 0.50
Received By jgomez Date 2006-01-18 Time 18:30 Sent To PC
Notes
2006-01-18 00:00:00BUILDING REVISION CHECKLIST:
 1- DRAWING A-1.0 INCLUDES PLUMBING RISER
 DIAGRAM AND IT WAS CROSSED WITH THE
 WORDS NIC.PLUMBING RISER DIAGRAM IS
 PART OF THE CONSTRUCTION DOCUMENTS AND
 IT CAN'T BE CROSSED OUT.RE-SUBMIT
 CLEAN DRAWINGS.
  
 JULIO GOMEZ
 BUILDING PLANS EXAMINER
 (561)805-6712

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2005-09-21 Cont ID  
Sent By jgomez Date 2005-09-21 Time 11:54 Rev Time 0.50
Received By jgomez Date 2005-09-21 Time 11:54 Sent To PC
Notes
2005-09-21 00:00:00REVISED DRAWINGS AND REQUESTED PRODUCT
 APPROVALS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2005-08-16 Cont ID  
Sent By jleech Date 2005-09-10 Time 13:22 Rev Time 1.00
Received By jgomez Date 2005-08-16 Time 17:19 Sent To PC
Notes
2005-08-16 00:00:00BUILDING REVISION REVIEW CHECKLIST:
 1- PLANS DON'T SHOW ANY REVISIONS. ONLY
 ADDITIONAL DETAILS ARE SHOWN IN SHEET D2
 CLEARLY SPECIFY WHAT ARE THE REVISIONS.
  
 2- MISSING FOUNDATION PAGE.
  
 3- PROVIDE THE FOLLOWING INFORMATION
 REQUSTED ON PROVISO DATED 6-30-05:
  
 A) APPLY FOR SHUTTERS PERMIT.
  
 B) REVISE DOOR/WINDOW SCHEDULE. DON'T
 MISMATCH DOORS IN WINDOW SCHEDULE.
  
 C) REVISE DETAIL 5/D1: CONNECTOR HTS20
 CAN'T SUPPORT GIRDER TRUSS. SEC.
 104.2.1.2 CITY AMENDMENTS TO FBC 2001.
  
 D) TRUSS ANCHOR SCHEDULE. UPDATE NAIL
 SIZE FOR HUS26. SEE CATALOGUE.
  
 E) ROOF FRAMING PLAN: REVISE CONNECTORS
 SPECIFIED AT ENTRY PORCH TO MATCH
 DETAILS 5 AND 6 OF DRAWING D-1.
  
 F) PROVIDE FLORIDA OR LOCAL PRODUCT
 APPROVAL FOR:
 * 9'-0" WIDE SLIDING GLASS DOORS.
  
 **8'-0" HIGH ENTRY DOORS.
  
 G) SHEET A-5.0 SHEAR VALUES NOTE:
 PROVIDE HAND CALCULATIONS. CLARIFY WHY
 USING THE TIMBER MANUAL TO CALCULATE
 TAPCONS VALUES. WHAT EDITION OF THE
 MANUAL WAS USED. SEC. 104.2.1.2 CITY
 AMENDMENTS TO FBC 2001.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ AT (561)805-6712

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2005-06-30 Cont ID  
Sent By jgomez Date 2005-06-30 Time 16:34 Rev Time 2.00
Received By jgomez Date 2005-06-30 Time 16:34 Sent To PC
Notes
2005-06-30 00:00:00BUILDING REVIEW PROVISO:
 1-SHUTTERS UNDER A SEPARATE PERMIT.
 2-REVISE DOOR/WINDOW SCHEDULE TO MATCH
 PLANS/ELEVATIONS. INCLUDING SYMBOLS USED
 3- DETAIL 5/D-1: CONNECTOR HTS20 CANN'T
 SUPPORT BEAM. REVISE AS REQUIRED. SEC.
 104.2.1.2 CITY AMENDMENTS TO FBC 2001.
 4- TRUSS ANCHOR SCHEDULE: UPDATE NAIL
 SIZE FOR HUS26. SEE CATALOGUE.
 5- ROOF FRAMING PLAN: REVISE CONNECTOR
 SPECIFIED AT ENTRY PORCH TO MATCH
 DETAILS 5 & 6 OF DRAWING D-1.
 6- PROVIDE PRODUCT APPROVAL FOR:
 A) 9'-0" WIDE SLIDING GLASS DOORS.
 B) 8'-0" HIGH ENTRY DOORS.
 7- SHEET A-5.0 SHEAR VALUES NOTE:
 A) PROVIDE HAND CALCULATIONS. SECTION
 104.2.1.2 CITY AMENDMENTS TO FBC 2001.
 B) WHY USING TIMBER MANUAL TO CALCULATE
 TAPCON VALUES AND WHAT EDITION IS USED.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2005-05-20 Cont ID  
Sent By jgomez Date 2005-05-20 Time 08:36 Rev Time 0.25
Received By jgomez Date 2005-05-20 Time 08:36 Sent To PC
Notes
2005-05-20 00:00:00CHECKLIST:
  
 1- MEETING WITH RON ELLISH. HE REQUESTED
 TO LOG OUT PLANS TO MAKE CORRECTIONS
 BASED ON PREVIOUS COMMENTS DONE TO SAME
 MODEL.

Review Stop E ELECTRICAL
Rev No 8 Status P Date 2006-05-16 Cont ID  
Sent By dpalmer Date 2006-05-16 Time 20:31 Rev Time 0.00
Received By dpalmer Date 2006-05-16 Time 20:31 Sent To P
Notes
2006-05-16 00:00:00REDLINE DTHE OCP SHOWN FOR CU. AS THE
 KW IS SHOWN AS 9.8 AND THE OCP IS 40A.
 THIS IS TO BE VERIFIED.
  
 IF PLANS COMES BACK FOR ANY OTHER
 ELECTRICAL REV'S PLEASE REVISE. THIS HAS
 BEEN REDLINED MULTIPLE TIMES.
 THIS WILL NO LONGER BE REDLINED.

Review Stop E ELECTRICAL
Rev No 7 Status P Date 2006-03-18 Cont ID  
Sent By dpalmer Date 2006-03-18 Time 12:10 Rev Time 0.00
Received By dpalmer Date 2006-03-18 Time 11:59 Sent To PC
Notes
2006-03-18 00:00:00REDLINED OCP FOR CU #2, VIF.

Review Stop E ELECTRICAL
Rev No 6 Status P Date 2006-02-09 Cont ID  
Sent By dpalmer Date 2006-02-09 Time 07:41 Rev Time 0.00
Received By dpalmer Date 2006-02-09 Time 07:41 Sent To B
Notes
2006-02-09 00:00:00** REDLINED **
  
 VERIFY OCP FOR CU, SHOWS 9.8KW, 40A OCP
  
 MIN 8' GROUND ROD REQUIRED PER 250.52A
  
 VERIFY MIN OCP FOR AHU#2, PER 424.3B,
 MIN OCP 125%.

Review Stop E ELECTRICAL
Rev No 5 Status P Date 2006-01-17 Cont ID  
Sent By dpalmer Date 2006-01-17 Time 11:36 Rev Time 0.00
Received By dpalmer Date 2006-01-17 Time 11:08 Sent To PC
Notes
2006-01-17 00:00:00REDLINED
  
 SEE BATH CIRCUIT #25 SHOWN ON PLANS,
 HOWEVER SHOWN AS COOKTOP ON PANEL
 SCHEDULE.
 OCP FOR AHU#2 SHOULD BE SIZED A MIN 125%
 PER 424.3B

Review Stop E ELECTRICAL
Rev No 4 Status F Date 2006-01-10 Cont ID  
Sent By dpalmer Date 2006-01-10 Time 10:33 Rev Time 0.00
Received By dpalmer Date 2006-01-10 Time 10:33 Sent To B
Notes
2006-01-10 00:00:00********* UNSAT **********
  
  
 1)NOTE: PLEASE SEE PANEL "A" IS MISSING
 LOAD FROM PANEL "B"AND "C".
 PLEASE ALSO SEE LOADS ON PANEL "B" AND
 "C". SOME ARE SHOWN WITH 83 KW, 96, KW
 ETC.
 PLEASE ADJUST LOADS AND CALCUALTIONS.
 220, 215.5
  
 2)NOTE: PLEASE SEE MISSING RECEPT PER
 210.52
  
 3)NOTE: PLEASE SEE MISSING SD'S REQUIRED
 INSIDE AND OUTSIDE BEDRM. NFPA-72
 11.5.1.1
  
 4)NOTE: PLEASE SEE CIRCUIT #25 SHOWN ON
 PLANS FOR BATHS LIGHTING, SHOWN AS SMALL
 APPLIANCE ON PANEL SCHEDULE.?
 PLEASE CORRELATE.
  
 5)NOTE: PLEASE SEE MISSING OCP FOR
 AHU'S??
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE IN CONTACTING
 THIS OFFICE.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2005-08-08 Cont ID  
Sent By dpalmer Date 2005-08-08 Time 16:15 Rev Time 0.30
Received By dpalmer Date 2005-08-08 Time 16:15 Sent To P
Notes
2005-08-08 00:00:00REV'S

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2005-06-13 Cont ID  
Sent By dpalmer Date 2005-06-13 Time 16:19 Rev Time 0.30
Received By dpalmer Date 2005-06-13 Time 16:19 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2005-04-25 Cont ID  
Sent By dpalmer Date 2005-04-25 Time 13:20 Rev Time 0.40
Received By dpalmer Date 2005-04-25 Time 13:20 Sent To M
Notes
2005-04-25 00:00:00********** UNSAT *************
  
 1)NOTE: PLEASE SEE PANEL "A" SHOWS FEED
 TO PANEL "B" AS 100A OCP ON #6 AWG.
 PLEASE SEE 240.4,310.16 AND PLEASE
 CORRELATE WITH RISER DIAGRAM.
 PLEASE ALSO SEE THIS IS SHOWN AS 100A SP
 BRKR ON ONE PHASE? (MISPRINT)
  
 2)NOTE: PLEASE SEE PANEL "B" SHOWS SUB
 PANEL "C" IN TWO DIFFERENT LOCATIONS?
 PLEASE SEE THIS IS SHOWN ON SAME PHASE.
 PLEASE ALSO CORRELATE AWG FOR 60A OCP.
 SHOWS #6 AND #8?
 PLEASE ALSO SEE SINGLE POLE 60A FOR
 ADDITIONAL SUB PANEL.
 PLEASE SEE 240.4,310.16, 310.15B6
  
 3)NOTE: PLEASE SEE NOTE ADDED TO CENTER
 OF PLANS WHICH IS A PROVISO SET UP BY A
 PLAN REVIEWER FOR A PREVIOUS PROJECT.
 THIS COMMENT FROM OTHER ELECTRICAL PLAN
 REVIEW SHOULD NOT BE LOCATED ON THESE
 PLANS.
 PLEASE REMOVE.
  
 4)NOTE; PLEASE SEE MISSING RECEPT ALONG
 2' OF WALL SPACE. 210.52 SEE ONE SET HAS
 BEEN REDLINED FOR LOCATION.
  
 5)NOTE: PLEASE SEE ONE OF THE ABOVE
 CIRCUITS FOR SD'S (#38) IS THE SAME
 CIRCUIT ON PANEL SCHEDULE FOR SUB PANEL
 "B".
  
 6)NOTE: PLEASE PROVIDE ROOM DESIGNATIONS
 ON PLANS.
 215.5
  
 7)NOTE: PLEASE SHOW LOADS ON EACH
 ELECTRICAL PANEL. PANEL "B AND "C
 MENTIONS TO SEE LOAD CALCS, HOWEVER
 THESE PANELS NEED TO SHOW ACTUAL LOAD
 FOR THOSE PANELS.
 220,215.5
  
 8 )NOTE: PLEASE SEE 220.3B4.
 PLEASE SHOW ALL RECESSED LTS BASED ON
 MAX WATTAGE FOR FIXTURE(S). THIS MAY NOT
 BE FIGURED IN W/ 3W/PER SQ FT.
 PLEASE PROVIDE FIXTURE INFORMATION ON
 LEGEND.
  
 PLEASE BE SURE TO REMOVE ALL OLD VOIDED
 SHEETS AND ONLY INSERT NEW REVISED
 SHEETS INTO TWO COMPLETE SETS FOR REVIEW
 AND STAMPING.
 PLEASE SEE ONE COPY/SET OF OLD SHEETS
 SHOULD BE SUBMITTED FOR REFERENCE ONLY.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 CONSTUCTION SERVICES DEPT.
 561-805-6717
 [email protected]
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 10 Status N Date 2006-05-16 Cont ID  
Sent By adarroug Date 2006-05-16 Time 11:48 Rev Time 0.00
Received By adarroug Date 2006-05-16 Time 11:41 Sent To E
Notes
2006-05-16 00:00:00TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 9 Status N Date 2006-03-14 Cont ID  
Sent By adarroug Date 2006-03-14 Time 14:01 Rev Time 0.00
Received By adarroug Date 2006-03-14 Time 14:01 Sent To E
Notes
2006-03-14 00:00:00TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 8 Status N Date 2006-02-01 Cont ID  
Sent By adarroug Date 2006-02-01 Time 18:16 Rev Time 0.00
Received By adarroug Date 2006-02-01 Time 18:16 Sent To E
Notes
2006-02-01 00:00:00TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 7 Status N Date 2006-01-06 Cont ID  
Sent By adarroug Date 2006-01-06 Time 09:51 Rev Time 0.00
Received By adarroug Date 2006-01-06 Time 09:51 Sent To E
Notes
2006-01-06 00:00:00TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2005-12-30 Cont ID  
Sent By adarroug Date 2005-12-30 Time 09:36 Rev Time 0.00
Received By adarroug Date 2005-12-30 Time 09:36 Sent To E
Notes
2005-12-30 00:00:00TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2005-08-24 Cont ID  
Sent By adarroug Date 2005-08-24 Time 10:50 Rev Time 0.00
Received By adarroug Date 2005-08-24 Time 10:50 Sent To P
Notes
2005-08-24 00:00:00TO "P" BOX/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2005-08-03 Cont ID  
Sent By adarroug Date 2005-08-03 Time 15:52 Rev Time 0.00
Received By adarroug Date 2005-08-03 Time 15:52 Sent To E
Notes
2005-08-03 00:00:00TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2005-06-08 Cont ID  
Sent By shill Date 2005-06-08 Time 09:32 Rev Time 0.00
Received By shill Date 2005-06-08 Time 09:32 Sent To  
Notes
2005-06-08 00:00:00TO DP DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-04-22 Cont ID  
Sent By adarroug Date 2005-04-22 Time 11:09 Rev Time 0.00
Received By adarroug Date 2005-04-22 Time 11:09 Sent To E
Notes
2005-04-22 00:00:00TO "SFR""E"

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-05-20 Cont ID  
Sent By adarroug Date 2005-05-20 Time 08:37 Rev Time 0.00
Received By jgomez Date 2005-04-15 Time 14:34 Sent To PC
Notes
2005-04-15 00:00:00TO "Z" BOX

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2005-04-26 Cont ID  
Sent By prafter Date 2005-04-26 Time 12:07 Rev Time 0.50
Received By prafter Date 2005-04-26 Time 12:07 Sent To P
Notes
***NONE***

Review Stop P PLUMBING
Rev No 8 Status P Date 2006-06-06 Cont ID  
Sent By jleech Date 2006-06-06 Time 17:49 Rev Time 0.00
Received By jleech Date 2006-06-06 Time 17:49 Sent To B
Notes
2006-06-06 00:00:00RESTAMP NO CHANGES TO PLUMBING.

Review Stop P PLUMBING
Rev No 7 Status P Date 2006-02-28 Cont ID  
Sent By jleech Date 2006-02-28 Time 17:36 Rev Time 0.00
Received By jleech Date 2006-02-28 Time 17:36 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 6 Status F Date 2006-02-16 Cont ID  
Sent By jleech Date 2006-02-16 Time 15:24 Rev Time 0.25
Received By jleech Date 2006-02-16 Time 15:24 Sent To B
Notes
2006-02-16 00:00:00PLEASE DO NOT "X" OUT PARTS OF THE PLAN.
 IF REVISIONS ARE REQUIRED THE PLANS NEED
 TO REVIEWED AND RESTAMPED BY ALL TRADES
 INVALVED.
 JOHN LEECH
 805-6695

Review Stop P PLUMBING
Rev No 5 Status N Date 2005-09-10 Cont ID  
Sent By jleech Date 2005-09-10 Time 13:24 Rev Time 0.33
Received By jleech Date 2005-09-10 Time 13:23 Sent To B
Notes
2005-09-10 00:00:00NO CHANGE TO PLUMBING

Review Stop P PLUMBING
Rev No 4 Status N Date 2005-09-10 Cont ID  
Sent By jleech Date 2005-08-13 Time 07:22 Rev Time 0.33
Received By jleech Date 2005-08-13 Time 07:22 Sent To B
Notes
2005-08-13 00:00:00 

Review Stop P PLUMBING
Rev No 3 Status N Date 2005-08-12 Cont ID  
Sent By jleech Date 2005-08-12 Time 14:19 Rev Time 0.33
Received By jleech Date 2005-08-12 Time 14:19 Sent To B
Notes
2005-08-12 00:00:00NO CHANGES TO PLUMBING. RISER DIAGRAM
 NOT SUBMITED.

Review Stop P PLUMBING
Rev No 2 Status P Date 2005-06-20 Cont ID  
Sent By jleech Date 2005-06-20 Time 16:04 Rev Time 0.25
Received By jleech Date 2005-06-20 Time 16:04 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2005-05-03 Cont ID  
Sent By jleech Date 2005-05-03 Time 16:09 Rev Time 0.33
Received By jleech Date 2005-05-03 Time 16:09 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2005-04-21 Cont ID  
Sent By jgomez Date 2005-05-20 Time 08:38 Rev Time 0.00
Received By mmclean Date 2005-04-21 Time 15:54 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved