Plan Review Details - Permit 05040907
Plan Review Stops For Permit 05040907
Review Stop B BUILDING (STRUCTURAL)
Rev No 8 Status P Date 2006-01-03 Cont ID  
Sent By jgomez Date 2006-01-03 Time 16:22 Rev Time 0.50
Received By jgomez Date 2006-01-03 Time 16:22 Sent To P
Notes
2006-01-03 00:00:00REAR SLIDING GLASS DOOR REVISION.

Review Stop B BUILDING (STRUCTURAL)
Rev No 7 Status P Date 2005-12-30 Cont ID  
Sent By jgomez Date 2005-12-30 Time 15:05 Rev Time 0.33
Received By jgomez Date 2005-12-30 Time 15:05 Sent To PC
Notes
2005-12-30 00:00:00SLIDING GLASS DOOR REVISION.

Review Stop B BUILDING (STRUCTURAL)
Rev No 6 Status F Date 2005-11-15 Cont ID  
Sent By jgomez Date 2005-11-15 Time 12:14 Rev Time 0.50
Received By jgomez Date 2005-11-15 Time 12:14 Sent To PC
Notes
2005-11-15 00:00:00BUILDING SUBMITTAL CHECKLIST:
 1- CONTRACTOR TO APPLY FOR STORM SHUTTER
 UNDER A SEPARATE PERMIT AS AGREED ON
 PROVISO. APPLY AS SOON AS POSSIBLE TO
 AVOID DELAYS OR CONFLICTS SINCE WE ARE
 OVERWHELMED WITH PERMIT APLICATIONS DUE
 TO THE HURRICANE WILMA AND SHORTAGE OF
 PERSONNEL.
  
 2- LETTER SUBMITTED STATES THAT SLIDING
 GLASS DOORS WERE CHANGED. NEED TO REVISE
 DRAWINGS TO CHANGES. REVISION FEES WILL
 APPLY.
  
 JULIO GOMEZ
 BUILDING PLANS EXAMINER
 (561)805-6712.

Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status P Date 2005-10-07 Cont ID  
Sent By jgomez Date 2005-10-07 Time 11:12 Rev Time 0.33
Received By jgomez Date 2005-10-07 Time 11:12 Sent To E
Notes
2005-10-07 00:00:00SUBMITTED SECOND SET TO STAMP REVISED
 PLANS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2005-09-30 Cont ID  
Sent By jgomez Date 2005-09-30 Time 18:55 Rev Time 0.50
Received By jgomez Date 2005-09-30 Time 18:55 Sent To E
Notes
2005-09-30 00:00:00REVISED PLANS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2005-08-31 Cont ID  
Sent By jgomez Date 2005-08-31 Time 16:33 Rev Time 0.50
Received By jgomez Date 2005-08-31 Time 16:33 Sent To PC
Notes
2005-08-31 00:00:00SUBMITTAL BUILDING REVIEW CHECKLIST:
 1- SEPARATE PERMIT FOR SHUTTERS HAS NOT
 BEEN APPLIED FOR YET.
  
 2- REVISE DETAIL 5/D-1 TO MATCH ACTUAL
 CONDITIONS SHOWN ON ROOF FRAMING PLAN.
 TRUSSES ARE PARALLEL TO CONCRETE WALL
 NOT PERPENDICULAR. THEN, SPECIFY
 CONNECTOR FOR GIRDER TRUSS THAT IS
 CARRYING THE OTHER TRUSSES. SEE ROOF
 FRAMING PLAN AND REVISE AS REQUIRED.
 ***NOTE: BY REVISING DETAIL WILL CLARIFY
 THAT CONNECTOR HTS20 IS NOT ADEQUATE TO
 SUPPORT THE GIRDER TRUSS. SPECIFY THE
 CALCULATED UPLIFT LOADS FOR THIS GIRDER
 TRUSS AT THE END SUPPORTED ON THE WOOD
 LEDGER.SECTION 104.2.1.2 CITY
 AMENDMENTS TO FBC 2001.
  
 3- ALL REVISED DRAWINGS WILL BE SUBJECT
 TO THE REVISION FEES. SEE THE SUBMITTAL
 FORM FOR APPLICABLE FEES.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ AT (561)805-6712.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2005-06-09 Cont ID  
Sent By jgomez Date 2005-06-09 Time 11:28 Rev Time 2.00
Received By jgomez Date 2005-06-09 Time 11:27 Sent To E
Notes
2005-06-08 00:00:00BUILDING REVIEW PROVISO:
 1- SHUTTERS UNDER SEPARATE PERMIT.
 2- USING SAME ENERGY CALCULATIONS FOR
 THIS MODEL, THEREFORE, NEED ENERGY
 CALCULATIONS FOR WORST CASE SCENARIO.
 REVISE ENERGY CALCS AS REQUIRED.
 3- REVISE DOOR SCHEDULE TO MATCH SIZES &
 TYPE OF DOORS SHOWN ON PLANS/ELEVATIONS.
 4- DETAIL 5/D-1: CONNECTOR HTS20 CAN'T
 SUPPORT BEAM. SPECIFY HANGER OR CLARIFY
 HOW IS BEAM SUPPORTED ON LEDGER.
 5- TRUSS ANCHOR SCHEDULE: UPDATE NAIL
 SIZE USED FOR HUS26 CONNECTOR.
 6- ROOF FRAMING PLAN: REVISE CONNECTOR
 SPECIFIED AT ENTRY PORCH TO MATCH
 DETAILS 5 & 6 OF DRAWING D-1.
 7- PROVIDE PRODUCT APPROVAL FOR 9'-0"
 WIDE SLIDING GLASS DOORS.
 8- SHEET A-5.0 SHEAR VALUES NOTE:
 A) PROVIDE HAND CALCULATIONS. SECTION
 104.2.1.2 CITY AMENDEMNTS TO FBC 2001.
 B) WHY USING TIMBER CONSTRUCTION MANUAL?
 SEE CHAPTER 23 FBC 2001.
 C) WHY USING TIMBER MANUAL TO CALCULATE
 TAPCON VALUES?

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2005-05-09 Cont ID  
Sent By jgomez Date 2005-05-09 Time 18:48 Rev Time 2.50
Received By jgomez Date 2005-05-09 Time 18:48 Sent To PC
Notes
2005-05-09 00:00:00BUILDING REVIEW CHECKLIST:
 1- NEED RECORDED NOTICE OF COMMENCEMENT.
  
 2- SOIL TEST REPORT RECOMMENDS 18" MIN.
 WIDTH FOR FOOTING. FOUNDATION PLAN CALLS
 FOR 16" WIDTH. REVISE AS REQUIRED.
  
 3- PROVIDE DETAIL/SPECS FOR CEILING
 INSTALLATION AT ENTRY AND REAR PORCHES.
 SPECIFY FASTENERS TYPE AND SPACING. SEE
 ASTM C-926 AND ASTM C-1063.
 SEC. 2504.2 FBC 2001.
 NOTE: ALSO, REVISE NAILING SCHEDULE NOTE
 FOR WIRE LATH ON SHEET D-1. HOW CAN YOU
 ACHIEVE 1 3/4" MIN. PENETRATION IF NAIL
 SIZE IS 1 1/4". SEE ASTM C-1063.
  
 4- SHEET A-1: A) REVISE FOOTING
 SPECIFIED FOR CONCRETE PAD AT COVERED
 PATIO. SEE PLANS FOR COMMENTS.
  
 B) SPECIFY FOOTING FOR ENTRY COLUMNS.
 SEC. 104.2.1.2 CITY AMENDMETNS TO FBC
  
 5- SHEET A-2.0:A) CLARIFY HOW CAN YOU
 HAVE 12'-0" CEILING AT LIVING ROOM
 FAMILY ROOM IF EXTERIOR ELEVATION SHOWS
 TOP OF BEAM AT 13'-0". IS THERE A DROP
 IN THE ROOF TRUSSES?. BLDG SECTION
 DOESN'T SHOW THAT. PROVIDE BLDG SECTION.
 SEC. 104.2.1.2 CITY AMENDMENTS TO FBC.
  
 B) SPECIFY GLASS BLOCK TO BE 1 HOUR FIRE
 RATED ASSEMBLY AT ZERO LOT LINE WALL.
 AS REQ'D BY TABLE 600 FBC 2001.
  
 6- FLOOR PLAN AND REAR ELEVATIONS DON'T
 MATCH. SEE MASTER BEDROOM WINDOWS AND
 DOORS SPECIFIED AND REVISE TO MATCH.
  
 7- SHEET A-5.0:A) NAILING SCHEDULE
 DIAPHRAGM IS MISSING ROOF ZONE #3. SEE
 FIGURE 1606.2(C) FBC 2001 AND REVISE.
  
 B) CLARIFY WHERE ARE THE SHEAR VALUES
 FOR NAILS AND TAPCONS TAKEN FROM? SEC.
 104.2.1.2 CITY AMENDMENTS TO FBC 2001.
  
 C) TYPE OF BEAM SHOWN ON ROOF FRAMING
 PLAN AND EXTERIOR ELEVATIONS SHEET A-4.0
 DON'T MATCH. SEE DETAILS 6 AND 7 ON
 SHEET A-4.0 AND ROOF FRAMING PLAN.
 REVISE AS REQUIRED.
  
 D) TRUSS DESIGN CRITERIA CHART AND NOTE
 ON BOTTOM OF PAGE DON'T MATCH. SEE PLANS
 FOR COMMENTS.
  
 E) HGUS28-2 CONNECTOR SPECIFIED ON
 DETAIL #2 IS A WOOD TO WOOD CONNECTOR.
 NEED TO SPECIFY MASONRY CONNECTOR. SEE
 CATALOGUE AND REVISE AS REQUIRED.
  
 F) UPDATE/REVISE TRUSS ANCHOR SCHEDULE.
 SEE LATEST CATALOGUE THAT WAS REVISED TO
 COMPLY WITH SEC. 1609.4.3 FBC 2001.
 PROVIDE COMPLETE ENGINEERING CALCS FOR
 CONNECTORS WITH FASTENER TYPE AND
 NUMBER THAT DIFFERFROM THOSE TESTED
 AND PUBLISHED. SEC. 104.2.1.2 CITY
 AMENDMENTS TO FBC 2001.
  
 G) REVISE CONNECTORS SPECIFIED AT ENTRY
 PORCH BEAM. NEED MASONRY CONNECTOR. SEE
 DETAIL 6/D-1. AND REVISE TO MATCH. SEC.
 104.2.1.2 CITY AMENDMENTS TO FBC 2001.
  
 8- SHEET D-1:A) DETAIL #3 IS
 INCOMPLETE. MISSING HALF OF THE INFO.
  
 B) DETAILS 3,4,5 AND 6. REVISE
 CONNECTORSHTS-20, CS16X16" SPECIFIED.
 NEED MASONRY CONNECTORS. SEE CATALOGUE.
  
 9- CLARIFY IF USING IMPACT GLAZING IN
 DOORS/WINDOWS OR STORM SHUTTERS. PROVIDE
 COMPLETE INFO. FOR EITHER METHOD.
  
 10- PROVIDE FLORIDA OR LOCAL PRODUCT
 APPROVAL FOR: A) ENTRY DOORS. DRAWINGS
 SUBMITTED ARE FOR 6'-8" DOORS.
  
 B) ALL TRUSS ANCHORS SPECIFIED ON PLANS.
 AFTER CONNECTORS ARE REVISED.
  
 C) SLIDING GLASS DOORS WITH DRAWINGS
 THAT MATCH DADE COUNTY NOA. ALSO, NEED
 9'-0" WIDE SLIDING GLASS DOORS.
  
 D) FIXED LARGE WINDOWS AS SHOWN ON
 BREAKFAST AREA AND LIVING ROOM AREA.
 PRODUCT APPROVAL SUBMITTED DOESN'T COVER
 THESE WINDOW SIZES.
  
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ AT (561)805-6712.

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2006-01-17 Cont ID  
Sent By dpalmer Date 2006-01-17 Time 14:32 Rev Time 0.00
Received By dpalmer Date 2006-01-17 Time 14:32 Sent To  
Notes
2006-01-17 00:00:00REDLINED
  
  
 OCP FOR AHU#2 125% MIN, 424.3B
  
 CIRCUITING FOR BATH CIRCUIT SHOWN AS #25
 ON PLANS, HOWEVER PANEL SCHEDULE SHOWS
 COOKTOP.

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2005-10-07 Cont ID  
Sent By dpalmer Date 2005-10-07 Time 14:48 Rev Time 0.33
Received By dpalmer Date 2005-10-07 Time 14:48 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2005-06-13 Cont ID  
Sent By dpalmer Date 2005-06-13 Time 16:11 Rev Time 0.30
Received By dpalmer Date 2005-06-13 Time 16:10 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2005-04-26 Cont ID  
Sent By dpalmer Date 2005-04-26 Time 10:22 Rev Time 0.30
Received By dpalmer Date 2005-04-26 Time 10:22 Sent To M
Notes
2005-04-26 00:00:00********** UNSAT *************
  
 1)NOTE: PLEASE SEE PANEL "A" SHOWS FEED
 TO PANEL "B" AS 100A OCP ON #6 AWG.
 PLEASE SEE 240.4,310.16 AND PLEASE
 CORRELATE WITH RISER DIAGRAM.
 PLEASE ALSO SEE THIS IS SHOWN AS 100A SP
 BRKR ON ONE PHASE? (MISPRINT)
  
 2)NOTE: PLEASE SEE PANEL "B" SHOWS SUB
 PANEL "C" IN TWO DIFFERENT LOCATIONS?
 PLEASE SEE THIS IS SHOWN ON SAME PHASE.
 PLEASE ALSO CORRELATE AWG FOR 60A OCP.
 SHOWS #6 AND #8?
 PLEASE ALSO SEE SINGLE POLE 60A FOR
 ADDITIONAL SUB PANEL.
 PLEASE SEE 240.4,310.16, 310.15B6
  
 3)NOTE: PLEASE SEE NOTE ADDED TO CENTER
 OF PLANS WHICH IS A PROVISO SET UP BY A
 PLAN REVIEWER FOR A PREVIOUS PROJECT.
 THIS COMMENT FROM OTHER ELECTRICAL PLAN
 REVIEW SHOULD NOT BE LOCATED ON THESE
 PLANS.
 PLEASE REMOVE.
  
 4)NOTE;
  
 5)NOTE: PLEASE SEE ONE OF THE ABOVE
 CIRCUITS FOR SD'S (#38) IS THE SAME
 CIRCUIT ON PANEL SCHEDULE FOR SUB PANEL
 "B".
  
 6)NOTE: PLEASE PROVIDE ROOM DESIGNATIONS
 ON PLANS.
 215.5
  
 7)NOTE: PLEASE SHOW LOADS ON EACH
 ELECTRICAL PANEL. PANEL "B AND "C
 MENTIONS TO SEE LOAD CALCS, HOWEVER
 THESE PANELS NEED TO SHOW ACTUAL LOAD
 FOR THOSE PANELS.
 220,215.5
  
 8 )NOTE: PLEASE SEE 220.3B4.
 PLEASE SHOW ALL RECESSED LTS BASED ON
 MAX WATTAGE FOR FIXTURE(S). THIS MAY NOT
 BE FIGURED IN W/ 3W/PER SQ FT.
 PLEASE PROVIDE FIXTURE INFORMATION ON
 LEGEND.
  
 9)NOTE: PLEASE SEE PLANS REFERENCE THE
 1999 NEC FOR 210.12. WE ARE UNDER THE
 2002 NEC.JULY 1ST, 2003
  
 PLEASE BE SURE TO REMOVE ALL OLD VOIDED
 SHEETS AND ONLY INSERT NEW REVISED
 SHEETS INTO TWO COMPLETE SETS FOR REVIEW
 AND STAMPING.
 PLEASE SEE ONE COPY/SET OF OLD SHEETS
 SHOULD BE SUBMITTED FOR REFERENCE ONLY.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 CONSTUCTION SERVICES DEPT.
 561-805-6717
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 9 Status N Date 2006-01-06 Cont ID  
Sent By adarroug Date 2006-01-06 Time 09:53 Rev Time 0.00
Received By adarroug Date 2006-01-06 Time 09:53 Sent To E
Notes
2006-01-06 00:00:00TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 8 Status N Date 2005-12-30 Cont ID  
Sent By adarroug Date 2005-12-30 Time 09:24 Rev Time 0.00
Received By adarroug Date 2005-12-30 Time 09:24 Sent To B
Notes
2005-12-30 00:00:00TO "JGOMEZ" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 7 Status N Date 2005-12-14 Cont ID  
Sent By adarroug Date 2005-12-14 Time 14:09 Rev Time 0.00
Received By adarroug Date 2005-12-14 Time 14:09 Sent To B
Notes
2005-12-14 00:00:00TO "JGOMEZ" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2005-10-14 Cont ID  
Sent By adarroug Date 2005-10-14 Time 10:43 Rev Time 0.00
Received By adarroug Date 2005-10-14 Time 10:43 Sent To B
Notes
2005-10-14 00:00:00TO "JGOMEZ" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2005-09-29 Cont ID  
Sent By adarroug Date 2005-09-29 Time 19:06 Rev Time 0.00
Received By adarroug Date 2005-09-29 Time 19:06 Sent To B
Notes
2005-09-29 00:00:00TO "JGOMEZ' DESK/RESTAMP

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2005-07-29 Cont ID  
Sent By adarroug Date 2005-07-29 Time 16:31 Rev Time 0.00
Received By adarroug Date 2005-07-29 Time 16:31 Sent To B
Notes
2005-07-29 00:00:00TO "JGOMEZ" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2005-06-07 Cont ID  
Sent By mjacobs Date 2005-06-07 Time 09:42 Rev Time 0.00
Received By mjacobs Date 2005-06-07 Time 09:42 Sent To B
Notes
2005-06-07 00:00:00TO 'JGOMEZ' DESK.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-04-26 Cont ID  
Sent By adarroug Date 2005-04-26 Time 09:21 Rev Time 0.00
Received By adarroug Date 2005-04-26 Time 09:21 Sent To E
Notes
2005-04-26 00:00:00TO "SFR" "E"

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-05-09 Cont ID  
Sent By jgomez Date 2005-05-09 Time 18:56 Rev Time 0.00
Received By jgomez Date 2005-04-18 Time 16:47 Sent To  
Notes
2005-04-18 00:00:00TO "Z" BOX

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2005-05-02 Cont ID  
Sent By prafter Date 2005-05-02 Time 09:11 Rev Time 0.50
Received By prafter Date 2005-05-02 Time 09:11 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 4 Status P Date 2006-01-04 Cont ID  
Sent By jleech Date 2006-01-04 Time 09:37 Rev Time 0.33
Received By jleech Date 2006-01-04 Time 09:37 Sent To  
Notes
2006-01-04 00:00:00REVISIED RISER DIAGRAM

Review Stop P PLUMBING
Rev No 3 Status P Date 2005-10-12 Cont ID  
Sent By jleech Date 2005-10-12 Time 15:43 Rev Time 0.00
Received By jleech Date 2005-10-12 Time 15:43 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2005-06-20 Cont ID  
Sent By jleech Date 2005-06-20 Time 16:45 Rev Time 0.25
Received By jleech Date 2005-06-20 Time 16:45 Sent To B
Notes
2005-06-20 00:00:00RE-STAMP

Review Stop P PLUMBING
Rev No 1 Status P Date 2005-05-05 Cont ID  
Sent By jleech Date 2005-05-05 Time 14:36 Rev Time 0.33
Received By jleech Date 2005-05-05 Time 14:36 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2005-04-25 Cont ID  
Sent By mmclean Date 2005-04-25 Time 18:24 Rev Time 0.00
Received By mmclean Date 2005-04-25 Time 18:24 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy