Plan Review Details - Permit 05040909
Plan Review Stops For Permit 05040909
Review Stop B BUILDING (STRUCTURAL)
Rev No 6 Status P Date 2006-01-26 Cont ID  
Sent By jgomez Date 2006-01-26 Time 18:27 Rev Time 0.40
Received By jgomez Date 2006-01-26 Time 18:27 Sent To PC
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status F Date 2006-01-04 Cont ID  
Sent By jgomez Date 2006-01-04 Time 18:31 Rev Time 0.50
Received By jgomez Date 2006-01-04 Time 18:31 Sent To PC
Notes
2006-01-04 00:00:00BUILDING SUBMITTAL CHECKLIST:
 1- ENERGY CALCULATIONS SUBMITTED DON'T
 MATCH ORIENTATION OF HOUSE. SEE SURVEY
 FOR CORRECT HOUSE ORIENTATION. ENERGY
 CALCULATIONS NEED TO BE CALCULATED FOR
 WORST CASE SCENARIO OR THEY MUST MATCH
 ORIENTATION OF THE HOUSE ON THE SPECIFIC
 LOT. ENERGY CALCULATIONS SUBMITTED DON'T
 COMPLY WITH EITHER REQUIREMENT.
  
 2- OWES $70.00 FOR REVISION FEES.
  
 JULIO GOMEZ
 BUILDING PLANS EXAMINER
 (561)805-6712

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status F Date 2005-11-17 Cont ID  
Sent By jgomez Date 2005-11-17 Time 10:43 Rev Time 1.00
Received By jgomez Date 2005-11-17 Time 10:43 Sent To PC
Notes
2005-11-17 00:00:00BUILDING SUBMITTAL CHECKLIST:
 1- A) ENERGY CALCULATIONS WERE REVISED.
 NEED TO USE FBC 2001 FORM NOT FBC 2004
 FORM. PROVIDE CORRECT ENERGY CALCS FORM.
 B) ENERGY CALCULATIONS NEED TO BE
 CALCULATED FOR WORST CASE SCENARIO OR
 SITE SPECIFIC ORIENTATION. CALCULATIONS
 SUBMITTED ARE NOT FOR SITE SPECIFIC
 ORIENTATION FOR THIS HOUSE. IT DOESN'T
 MATCH HOUSE ORIENTATION. SEE SURVEY AND
 PROVIDE CORRECT SITE SPECIFIC
 ORIENTATION.
  
 2- A) REVISE ROOF FRAMING PLAN AT ENTRY
 AREA. PROVIDE CORRECT FRAMING PLAN AND
 CORRESPONDING CONNECTOR. THIS DWG WAS
 NOT SUBMITTED WITH THIS SUBMITTAL.
 B) REVISE TRUSS ANCHOR SCHEDULE.
 SPECIFY CORRECT SIZE AND NUMBER OF NAILS
 FOR CONNECTOR HUS26. DWG NOT SUBMITTED.
  
 3- PROVIDE CORRECT INFORMATION FOR FIRE
 RATED DOOR AT ATRIUM:
 A) DRAWINGS ARE FOR "OUTSWING" DOOR,
 WHILE DADE COUNTY NOA IS FOR "INSWING"
 DOOR. PROVIDE MATCHING INFORMATION.
 B) NEED 8'-0" HIGH DOOR AS SPECIFIED
 ON ARCHITECT'S PLANS.
  
 4- REVISED DRAWINGS AND ENERGY
 CALCULATIONS WILL BE SUBJECT TO REVISION
 FEES AS APPLICABLE.
  
 JULIO GOMEZ
 BUILDING PLANS EXAMINER
 (561)805-6712

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2005-08-31 Cont ID  
Sent By jgomez Date 2005-08-31 Time 13:54 Rev Time 0.50
Received By jgomez Date 2005-08-31 Time 13:54 Sent To PC
Notes
2005-08-31 00:00:00SUBMITTAL BUILDING REVIEW CHECKLIST;
 1- SEPARATE PERMIT FOR SHUTTERS HAS NOT
 BEEN APPLIED FOR YET.
  
 2- ENERGY CALCULATIONS WERE REVISED. NOW
 CEILING FAN CREDIT WAS TAKEN. THEREFORE,
 NEED TO REVISE ELECTRICAL PLAN SHOWING
 SIZE OF CEILING FANS, INCLUDING FANS IN
 THE GREAT ROOM AS REQUIRED BY TABLE 6-6
 OF CHAPTER 13 FBC 2001.
  
 3- ROOF FRAMING PLAN NEEDS TO BE REVISE
 AT ENTRY PORCH AREA TO MATCH FOUNDATION
 PLAN AND FLOOR PLAN. NOTICE THAT
 CONCRETE BEAM DOESN'T EXTEND ALL THE WAY
 INSIDE TO THE FOYER AREA. CONCRETE BEAM
 IS ONLY AT ENTRY PORCH AREA. REVISE AS
 REQUIRED, INCLUDING TRUSS CONNECTORS AS
 REQUIRED. SEC. 104.2.1.2 CITY AMENDMENTS
 TO FBC 2001.
  
 4- TRUSS ANCHOR SCHEDULE: REVISE NUMBER
 OF NAILS SPECIFIED FOR CONNECTOR HUS26.
 SEE 2005 CATALOGUE.
  
 5- ONE HOUR FIRE RATED DOOR AT ATRIUM
 PRODUCT APPROVAL SUBMITTED IS FOR
 OUTSWING DOOR. PROVIDE INSWING DOOR AS
 SHOWN ON PLANS OR REVISE PLANS AS REQ'D.
 ***NOTE; DOOR NEED NOT TO BE FIRE RATED.
 WALL IS CONSIDERED LIKE A FENCE NOT A
 BUILDING WALL. THEREFORE, TABLE 600 FBC
 2001 DOESN'T APPLY. REVISE PLANS IF
 SPECIFICATIONS CHANGE.
  
 6- WINDOW MULLION SIZE SPECIFIED FOR
 FIXED WINDOWS AT GREAT ROOM DOESN'T
 RESIST THE CALCULATED DESIGN PRESSURES.
 SEE PRODUCT APPROVAL AND REVISE SIZE OF
 MULLION AS REQUIRED. SEC. 104.2.1.2 CITY
 AMENDMENTS TO FBC 2001.
  
 7- ALL REVISED DRAWINGS WILL BE SUBJECT
 TO THE REVISION FEES. SEE SUBMITTAL FORM
 FOR APPLICABLE FEES.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ AT (561805-6712.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2005-06-10 Cont ID  
Sent By jgomez Date 2005-06-10 Time 18:04 Rev Time 1.00
Received By jgomez Date 2005-06-10 Time 18:04 Sent To E
Notes
2005-06-10 00:00:00BUILDING REVIEW PROVISO:
 1- SHUTTERS UNDER A SEPARATE PERMIT.
 2- REVISE ENERGY CALCULATIONS. NEED THEM
 TO BE CALCULATED FOR WORST CASE SCENARIO
 3- REVISE FRONT ELEVATION TO SHOW ENTRY
 DOORS AS SHOWN ON PRODUCT APPROVAL.
 4- ROOF FRAMING PLAN: REVISE CONNECTOR
 SPECIFIED AT ENTRY PORCH. NEED MASONRY
 CONNECTOR. SEE DETAIL 5/D-1.
 5- TRUSS ANCHOR SCHEDULE: REVISE TYPE OF
 NAIL USED FOR HUS26. SEE CATALOGUE.
 6- PROVIDE PRODUCT APPROVAL FOR: A) ONE
 HR FIRE RATED ASSEMBLY AT EGRESS OPENING
 B) 12'-0" WIDE SLIDING GLASS DOORS.
 C) 8'-0" HIGH ENTRY DOORS.
 7- PROVIDE CLEAR WINDOW AND DOOR
 SCHEDULES. NEED MATCHING SYMBOLS.
 8- PROVIDE COPY OF EGRESS EASEMENT.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2005-05-10 Cont ID  
Sent By jgomez Date 2005-05-10 Time 17:49 Rev Time 2.00
Received By jgomez Date 2005-05-10 Time 17:49 Sent To PC
Notes
2005-05-10 00:00:00BUILDING REVIEW CHECKLIST:
 1- NEED RECORDED NOTICE OF COMMENCEMENT.
  
 2- SOIL TEST REPORT RECOMMENDS 18" MIN.
 FOOTING WIDTH. FOUNDATION PLAN CALLS FOR
 16" WIDTH. REVISE AS REQUIRED.
  
 3- 45 DEGREE WINDOW ON BEDROOM #3 AT
 ZERO LOT LINE WALL IS NOT ALLOWED BY
 TABLE 600 FBC 2001. NO OPENINGS ALLOWED.
  
 4- PROVIDE NOTE ON DEN ROOM STATING THAT
 ROOM IS NOT ALLOWED TO BE USED FOR
 SLEEPING PURPOSES. OR, PROVIDE COMPLETE
 EGRESS REQUIREMENTS INCLUDING RECORDED
 EGRESS EASEMENT.
  
 5- PROVIDE DETAIL/SPECS FOR CEILING
 INSTALLATION AT ENTRY AND REAR PORCHES.
 SPECIFY FASTENERS TYPE AND SPACING . SEE
 SEC. 2504.2 FBC 2001.
  
 6- SPECIFY SUPPORTS AND SPACING FOR WWM
 IN CONCRETE SLAB. SEE EXCEPTION IN SEC.
 1909.3 FBC 2001.
  
 7- SPECIFY FOOTINGS FOR ENTRY COLUMNS.
 SEC. 104.2.1.2 CITY AMENDMENTS TO FBC.
  
 8- SHEET A-5.0:A) ROOF NAILING ZONE
 DIAPHRAGM IS MISSING ZONE 3. SEE FIGURE
 1606.2(C) FBC 2001.
  
 B) DETAIL 3 SPECIFIES HGUS 28-2 SIMPSON
 CONNECTOR IS A WOOD TO WOOD CONNECTOR.
 NEED TO SPECIFY CIFY WOOD TO MASONRY
 CONNECTOR. REVISE AS REQUIRED.
  
 C) DETAILS 1 AND 2: REVISE TYPE OF
 NAILS. SEE SIMPSON CATALOGUE.
  
 D) REVISE CONNECTOR SPECIFIED AT ENTRY
 PORCH. NEED MASONRY CONNECTOR. SEE
 DETAIL 5/D-1.
  
 9- REVISE/UPDATE TRUSS ANCHOR SCHEDULE.
 SEE LATEST CATALOGUE THAT WAS REVISED TO
 COMPLY WITH SEC. 1609.4.3 FBC 2001.
 PROVIDE COMPLETE ENGINEERING CALCS FOR
 TYPE AND NUMBER OF NAILS THAT DIFFER
 FROM THOSE TESTED AND PUBLISHED BY THE
 MANUFACTURER. SECTION 104.2.1.2 OF CITY
 AMENDMENTS TO FBC 2001.
  
 10- A)RIGHT SIDE ELEVATION DOESN'T MATCH
 PLANS. BATHROOM #2 HAS GLASS BLOCK NOT
 WINDOW.
  
 B) SHOW GLASS BLOCK ON LEFT ELEVATION TO
 MATCH PLAN.
  
 11- CLARIFY IF USING STORM SHUTTERS OR
 IMPACT GLAZING. THEN, PROVIDE COMPLETE
 INFORMATION FOR EITHER METHOD.
  
 12- PROVIDE FLORIDA/LOCAL PRODUCT
 APPROVAL FOR:A) ONE HOUR FIRE RATED
 ASSEMBLY AT EMERGENCY EGRESS OPENING.
  
 B) SLIDING GLASS DOORS. DRAWINGS
 SUBMITTED DON'T MATCH DADE COUNTY NOA
 SUBMITTED.
  
 C) PROVIDE PRODUCT APPROVAL FOR 12'-0"
 WIDE SLIDING GLASS DOORS. SEE PLANS.
  
 D) LARGE FIXED WINDOWS AS SHOWN ON GREAT
 ROOM. PRODUCT APPROVAL SUBMITTED DOESN'T
 COVER THOSE SIZES.
  
 E) ENTRY DOORS. DRAWINGS SUBMITTED ARE
 FOR 6'-8" HIGH DOORS. SEE PLANS.
  
 F) TRUSS CONNECTORS SPECIFIED ON PLANS.
 AFTER CORRECTIONS TO SPECIFY PROPER
 ANCHORS ARE DONE ON PLANS.
  
 13- SHEET D-1:A) CONNECTORS CS-16 X
 AND HTS-20 SHOWN ON DETAILS 3, 4 AND 5
 ARE WOOD TO WOOD CONNECTORS. NEED TO
 SPECIFY MASONRY CONNECTORS. SEE
 CATALOGUE AND REVISE AS REQUIRED. SEC.
 104.2.1.2 CITY AMENDMENTS TO FBC 2001.
  
 B) REVISE TYPE AND NUMBER OF NAILS FOR
 HUS26 CONNECTOR. SEE CATALOGUE.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ AT (561)805-6712.

Review Stop E ELECTRICAL
Rev No 4 Status F Date 2006-06-16 Cont ID  
Sent By dpalmer Date 2006-06-16 Time 07:46 Rev Time 0.00
Received By dpalmer Date 2006-06-16 Time 07:33 Sent To PC
Notes
2006-06-16 00:00:00************** UNSAT ***********
  
 1) NOTE: PLEASE SEE 250.52(5) FOR MIN
 SIZE OF THE GRND ROD.
 SHOWN AS 6 FT, 8FT MIN.
  
 2) NOTE: PLEASE SEE 424.3B FOR MIN OCP
 TO BE 125% FOR AHU'S.
 PLEASE SEE BOTH UNITS INDICATE 10KW, YET
 THE OCPIS WAY UNDERSIZED.
 PLEASE ALSO SEE 9.8KW LOAD INDICATED FOR
 THE CU#1, WHICH SEEMS HIGH FOR THE OCP
 AS SHOWN.
  
 3) NOTE: PLEASE SEE BACK COVERED PATIO
 SHALL CONTAIN A MIN LT FIXTURE OF SOME
 SORT FOR EGRESS.
 210.70, LS 101 7.8, CHAPTER 24.
  
 4) NOTE: PLEASE SEE A CIRCUIT #38 IS
 STILL BEING SHOWN ON PLANS FOR BATH RM ,
 YET PANEL SCHEDULE IS BLANK AT THIS
 LOCATION.
  
 ** SOME OF THESE SAME ITEMS WERE
 REDLINED ON PREVIOUS PLANS.
  
 PLEASE SUBMIT THE ABOVE CORRECTIONS FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW.
 561-805-6717
 [email protected]

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2006-01-17 Cont ID  
Sent By dpalmer Date 2006-01-17 Time 12:05 Rev Time 0.00
Received By dpalmer Date 2006-01-17 Time 11:39 Sent To PC
Notes
2006-01-17 00:00:00REDLINED,
  
 PLANS SHOWS POWDER RM AS CIRCUIT #38,
 HOWEVER PANEL SCHEDULE FOR THIS IS
 BLANK??

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2005-06-13 Cont ID  
Sent By dpalmer Date 2005-06-13 Time 15:25 Rev Time 0.33
Received By dpalmer Date 2005-06-13 Time 15:25 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2005-04-26 Cont ID  
Sent By dpalmer Date 2005-04-26 Time 11:12 Rev Time 0.30
Received By dpalmer Date 2005-04-26 Time 11:12 Sent To M
Notes
2005-04-26 00:00:00********** UNSAT *************
  
 1)NOTE: PLEASE SEE PANEL "A" SHOWS FEED
 TO PANEL "B" AS 100A OCP ON #6 AWG.
 PLEASE SEE 240.4,310.16 AND PLEASE
 CORRELATE WITH RISER DIAGRAM.
 PLEASE ALSO SEE THIS IS SHOWN AS 100A SP
 BRKR ON ONE PHASE? (MISPRINT)
  
 2)NOTE: PLEASE SEE PANEL "B" SHOWS SUB
 PANEL "C" IN TWO DIFFERENT LOCATIONS?
 PLEASE SEE THIS IS SHOWN ON SAME PHASE.
 PLEASE ALSO CORRELATE AWG FOR 60A OCP.
 SHOWS #6 AND #8?
 PLEASE ALSO SEE SINGLE POLE 60A FOR
 ADDITIONAL SUB PANEL.
 PLEASE SEE 240.4,310.16, 310.15B6
  
 3)NOTE: PLEASE SEE NOTE ADDED TO CENTER
 OF PLANS WHICH IS A PROVISO SET UP BY A
 PLAN REVIEWER FOR A PREVIOUS PROJECT.
 THIS COMMENT FROM OTHER ELECTRICAL PLAN
 REVIEW SHOULD NOT BE LOCATED ON THESE
 PLANS.
 PLEASE REMOVE.
  
 4)NOTE;PLEASE SEE MISSING RECEPT(S) PER
 210.52 C1, 210.8A6
  
 5)NOTE: PLEASE SEE ONE OF THE ABOVE
 CIRCUITS FOR SD'S (#38) IS THE SAME
 CIRCUIT ON PANEL SCHEDULE FOR SUB PANEL
 "B".
  
 6)NOTE: PLEASE PROVIDE ROOM DESIGNATIONS
 ON PLANS.
 215.5
  
 7)NOTE: PLEASE SHOW LOADS ON EACH
 ELECTRICAL PANEL. PANEL "B AND "C
 MENTIONS TO SEE LOAD CALCS, HOWEVER
 THESE PANELS NEED TO SHOW ACTUAL LOAD
 FOR THOSE PANELS.
 220,215.5
  
 8 )NOTE: PLEASE SEE 220.3B4.
 PLEASE SHOW ALL RECESSED LTS BASED ON
 MAX WATTAGE FOR FIXTURE(S). THIS MAY NOT
 BE FIGURED IN W/ 3W/PER SQ FT.
 PLEASE PROVIDE FIXTURE INFORMATION ON
 LEGEND.
  
 9)NOTE: PLEASE SEE PLANS REFERENCE 1999
 NEC FOR 210.12. WE HAVE BEEN UNDER THE
 2002 NEC SINCE JULY 1ST, 2003
  
 10)NOTE: PLEASE SEE PANEL SCHEDULE
 INDICATES A WHIRLPOOL TUB, YET PLANS DO
 NOT SHOW ANY ELECTRICAL FOR SAME.
 PLEASE SEE 680.24 FOR INDICATION OF GFI
 PROTECTION.
  
 PLEASE BE SURE TO REMOVE ALL OLD VOIDED
 SHEETS AND ONLY INSERT NEW REVISED
 SHEETS INTO TWO COMPLETE SETS FOR REVIEW
 AND STAMPING.
 PLEASE SEE ONE COPY/SET OF OLD SHEETS
 SHOULD BE SUBMITTED FOR REFERENCE ONLY.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 CONSTUCTION SERVICES DEPT.
 561-805-6717
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 9 Status N Date 2006-06-14 Cont ID  
Sent By adarroug Date 2006-06-14 Time 11:14 Rev Time 0.00
Received By adarroug Date 2006-06-14 Time 11:14 Sent To E
Notes
2006-06-14 00:00:00TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 8 Status N Date 2006-01-22 Cont ID  
Sent By adarroug Date 2006-01-22 Time 12:48 Rev Time 0.00
Received By adarroug Date 2006-01-22 Time 12:48 Sent To B
Notes
2006-01-22 00:00:00TO "JGOMEZ" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 7 Status N Date 2006-01-06 Cont ID  
Sent By adarroug Date 2006-01-06 Time 09:52 Rev Time 0.00
Received By adarroug Date 2006-01-06 Time 09:51 Sent To E
Notes
2006-01-06 00:00:00TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2005-12-29 Cont ID  
Sent By adarroug Date 2005-12-29 Time 10:59 Rev Time 0.00
Received By adarroug Date 2005-12-29 Time 10:59 Sent To B
Notes
2005-12-29 00:00:00TO "JGOMEZ" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2005-10-19 Cont ID  
Sent By adarroug Date 2005-10-19 Time 09:14 Rev Time 0.00
Received By adarroug Date 2005-10-19 Time 09:14 Sent To B
Notes
2005-10-19 00:00:00TO "JGOMEZ" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2005-07-29 Cont ID  
Sent By adarroug Date 2005-07-29 Time 16:32 Rev Time 0.00
Received By adarroug Date 2005-07-29 Time 16:32 Sent To B
Notes
2005-07-29 00:00:00TO "JGOMEZ" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2005-06-07 Cont ID  
Sent By mjacobs Date 2005-06-07 Time 09:40 Rev Time 0.00
Received By mjacobs Date 2005-06-07 Time 09:40 Sent To E
Notes
2005-06-08 00:00:00TO 'DP' DESK. RESUB.
2005-06-07 00:00:00LETTERS ARE IN PACKAGE PERMIT #05040909

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-04-26 Cont ID  
Sent By adarroug Date 2005-04-26 Time 09:20 Rev Time 0.00
Received By adarroug Date 2005-04-26 Time 09:20 Sent To E
Notes
2005-04-26 00:00:00TO "SFR" "E"

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-05-11 Cont ID  
Sent By jgomez Date 2005-05-11 Time 14:02 Rev Time 0.00
Received By jgomez Date 2005-04-18 Time 16:48 Sent To  
Notes
2005-04-18 00:00:00TO "Z" BOX

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2005-05-02 Cont ID  
Sent By prafter Date 2005-05-02 Time 11:15 Rev Time 0.50
Received By prafter Date 2005-05-02 Time 11:15 Sent To B
Notes
2005-05-02 00:00:00MECH PLAN REVIEW:
  
 PROVISO:
 AHU,S REQUIRES AUX. DRAIN PAN WITH
 DRAIN PROTECTION.2000 FBC/M 307.2.3 .
 PAT RAFTER 561/805/6728 OR 805/6719
 PATTY KRAUSS.
 PLEASE CALL IF THEAR ANY QUESTIONS.

Review Stop P PLUMBING
Rev No 2 Status P Date 2005-06-20 Cont ID  
Sent By kstevens Date 2005-06-20 Time 16:44 Rev Time 0.60
Received By kstevens Date 2005-06-20 Time 16:44 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2005-05-04 Cont ID  
Sent By jleech Date 2005-05-04 Time 15:36 Rev Time 0.33
Received By jleech Date 2005-05-04 Time 15:36 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2005-04-25 Cont ID  
Sent By mmclean Date 2005-04-25 Time 18:27 Rev Time 0.00
Received By mmclean Date 2005-04-25 Time 18:27 Sent To I
Notes
***NONE***