Plan Review Stops For Permit 05040903 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
6 |
Status |
P |
Date |
2006-02-28 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2006-02-28 |
Time |
14:16 |
Rev Time |
0.33 |
Received By |
jgomez |
Date |
2006-02-28 |
Time |
14:16 |
Sent To |
P |
|
Notes |
2006-02-28 00:00:00 | DRAWING A-1.0 SENT TO PLUMBING. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
5 |
Status |
F |
Date |
2006-02-15 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2006-02-15 |
Time |
07:55 |
Rev Time |
0.40 |
Received By |
jgomez |
Date |
2006-02-15 |
Time |
07:55 |
Sent To |
P |
|
Notes |
2006-02-15 00:00:00 | BUILDING REVISION CHECKLIST: | | 1- PLUMBING RISER DIAGRAM IS PART OF THE | | CONSTRUCTION DOCUMENTS SUBMITTED BY THE | | ARCHITECT AND IT WAS CROSSED OUT. SUBMIT | | CLEAN COPIES TO ROUTE PLANS FOR PROPER | | REVIEW TRADES. | | | | JULIO GOMEZ | | BUILDING PLANS EXAMINER | | (561)805-6712 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
F |
Date |
2006-01-18 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2006-02-09 |
Time |
07:29 |
Rev Time |
0.50 |
Received By |
jgomez |
Date |
2006-01-18 |
Time |
07:45 |
Sent To |
PC |
|
Notes |
2006-01-18 00:00:00 | BUILDING REVISION CHECKLIST: | | 1- DRAWING A-1.0 INCLUDES PLUMBING RISER | | DIAGRAM AND IT WAS CROSS OUT WITH THE | | WORDS NIC. THIS PLUMBING RISER DIAGRAM | | IS PART OF THE CONSTRUCTION DOCUMENTS | | AND IT CAN'T BE CROSSED OUT.RESUBMIT | | CLEAN DRAWINGS. | | | | JULIO GOMEZ | | BUILDING PLANS EXAMINER | | (5610805-6712 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2005-09-21 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2005-09-21 |
Time |
15:16 |
Rev Time |
0.50 |
Received By |
jgomez |
Date |
2005-09-21 |
Time |
15:16 |
Sent To |
PC |
|
Notes |
2005-09-21 00:00:00 | CORRECTED PLANS AND REQUESTED PRODUCT | | APPROVAL AND ENERGY CALCS. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2005-06-29 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2005-06-29 |
Time |
17:18 |
Rev Time |
2.00 |
Received By |
jgomez |
Date |
2005-06-29 |
Time |
17:18 |
Sent To |
PC |
|
Notes |
2005-06-29 00:00:00 | BUILDING REVIEW PROVISO: | | 1- SHUTTERS UNDER A SEPARATE PERMIT. | | 2- REVISE ENERGY CALCULATIONS TO BE | | WORST CASE SCENARIO. | | 3- REVISE DOOR AND WINDOW SCHEDULE TO | | MATCH FLOOR PLAN. INCLUDING SYMBOL USED. | | 4- DETAIL 5/D-1; CONNECTOR HTS20 CAN'T | | SUPPORT BEAM. REVISE AS REQUIRED. SEC. | | 104.2.1.2 CITY AMENDMENTS TO FBC 2001. | | 5- TRUSS ANCHOR SCHEDULE: UPDATE NAIL | | SIZE FOR HUS26 CONNECTOR. SEE CATALOGUE. | | 6- ROOF FRAMING PLAN: REVISE CONNECTOR | | SPECIFIED AT ENTRY PORCH TO MATCH | | DETAILS 5 & 6 OF DRAWINGS D-1. | | 7- PROVIDE PRODUCT APPROVAL FOR 9'-0" & | | 12'-0" WIDE SLIDING GLASS DOORS. | | 8- SHEET A-5.0 SHEAR VALUES NOTE: | | PROVIDE THE HAND CALCULATIONS. SECTION | | 104.2.1.2 CITY AMENDMENTS TO FBC 2001. | | B) SPECIFY EDITION OF THE MANUAL. | | C)WHY USING TIMBER MANUAL FOR TAPCONS. | | SEC. 104.2.1.2 CITY AMENDMENTS TO FBC. | | 9- REVISE REAR ELEVATION: 12'-0" WIDE | | SLIDING GLASS DOOR IS DRAWN INCORRECTLY. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2005-05-20 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2005-05-20 |
Time |
08:06 |
Rev Time |
0.25 |
Received By |
jgomez |
Date |
2005-05-20 |
Time |
08:04 |
Sent To |
PC |
|
Notes |
2005-05-20 00:00:00 | CHECKLIST: | | 1- MEETING WITH RON ELLISH. HE REQUESTED | | TO LOG OUT PLANS TO MAKE CORRECTIONS | | BASED ON PREVIOUS COMMENTS TO SAME | | MODEL. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
4 |
Status |
P |
Date |
2006-02-09 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2006-02-09 |
Time |
07:28 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2006-02-09 |
Time |
07:28 |
Sent To |
B |
|
Notes |
2006-02-09 00:00:00 | ** REDLINED ** | | | | VERIFY OCP FOR CU, SHOWS 9.8KW, 40A OCP | | | | MIN 8' GROUND ROD REQUIRED PER 250.52A | | | | VERIFY MIN OCP FOR AHU#2, PER 424.3B, | | MIN OCP 125%. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
P |
Date |
2006-02-03 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2006-02-03 |
Time |
17:29 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2006-02-03 |
Time |
17:29 |
Sent To |
PC |
|
Notes |
2006-02-03 00:00:00 | | | | | PLEASE SEE MIN GRND ROD 8' PER | | 250.52A5 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2005-06-13 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2005-06-13 |
Time |
17:12 |
Rev Time |
0.25 |
Received By |
dpalmer |
Date |
2005-06-13 |
Time |
17:12 |
Sent To |
P |
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2005-04-26 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2005-04-26 |
Time |
10:05 |
Rev Time |
0.50 |
Received By |
dpalmer |
Date |
2005-04-26 |
Time |
10:05 |
Sent To |
M |
|
Notes |
2005-04-26 00:00:00 | ********** UNSAT ************* | | | | 1)NOTE: PLEASE SEE PANEL "A" SHOWS FEED | | TO PANEL "B" AS 100A OCP ON #6 AWG. | | PLEASE SEE 240.4,310.16 AND PLEASE | | CORRELATE WITH RISER DIAGRAM. | | PLEASE ALSO SEE THIS IS SHOWN AS 100A SP | | BRKR ON ONE PHASE? (MISPRINT) | | | | 2)NOTE: PLEASE SEE PANEL "B" SHOWS SUB | | PANEL "C" IN TWO DIFFERENT LOCATIONS? | | PLEASE SEE THIS IS SHOWN ON SAME PHASE. | | PLEASE ALSO CORRELATE AWG FOR 60A OCP. | | SHOWS #6 AND #8? | | PLEASE ALSO SEE SINGLE POLE 60A FOR | | ADDITIONAL SUB PANEL. | | PLEASE SEE 240.4,310.16, 310.15B6 | | | | 3)NOTE: PLEASE SEE NOTE ADDED TO CENTER | | OF PLANS WHICH IS A PROVISO SET UP BY A | | PLAN REVIEWER FOR A PREVIOUS PROJECT. | | THIS COMMENT FROM OTHER ELECTRICAL PLAN | | REVIEW SHOULD NOT BE LOCATED ON THESE | | PLANS. | | PLEASE REMOVE. | | | | 4)NOTE; | | | | 5)NOTE: PLEASE SEE ONE OF THE ABOVE | | CIRCUITS FOR SD'S (#38) IS THE SAME | | CIRCUIT ON PANEL SCHEDULE FOR SUB PANEL | | "B". | | | | 6)NOTE: PLEASE PROVIDE ROOM DESIGNATIONS | | ON PLANS. | | 215.5 | | | | 7)NOTE: PLEASE SHOW LOADS ON EACH | | ELECTRICAL PANEL. PANEL "B AND "C | | MENTIONS TO SEE LOAD CALCS, HOWEVER | | THESE PANELS NEED TO SHOW ACTUAL LOAD | | FOR THOSE PANELS. | | 220,215.5 | | | | 8 )NOTE: PLEASE SEE 220.3B4. | | PLEASE SHOW ALL RECESSED LTS BASED ON | | MAX WATTAGE FOR FIXTURE(S). THIS MAY NOT | | BE FIGURED IN W/ 3W/PER SQ FT. | | PLEASE PROVIDE FIXTURE INFORMATION ON | | LEGEND. | | | | 9)NOTE: PLEASE SEE PLANS REFERENCE THE | | 1999 NEC FOR 210.12. WE ARE UNDER THE | | 2002 NEC. | | | | PLEASE BE SURE TO REMOVE ALL OLD VOIDED | | SHEETS AND ONLY INSERT NEW REVISED | | SHEETS INTO TWO COMPLETE SETS FOR REVIEW | | AND STAMPING. | | PLEASE SEE ONE COPY/SET OF OLD SHEETS | | SHOULD BE SUBMITTED FOR REFERENCE ONLY. | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | REVIEW. IF THERE ARE ANY QUESTIONS, | | PLEASE DO NOT HESITATE TO CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | CITY OF WEST PALM BEACH | | CONSTUCTION SERVICES DEPT. | | 561-805-6717 | | [email protected] | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
6 |
Status |
N |
Date |
2006-02-01 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2006-02-01 |
Time |
18:15 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2006-02-01 |
Time |
18:15 |
Sent To |
E |
|
Notes |
2006-02-01 00:00:00 | TO "DPALMER" DESK/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
2006-01-27 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2006-01-27 |
Time |
15:47 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2006-01-27 |
Time |
15:47 |
Sent To |
E |
|
Notes |
2006-01-27 00:00:00 | TO "DPALMER" DESK/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2005-08-24 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-08-24 |
Time |
18:58 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-08-24 |
Time |
18:58 |
Sent To |
B |
|
Notes |
2005-08-24 00:00:00 | TO "JGOMEZ" DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2005-06-08 |
|
|
Cont ID |
|
Sent By |
mjacobs |
Date |
2005-06-08 |
Time |
09:37 |
Rev Time |
0.00 |
Received By |
mjacobs |
Date |
2005-06-08 |
Time |
09:37 |
Sent To |
E |
|
Notes |
2005-06-08 00:00:00 | TO 'DP' DESK/RESUB. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2005-04-26 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-04-26 |
Time |
09:21 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-04-26 |
Time |
09:21 |
Sent To |
E |
|
Notes |
2005-04-26 00:00:00 | TO "SFR" "E" |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2005-05-20 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2005-05-20 |
Time |
08:07 |
Rev Time |
0.25 |
Received By |
jgomez |
Date |
2005-04-18 |
Time |
16:45 |
Sent To |
PC |
|
Notes |
2005-04-18 00:00:00 | TO "Z" BOX |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
P |
Date |
2005-05-02 |
|
|
Cont ID |
|
Sent By |
prafter |
Date |
2005-05-02 |
Time |
10:55 |
Rev Time |
0.50 |
Received By |
prafter |
Date |
2005-05-02 |
Time |
10:54 |
Sent To |
B |
|
Notes |
2005-05-02 00:00:00 | MECH. PLAN REVIEW: | | | | PRIVISO: | | AHU #2 REQUIRES AUX.DRAIN PAN WITH | | DRAIN PROTECTION. 2000 FBC/M 307.2.3 . | | PAT RAFTER 561/805/6728 OR 805/6719 | | PATTY KRAUSS. | | PLEASE IF THEAR ANY QUESTIONS. |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
4 |
Status |
P |
Date |
2006-02-28 |
|
|
Cont ID |
|
Sent By |
jleech |
Date |
2006-02-28 |
Time |
17:22 |
Rev Time |
0.00 |
Received By |
jleech |
Date |
2006-02-28 |
Time |
17:22 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
F |
Date |
2006-02-16 |
|
|
Cont ID |
|
Sent By |
jleech |
Date |
2006-02-16 |
Time |
14:40 |
Rev Time |
0.25 |
Received By |
jleech |
Date |
2006-02-16 |
Time |
14:40 |
Sent To |
B |
|
Notes |
2006-02-16 00:00:00 | PLEASE DONOT "X" OUT PARTS OF THE PLAN. | | IF REVISIONS ARE REQUIRED THE PLANS MEED | | TO REVIEWED AND RESTAMPED BY ALL TRADES | | INVALVED. | | JOHN LEECH | | 805-6695 |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2005-06-20 |
|
|
Cont ID |
|
Sent By |
jleech |
Date |
2005-06-20 |
Time |
16:16 |
Rev Time |
0.25 |
Received By |
jleech |
Date |
2005-06-20 |
Time |
16:16 |
Sent To |
B |
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2005-05-05 |
|
|
Cont ID |
|
Sent By |
jleech |
Date |
2005-05-05 |
Time |
14:01 |
Rev Time |
0.33 |
Received By |
jleech |
Date |
2005-05-05 |
Time |
14:01 |
Sent To |
B |
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2005-04-25 |
|
|
Cont ID |
|
Sent By |
mmclean |
Date |
2005-04-25 |
Time |
18:21 |
Rev Time |
0.00 |
Received By |
mmclean |
Date |
2005-04-25 |
Time |
18:21 |
Sent To |
I |
|
Notes |
|
|