Plan Review Details - Permit 05040905
Plan Review Stops For Permit 05040905
Review Stop B BUILDING (STRUCTURAL)
Rev No 7 Status P Date 2006-02-28 Cont ID  
Sent By jgomez Date 2006-02-28 Time 14:03 Rev Time 0.33
Received By jgomez Date 2006-02-28 Time 14:03 Sent To P
Notes
2006-02-28 00:00:00DRAWING A-1.0 SUBMITTAL.

Review Stop B BUILDING (STRUCTURAL)
Rev No 6 Status F Date 2006-02-15 Cont ID  
Sent By jgomez Date 2006-02-14 Time 16:39 Rev Time 0.40
Received By jgomez Date 2006-02-15 Time 07:45 Sent To P
Notes
2006-02-14 00:00:00BUILDING REVISION CHECKLIST:
 1- PLUMBING RISER DIAGRAM ON SHEET A-1.0
 IS PART OF THE CONSTRUCTION DOCUMENTS
 SUBMITTED BY THE ARCHITECT. IT CAN'T BE
 CROSSED OUT. SUBMIT CLEAN DRAWING TO
 ROUTE TO THE PROPER REVIEW TRADES.
  
 JULIO GOMEZ
 BUILDING PLANS EXAMINER
 (561)805-6712

Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status F Date 2006-01-18 Cont ID  
Sent By jgomez Date 2006-01-18 Time 17:20 Rev Time 0.50
Received By jgomez Date 2006-01-18 Time 17:20 Sent To PC
Notes
2006-01-18 00:00:00BUILDING REVISION CHECKLIST:
 1- DRAWING A-1.0 INCLUDES PLUMBING RISER
 DIAGRAM AND IT WAS CROSS OUT WITH THE
 WORDS NIC.PLUMBING RISER DIAGRAM IS
 PART OF THE CONSTRUCTION DOCUMENTS AND
 IT CAN'T BE CROSSED OUT. RE-SUBMIT CLEAN
 DRAWINGS.
  
 JULIO GOMEZ
 BUILDING PLANS EXAMINER
 (561)805-6712

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2005-09-21 Cont ID  
Sent By dpalmer Date 2006-01-10 Time 09:43 Rev Time 0.50
Received By jgomez Date 2005-09-21 Time 12:08 Sent To PC
Notes
2005-09-21 00:00:00CORRECTED DRAWINGS AND REQUESTED PRODUCT
 APPROVALS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2005-08-16 Cont ID  
Sent By jgomez Date 2005-08-16 Time 14:00 Rev Time 1.00
Received By jgomez Date 2005-08-16 Time 14:00 Sent To PC
Notes
2005-08-16 00:00:00BUILDING REVISION REVIEW CHECKLIST:
 1- UNABLE TO FIND THE REVISIONS. EXCEPT
 FOR ADDITIONAL DETAILS ON SHEET D2. WHAT
 WAS THE REVISION FOR?.
  
 2- PROVIDE INFORMATION REQ'D ON PROVISO
 DATED 6-30-05.
  
 A) APPLY FOR SHUTTERS PERMIT.
  
 B) PROVIDE REVISED ENERGY CALCS FOR
 WORST CASE SCENARIO.
  
 C) REVISE DOOR/WINDOW SCHEDULE TO MATCH
 PLANS WITHOUT MIXMATCHING EACH OTHER.
 EG: DOORS ON WINDOW SCHEDULE & VICEVERSA
  
 D) REVISE DETAIL5/D-1: HTS20 CAN'T
 SUPPORT GIRDER TRUSS.
  
 E) TRUSS ANCHOR SCHEDULE: UPDATE NAIL
 SIZE FOR HUS26. SEE CATALOGUE.
  
 F) ROOF FRAMING PLAN: REVISE CONNECTORS
 AT ENTRY PORCH TO MATCH DETAILS 5 AND 6
 OF DRAWINGS D-1.
  
 G) PROVIDE FLORIDA OR LOCAL PRODUCT
 APPROVAL FOR:
 * 9'-0" WIDE SLIDING GLASS DOORS.
 **8'-0" HIGH ENTRY DOORS.
  
 H) SHEET A-5.0 SHEAR VALUE NOTE: PROVIDE
 CALCULATED HAND CALCULATIONS FOR SHEAR
 VALUES FOR NAILS AND TAPCONS AS
 SPECIFIED ON THE NOTE. WHY USING TIMBER
 MANUAL TO CALCULATE TAPCON VALUES?
 SPECIFIED EDITION OF THE MANUAL USED.
 SECTION 104.2.1.2 CITY AMENDMENTS TO FBC
  
 I) PROVIDE REVISED SOIL TEST REPORT.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ AT (561)805-6712.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2005-06-30 Cont ID  
Sent By jgomez Date 2005-06-30 Time 12:14 Rev Time 2.00
Received By jgomez Date 2005-06-30 Time 12:14 Sent To PC
Notes
2005-06-30 00:00:00BUILDING REVIEW PROVISO:
 1- SHUTTERS UNDER A SEPARATE PERMIT.
 2- PROVIDE REVISED ENERGY CALCULATIONS
 WITH WORST CASE SCENARIO CALCS.
 3- REVISE DOOR/WINDOW SCHEUDLES TO MATCH
 PLANS. INCLUDING SYMBOLS USED.
 4- DETAIL 5/D-1: CONNECTOR HTS20 CANN'T
 SUPPORT BEAM. REVISE AS REQUIRED. SEC.
 104.2.1.2 CITY AMENDMENTS TO FBC 2001.
 5- TRUSS ANCHOR SCHEDULE: UPDATE NAIL
 SIZE FOR HUS26. SEE CATALOGUE.
 6- ROOF FRAMING PLAN: REVISE CONNECTOR
 AT ENTRY PORCH TO MATCH DETAILS 5 AND 6
 OF DRAWING D-1.
 7- PROVIDE PRODUCT APPROVAL FOR:
 A) 9'-0" WIDE SLIDING GLASS DOORS.
 B) 8'-0" HIGH ENTRY DOORS.
 8- SHEET A-5 SHEAR VALUE NOTE:
 A) PROVIDE HAND CALCULATIONS. SECTION
 104.2.1.2 CITY AMENDMENTS TO FBC 2001.
 B) WHY USING TIMBER MANUAL TO CALCULATE
 TAPCON VALUES?
 C) SPECIFY EDITION OF THE MANUAL USED.
 9- PROVIDE REVISED SOIL TEST REPORT.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2005-05-20 Cont ID  
Sent By jgomez Date 2005-05-20 Time 08:14 Rev Time 0.25
Received By jgomez Date 2005-05-20 Time 08:14 Sent To PC
Notes
2005-05-20 00:00:00CHECKLIST:
  
 1- MEETING WITH RON ELLISH. HE REQUESTED
 TO LOG OUT PLANS TO MAKE CORRECTIONS
 BASED ON COMMENTS PREVIOUSLY DONE TO
 SAME MODEL.

Review Stop E ELECTRICAL
Rev No 7 Status P Date 2006-02-09 Cont ID  
Sent By dpalmer Date 2006-02-09 Time 08:52 Rev Time 0.00
Received By dpalmer Date 2006-02-09 Time 08:52 Sent To B
Notes
2006-02-09 00:00:00** REDLINED **
  
 VERIFY OCP FOR CU, SHOWS 9.8KW, 40A OCP
  
 MIN 8' GROUND ROD REQUIRED PER 250.52A
  
 VERIFY MIN OCP FOR AHU#2, PER 424.3B,
 MIN OCP 125%.

Review Stop E ELECTRICAL
Rev No 6 Status P Date 2006-01-17 Cont ID  
Sent By dpalmer Date 2006-01-17 Time 13:13 Rev Time 0.00
Received By dpalmer Date 2006-01-17 Time 13:12 Sent To PC
Notes
2006-01-17 00:00:00REDLINED,
  
 OCP FOR AHU#2 TO BE SIZED A MIN OF 125%.
 PER 424.3B
  
 MISSING RECEPT WITHIN 6' OF DOOR / DEN

Review Stop E ELECTRICAL
Rev No 5 Status F Date 2006-01-10 Cont ID  
Sent By dpalmer Date 2006-01-10 Time 11:10 Rev Time 0.00
Received By dpalmer Date 2006-01-10 Time 11:10 Sent To B
Notes
2006-01-10 00:00:00******* UNSAT ********
  
 1)NOTE: PLEASE SEE THIS IS THE 2ND
 REVISION FOR THE SAME PROJECT WHICH CAME
 IN ON THE SAME DATE, HOWEVER THEY ARE
 TWO SEPARATE PLANS.
  
 PLEASE VERIFY.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE IN CONTACTING
 THIS OFFICE.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]

Review Stop E ELECTRICAL
Rev No 4 Status F Date 2006-01-10 Cont ID  
Sent By dpalmer Date 2006-01-09 Time 10:00 Rev Time 0.00
Received By dpalmer Date 2006-01-09 Time 10:00 Sent To B
Notes
2006-01-09 00:00:00********* UNSAT **********
  
  
 1)NOTE: PLEASE SEE PANEL "A" IS MISSING
 LOAD FROM PANEL "B"AND "C".
 PLEASE ALSO SEE LOADS ON PANEL "B" AND
 "C". SOME ARE SHOWN WITH 83 KW, 96, KW
 ETC.
 PLEASE ADJUST LOADS AND CALCUALTIONS.
 220, 215.5
  
 2)NOTE: PLEASE SEE MISSING RECEPT PER
 210.52
  
 3)NOTE: PLEASE SEE A RECEPT IS STILL
 BEING SHOWN IN THE LOCATION OF THE NEW
 SLIDING GLASS DOORS.?? THIS HAS BEEN
 REMOVED ON SOME OTHER PLANS, HOWEVER NOT
 THIS PLAN.
 PLEASE SEE THIS WOULD BE A TRIPPING
 HAZARD AND NOT BE PERMITTED IN THIS
 EGRESS LOCATION.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE IN CONTACTING
 THIS OFFICE.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2005-08-08 Cont ID  
Sent By dpalmer Date 2005-08-08 Time 15:56 Rev Time 0.30
Received By dpalmer Date 2005-08-08 Time 15:51 Sent To P
Notes
2005-08-08 00:00:00REV'S.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2005-06-13 Cont ID  
Sent By dpalmer Date 2005-06-13 Time 16:29 Rev Time 0.30
Received By dpalmer Date 2005-06-13 Time 16:29 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2005-04-26 Cont ID  
Sent By dpalmer Date 2005-04-26 Time 11:04 Rev Time 0.30
Received By dpalmer Date 2005-04-26 Time 11:04 Sent To M
Notes
2005-04-26 00:00:00********** UNSAT *************
  
 1)NOTE: PLEASE SEE PANEL "A" SHOWS FEED
 TO PANEL "B" AS 100A OCP ON #6 AWG.
 PLEASE SEE 240.4,310.16 AND PLEASE
 CORRELATE WITH RISER DIAGRAM.
 PLEASE ALSO SEE THIS IS SHOWN AS 100A SP
 BRKR ON ONE PHASE? (MISPRINT)
  
 2)NOTE: PLEASE SEE PANEL "B" SHOWS SUB
 PANEL "C" IN TWO DIFFERENT LOCATIONS?
 PLEASE SEE THIS IS SHOWN ON SAME PHASE.
 PLEASE ALSO CORRELATE AWG FOR 60A OCP.
 SHOWS #6 AND #8?
 PLEASE ALSO SEE SINGLE POLE 60A FOR
 ADDITIONAL SUB PANEL.
 PLEASE SEE 240.4,310.16, 310.15B6
  
 3)NOTE: PLEASE SEE NOTE ADDED TO CENTER
 OF PLANS WHICH IS A PROVISO SET UP BY A
 PLAN REVIEWER FOR A PREVIOUS PROJECT.
 THIS COMMENT FROM OTHER ELECTRICAL PLAN
 REVIEW SHOULD NOT BE LOCATED ON THESE
 PLANS.
 PLEASE REMOVE.
  
 4)NOTE;
  
 5)NOTE: PLEASE SEE ONE OF THE ABOVE
 CIRCUITS FOR SD'S (#38) IS THE SAME
 CIRCUIT ON PANEL SCHEDULE FOR SUB PANEL
 "B".
  
 6)NOTE: PLEASE PROVIDE ROOM DESIGNATIONS
 ON PLANS.
 215.5
  
 7)NOTE: PLEASE SHOW LOADS ON EACH
 ELECTRICAL PANEL. PANEL "B AND "C
 MENTIONS TO SEE LOAD CALCS, HOWEVER
 THESE PANELS NEED TO SHOW ACTUAL LOAD
 FOR THOSE PANELS.
 220,215.5
  
 8 )NOTE: PLEASE SEE 220.3B4.
 PLEASE SHOW ALL RECESSED LTS BASED ON
 MAX WATTAGE FOR FIXTURE(S). THIS MAY NOT
 BE FIGURED IN W/ 3W/PER SQ FT.
 PLEASE PROVIDE FIXTURE INFORMATION ON
 LEGEND.
  
 9)NOTE: PLEASE SEE PLANS REFERENCE 1999
 NEC FOR 210.12. WE HAVE BEEN UNDER THE
 2002 NEC SINCE JULY 1ST, 2003
  
 PLEASE BE SURE TO REMOVE ALL OLD VOIDED
 SHEETS AND ONLY INSERT NEW REVISED
 SHEETS INTO TWO COMPLETE SETS FOR REVIEW
 AND STAMPING.
 PLEASE SEE ONE COPY/SET OF OLD SHEETS
 SHOULD BE SUBMITTED FOR REFERENCE ONLY.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 CONSTUCTION SERVICES DEPT.
 561-805-6717
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 8 Status N Date 2006-02-03 Cont ID  
Sent By adarroug Date 2006-02-03 Time 12:02 Rev Time 0.00
Received By adarroug Date 2006-02-03 Time 12:02 Sent To E
Notes
2006-02-03 00:00:00TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 7 Status N Date 2006-01-06 Cont ID  
Sent By adarroug Date 2006-01-06 Time 09:53 Rev Time 0.00
Received By adarroug Date 2006-01-06 Time 09:53 Sent To E
Notes
2006-01-06 00:00:00TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2005-12-30 Cont ID  
Sent By adarroug Date 2005-12-30 Time 09:28 Rev Time 0.00
Received By adarroug Date 2005-12-30 Time 09:28 Sent To E
Notes
2005-12-30 00:00:00TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2005-08-24 Cont ID  
Sent By adarroug Date 2005-08-24 Time 10:37 Rev Time 0.00
Received By adarroug Date 2005-08-24 Time 10:37 Sent To B
Notes
2005-08-24 00:00:00TO "JGOMEZ" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2005-08-03 Cont ID  
Sent By adarroug Date 2005-08-03 Time 15:54 Rev Time 0.00
Received By adarroug Date 2005-08-03 Time 15:54 Sent To E
Notes
2005-08-03 00:00:00TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2005-06-08 Cont ID  
Sent By shill Date 2005-06-08 Time 09:31 Rev Time 0.00
Received By shill Date 2005-06-08 Time 09:31 Sent To E
Notes
2005-06-08 00:00:00TO DP DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-04-26 Cont ID  
Sent By adarroug Date 2005-04-26 Time 09:19 Rev Time 0.00
Received By adarroug Date 2005-04-26 Time 09:19 Sent To E
Notes
2005-04-26 00:00:00TO "SFR" "E"

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-05-20 Cont ID  
Sent By jgomez Date 2005-05-20 Time 08:17 Rev Time 0.00
Received By jgomez Date 2005-04-15 Time 14:32 Sent To PC
Notes
2005-04-15 00:00:00TO "Z" BOX

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2005-05-05 Cont ID  
Sent By pkrauss Date 2005-05-05 Time 08:06 Rev Time 0.25
Received By pkrauss Date 2005-05-05 Time 08:06 Sent To B
Notes
2005-05-05 00:00:00PLEASE NOTE PLANS ARE "UPSIDE DOWN" TO
 BUILDING PLAN.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2005-05-02 Cont ID  
Sent By prafter Date 2005-05-02 Time 08:49 Rev Time 0.50
Received By prafter Date 2005-05-02 Time 08:49 Sent To B
Notes
2005-05-02 00:00:00MECH. PLAN REVIEW.
  
 A/C PLAN NOT SAME AS REFLECTED HOME.
  
 PAT RAFTER 561/805/6728 OR 805/6719
 PATTY KRAUSS.
 PLEASE CALL IF THEAR ANY QUESTIONS.

Review Stop P PLUMBING
Rev No 5 Status P Date 2006-02-28 Cont ID  
Sent By jleech Date 2006-02-28 Time 17:30 Rev Time 0.00
Received By jleech Date 2006-02-28 Time 17:30 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 4 Status F Date 2006-02-16 Cont ID  
Sent By jleech Date 2006-02-16 Time 15:11 Rev Time 0.25
Received By jleech Date 2006-02-16 Time 15:11 Sent To B
Notes
2006-02-16 00:00:00PLEASE DO NOT "X" OUT PARTS OF THE PLAN.
 IF REVISIONS ARE REQUIRED THE PLANS NEED
 TO BE REVIEW AND RESTAMPED BY ALL TRADES
 INVALVED.
 JOHN LEECH
 805-6695

Review Stop P PLUMBING
Rev No 3 Status P Date 2005-08-13 Cont ID  
Sent By jleech Date 2005-08-13 Time 07:11 Rev Time 0.33
Received By jleech Date 2005-08-13 Time 07:11 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2005-06-20 Cont ID  
Sent By jleech Date 2005-06-20 Time 16:09 Rev Time 0.25
Received By jleech Date 2005-06-20 Time 16:09 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2005-05-04 Cont ID  
Sent By jleech Date 2005-05-04 Time 14:54 Rev Time 0.33
Received By jleech Date 2005-05-04 Time 14:53 Sent To M
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2005-04-25 Cont ID  
Sent By mmclean Date 2005-04-25 Time 18:32 Rev Time 0.00
Received By mmclean Date 2005-04-25 Time 18:32 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved