Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2005-04-18 Cont ID  
Sent By jgomez Date 2005-04-18 Time 17:52 Rev Time 1.00
Received By jgomez Date 2005-04-18 Time 17:52 Sent To PC
Notes
2005-04-18 00:00:00BUILDING REVIEW PROVISO:
 1- PROVIDE SURVEY THAT MATCHES FLOOR
 PLANS. REVISE LAYOUT AND DIMENSIONS.
  
 2- CORRECT TYPO ON TRUSS ANCHOR
 SCHEDULE. SIZE OF CONCRETE FASTENER IS
 2 3/4" LONG NOT 3/4". AND CORRECT NAME
 IS TITEN SCREWS, NOT TITAN SCREWS.
  
 3- PROVIDE COMPLETE FLORIDA OR LOCAL
 PRODUCT APPROVAL FOR ENTRY DOORS AND
 FRENCH DOORS TO BE USED. MAKE SURE
 REPORTS AND DRAWINGS ARE LEGIBLE.
  
 4- PROVIDE FLORIDA OR LOCAL PRODUCT
 APPROVAL FOR ONE HR FIRE RATED ASSEMBLY
 EMERGENCY EGRESS AT GARDEN COURT.

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2005-04-15 Cont ID  
Sent By jgomez Date 2005-04-15 Time 12:06 Rev Time 3.00
Received By jgomez Date 2005-04-15 Time 12:06 Sent To P
Notes
2005-04-15 00:00:00THIRD CHECKLIST:
 1- TRUSS ANCHOR SCHEDULE:
 A) CONNECTOR #5 HUSC412 COULD NOT BE
 FOUND IN THE CATALOGUE.
  
 B) COPIES OF SIMPSON CATALOGUE SUBMITTED
 CLEARLY INDICATE THAT THESE ARE WOOD TO
 WOOD CONNECTORS. AND , NONE OF THEM IS A
 HUSC412.
  
 C) NEED TO SPECIFY WOOD TO MASONRY
 CONNECTOR. SEE SIMPSON CATALOGUE FOR
 WOOD TO MASONRY APPLICATIONS.
  
 D) CONNECTOR #5 HUSC412 SHOWN ON THE
 CONNECTOR SCHEDULE CALLS FOR 10 TAPCONS,
 WHILE FOOTNOTE **CALLS FOR 12 TAPCONS.
 INFORMATION DOESN'T MATCH.
  
 E) ON PREVIOUS CHECKLIST IT WAS
 REQUESTED TO UPDATE TRUSS ANCHOR
 SCHEDULE BY CHECKING USP/SIMPSON LATEST
 CATALOGUES WHICH WERE REVISED TO COMPLY
 WITH SEC. 1609.4.3 FBC 2001. OR,
 OTHERWISE, TO PROVIDE COMPLETE
 ENGINEERING CALCULATIONS SHOWING
 COPMPLIANCE WITH SEC. 1609.4.3 FBC WHEN
 TYPE AND NUMBER OF NAILS ARE DIFFERENT
 THAN THOSE ALREADY TESTED AND PUBLISHED
 BY THE MANUFACTURER.
 THIS WAS NOT DONE. PROVIDE COMPLETE
 ENGINEERING CALCULATIONS SHOWING HOW
 DOES CONNECTOR #5 PROVIDE SPECIFIED
 LOADS USING 10 (OR 12) TAPCONS 3/16 X 2
 1/4, WHILE 2005 SIMPSON CATALOGUE PAGE
 128 SHOWS CONNECTOR HU410 (WHICH IS THE
 CONNECTOR THAT NEEDS TO BE SPECIFIED FOR
 THE DESIRED APPLICATION) SHOWS THAT
 USING 18 TITEN 1/4 X 2 3/4 WILL BE GOOD
 FOR 1505 UPLIFT.
 SEC. 104.2.1.2 CITY AMENDMENTS TO FBC
 2001.
  
 F) CALLED SIMPSON COMPANY AND WAS TOLD
 THAT THE "S" SPECIFIED ON CONNECTORS HUS
 STANDS FOR SHEAR. CONNECTOR HUS412 WAS
 TESTED FOR SHEAR IN WOOD TO WOOD
 APPLICATIONS AND NOT IN WOOD TO MASONRY
 APPLICATIONS. THEREFORE, THIS
 ADDITTIONAL LOAD SHALL NOT BE CONSIDERED
 IN MASONRY CONNECTORS. THEREFORE,
 CONNECTOR SHALL NOT HAVE THE "S" WHEN
 SPECIFIED FOR MASONRY APPLICATION.
  
 G) REVIEWALL TRUSS ANCHOR SCHEDULE AND
 FOOTNOTES AND REVISE/UPDATE AS REQUIRED
 TO MEET MANUFACTURER TESTED & PUBLISHED
 VALUES OR PROVIDE COMPLETE ENGINEERING
 ANALYSIS WHEN DEVIATING FROM THE
 CATALOGUE. SECTION 104.2.1.2 CITY
 AMENDMENTS TO FBC 2001.
  
 2- SURVEY SUBMITTED DOESN'T MATCH PLANS.
 A) IT DOESN'T INCLUDE THE COVERED PORCH.
 B) DIMENSIONS SHOWN ON SURVEY DON'T
 MATCH PLANS. IDENTIFY WHICH DIMENSIONS
 ARE CORRECT. THE ONES IN THE SURVEY OR
 THE ONES IN PLANS AND REVISE AS REQ'D.
  
 3- MISSING FLORIDA OR LOCAL PRODUCT
 APPROVAL FOR:
 A) ENTRY DOORS. NOT SUBMITTED THIS TIME.
 B) SINGLE FRENCH DOORS AS SHOWN ON
 PLANS. PRODUCT APPROVAL SUBMITTED IS FOR
 DOUBLE DOORS WITH SIDELITES OR SINGLE
 DOOR WITH SIDELITES.
  
 4- NEED TO REVISE DETAIL FOR ARCHED
 WINDOWS. SEE ARCHED WINDOW PRODUCT
 APPROVAL FOR SPACING REQUIRED TO FASTEN
 WINDOW TO STRUCTURAL BUCK AND REVISE 2X4
 BLOCKING SPACING REQUIRED TO RECEIVE
 WINDOW FASTENERS.
  
 5- OWES $3552.55 WHICH WAS NOT PAID AT
 TIME OF PERMIT APLICATION PLUS
 RE-SUBMITTAL FEES.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ AT (561)805-6712.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2005-04-12 Cont ID  
Sent By jgomez Date 2005-04-12 Time 14:11 Rev Time 3.00
Received By jgomez Date 2005-04-12 Time 14:08 Sent To PC
Notes
2005-04-12 00:00:00BUILDING REVIEW 2ND CHECKLIST:
 1-
 BUILDING REVIEW 2ND CHECKLIST:
  
 1- EAST ELEVATION EXCEEDS MAXIMUM
 PERCENTAGE OF OPENING ALLOWED BY TABLE
 600 FBC 2001 AT GARDEN COURT. TOTAL
 OPENING AREA IS 169SF (PLUS/MINUS) NOT
 64SF.
  
 2- REVISED SURVEY SHOWING HOUSE LAYOUT
 WAS NOT SUBMITTED.
  
 3- ARCHITECT'S RESPONSE TO CHECKLIST
 DATED 3-04-05 WAS THAT FIREPLACE WAS
 DELETED. DRAWINGS STILL SHOW THE
 FIREPLACE. CLARIFY AS REQUIRED.
  
 4- SPECIFY SIZE OF HOOD ROOF SCREENS
 SHOWN ON THE ELEVATIONS. SEC. 104.2.1.2
 CITY AMENDMETNS TO FBC 2001 AND SECTION
 2309.7 FBC 2001.
  
 5- CLARIFY SIZE OF FOOTING FOR PRIVACY
 WALL AT GARDEN COURT. NOTESON SHEET
 S-1 CALL FOR 10"DEEP FOOTING WHILE,
 DETAIL CALLS FOR 12" DEEP FOOTING.
 CLARIFY AS REQUIRED.
  
 6- TRUSS ANCHOR SCHEDULE: A) CLARIFY
 WHERE IS CONNECTOR HUSC412 TAKEN FROM?.
 UNABLE TO FIND IT IN THE SIMPSON
 CATALOGUE.
 NOTE: NEED WOOD TO MASONRY CONNECTOR.
  
 B) UPDATE TRUSS ANCHOR SCHEDULE. SEE
 LATESTSIMPSON AND USP CATALOGUES FOR
 SIZE AND NUMBER OF FASTENERS TO BE USED.
 CATALOGUES WERE REVISED TO COMPLY WITH
 SEC. 1609.4.3 FBC 2001. PROVIDE COMPLETE
 ENGINEERING CALCULATIONS THAT COMPLY
 WITH SEC. 1609.4.3 FBC 2001 FOR TYPE AND
 NUMBER OF FASTENERS THAT DIFFER FROM
 THOSE TESTED AND PUBLISHED BY THE
 MANUFACTURER.
  
 7- PROVIDE FLORIDA OR LOCAL PRODUCT
 APPROVAL FOR: A) ENTRY DOORS. NEED
 IMPACT GLAZING.
 B) USP USC63 TRUSS CONNECTOR AND ALL
 CONNECTORS THAT ARE SPECIFIED ON THE
 TRUSS ANCHOR SCHEDULE.
 C) SLIDING GLASS DOORS WITH IMPACT
 GLAZING.
 D) FRENCH DOORS. IMPACT GLAZING.
 E) ARCHED WINDOWS AS SHOWN ON PLANS WITH
 IMPACT GLASS.
 F) WINDOW MULLIONS THAT MEET THE DESIGN
 PRESSURES CALCULATED BY THE ARCHITECT.
 CLEARLY MARK ON PRODUCT APPROVAL
 SPECIFIC MULLION SIZE AND FASTENERS TO
 BE USED TO VERIFY DESIGN PRESSURES.
 G) CASEMENT WINDOWS AS SHOWN ON REAR
 ELEVATION.
  
 8- FLOOR PLAN AND NOTES ON REAR
 ELEVATION CALL FOR SINGLE HUNG WINDOWS.
 EXTERIOR REAR ELEVATION SHOWS CASEMENT
 WINDOW WITH FIXED WINDOW IN THE MIDDLE.
 CLARIFY/REVISE AS REQUIRED.
  
 9-DETAIL FRAMING FOR ARCHED WINDOWS
 CALLS FOR 2X4'S @ 24" O.C. CLARIFY HOW
 IS WINDOW ATTACHED. SEE WINDOW PRODUCT
 APPROVAL. SEC. 104.2.1.2 CITY AMENDMENTS
 TO FBC 2001.
  
 10- NEED RECORDED NOTICE OF
 COMMENCEMENT.
  
 11- OWES $3552.55. PERMIT APPLICANT
 DIDN'T PAY FOR THE PERMIT AT TIME OF
 APPLICATION.
 ADDITIONAL FEES WILL BE CHARGED FOR
 RE-SUBMITTAL FEES AFTER 1ST RE-SUB.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ AT (561)805-6712.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2005-03-04 Cont ID  
Sent By jgomez Date 2005-03-03 Time 16:52 Rev Time 3.00
Received By jgomez Date 2005-03-04 Time 16:44 Sent To PC
Notes
2005-03-04 00:00:00BUILDING REVIEW CHECKLIST:
 1- EAST ELEVATION EXCEEDS MAXIMUM
 PERCENTAGE OF OPENING ALLOWED BY TABLE
 600 FBC 2001 AT GARDEN COURT.
  
 2- PROVIDE DESIGN SPECS FOR 30PSF ATTIC
 LIVE LOAD AS REQUIRED BY TABLE 1604.1
 FBC 2001.
  
 3- LAYOUT SHOWN ON SURVEY DOESN'T MATCH
 PLANS. REVISE AS REQUIRED.
  
 4- AN EGRESS EASEMENT (3'-0" MIN.) NEED
 TO BE RECORDED IN THE COUNTY RECORDS
 WHENUSING ADJOINING LOT FOR EGRESS AS
 REQUIRED BY THE BUILDING OFFICIAL.
  
 5- PROVIDE COMPLETE SPECS/DETAILS FOR
 CEILING INSTALLATION AT ENTRY AND REAR
 PORCHES. SPECIFY FASTENER TYPE AND
 SPACING AS REQUIRED BY ASTM C-926 AND
 ASTM C-1063. SEC. 2504.2 FBC 2001.
  
 6- PROVIDE COMPLETE BATHROOM (POWDER
 ROOM IS NOT A COMPLETE BATHROOM) WITH
 DOOR THAT ALLOWS 29" MIN. CLEAR OPENING
 AS REQ'D BY SEC. 11-11 FBC 2001.
  
 7- PROVIDE FIREPLACE UL LISTING AND
 COMPLETE SPECS AS REQUIRED BY SECTION
 2806 FBC 2001.
  
 8- PROVIDE KNEE WALL SECTION/DETAIL AT
 ENTRY PORCH SPECIFYING ALL FASTENERS.
 SECTION 104.2.1.2 CITY AMENDMENTS TO FBC
  
  
 9- SPECIFY SIZE OF CONTINUOUS
 VENTILATION AT ATTIC AREA AND HOOD ROOF
 SCREEN. SEC. 2309.7 FBC 2001.
  
 10- PRIVACY WALL FOOTING AT GARDEN COURT
 IS ENCROACHING INTO ADJACENT PROPERTY.
 REVISE AS REQUIRED.
  
 11- CLARIFY SIZE OF INTERIOR BEARING
 WALL. 2X4'S OR 2X6'S? SEE SHEET S-2.
  
 12- SPECIFY CONNECTORS AT THE ENDS OF
 ENTRY PORCH BEAM. SECTION 104.2.1.2 OF
 CITY AMENDMENTS TO FBC 2001.
  
 13- CLARIFY WHICH METHOD OF GLASS
 PROTECTION IS GOING TO BE USED: SHUTTERS
 OR MISSILE IMPACT GLAZING ON DOORS AND
 WINDOWS. BOTH WERE SUBMITTED.
 **PROVIDE COMPLETE INFORMATION FOR
 EITHER OPTION WITH LEGIBLE DRAWINGS.
  
 14- PROVIDE FLORIDA OR LOCAL PRODUCT
 APPROVAL FOR:
 A) "INSWING" ENTRY DOORS. SEE PLANS.
 B) USP USC63 TRUSS CONNECTOR.
 C) SLIDING GLASS DOORS (DWGS SUBMITTED
 WITH FLORIDA PRODUCT APPROVAL ARE FOR
 FRENCH DOORS).
 D) SAME DRAWINGS FOR THERMA-TRU DOORS
 THAT WERE SUBMITTED FOR FLORIDA PRODUCT
 APPROVAL.
 E) SMALL AND LARGE GARAGE DOORS WITH
 LEGIBLE DRAWINGS.
 F) WINDOW MULLIONS.(DRAWINGS SUBMITTED
 ARE FOR SLIDING GLASS DOORS).
  
 15- BBQ GRILL SPECIFICATIONS DOESN'T
 ALLOW TO BUILD GRILL UNDER UNPROTECTED
 COMBUSTIBLE CONSTRUCTION AND UNIT IS FOR
 OUTDOOR USE ONLY. PROVIDE MANUFACTURER'S
  
 SPECS THAT ALLOW INSTALLATION OF GRILL
 IN THE PORCH.
  
 16- REVISE GENERAL NOTES ON SHEET A-1.
 STUCCO ON METHAL LATH TO BE 7/8" MIN. AS
 REQUIRED BY ASTM C-926.
 SAFETY GLASS TO COMPLY WITH ANZI Z97.1,
 NOT ABS1-Z97.1.
  
 17- TYPICAL EXTERIOR WALL SEC. HAS 2
 DIFFERENT SPECS FOR ROOF SHEATHING
 NAILING. CLARIFY SPACING OF NAILS. SEE
 COMMENTS AND TABLE 2306.1 CITY
 AMENDMENTS TO FBC 2001.
  
 18- CONNECTOR #3 SPECIFIED ON ROOF
 FRAMING PLAN DOESN'T RESIST THE 2717#
 UPLIFT LOAD CALCULATED BY THE ENTRY
 PORCH GIRDER TRUSS. REVISE AS REQ'D.
 SEC. 104.2.1.2 CITY AMENDMENTS TO FBC.
  
 19- PROVIDE COMPLETE DETAIL FOR FRAMING
 OF ARCHED OPENINGS TO RECEIVE WINDOWS.
 SEC. 104.2.1.2 CITY AMENDMENTS TO FBC.
  
 20- TYPICAL CMU PIER DETAIL: SPECIFY
 SIZE OF FOOTING AND EMBEDMENT BELOW
 GRADE. SPECIFY PIER HEIGHT. SECTION
 104.2.1.2 CITY AMENDMENTS TO FBC 2001.
  
 21- PLEASE PROVIDE ONLY THE DETAILS THAT
 APPLY TO THIS PROJECT TO EXPEDITE REVIEW
 PROCESS AND AVOID CONFLICTS.
  
 22- NEED RECORDED NOTICE OF COMMENCEMENT
  
 23- OWES $3552.55 FOR PERMIT. PERMIT
 FEES WERE NOT PAID AT TIME OF
 APPLICATION.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ AT (561)805-6712.

Review Stop E ELECTRICAL
Rev No 8 Status P Date 2006-07-06 Cont ID  
Sent By btrobaug Date 2006-07-06 Time 17:04 Rev Time 0.50
Received By btrobaug Date 2006-07-06 Time 16:38 Sent To PC
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 7 Status P Date 2006-06-15 Cont ID  
Sent By btrobaug Date 2006-06-15 Time 06:30 Rev Time 0.50
Received By btrobaug Date 2006-06-15 Time 06:15 Sent To PC
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 6 Status P Date 2006-01-10 Cont ID  
Sent By btrobaug Date 2006-01-10 Time 15:39 Rev Time 0.50
Received By btrobaug Date 2006-01-10 Time 15:02 Sent To PC
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 5 Status P Date 2006-01-10 Cont ID  
Sent By btrobaug Date 2006-01-10 Time 15:02 Rev Time 0.50
Received By btrobaug Date 2005-12-23 Time 12:03 Sent To PC
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2005-12-02 Cont ID  
Sent By btrobaug Date 2005-12-02 Time 11:48 Rev Time 0.50
Received By btrobaug Date 2005-12-02 Time 11:48 Sent To PC
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2005-12-02 Cont ID  
Sent By btrobaug Date 2005-12-02 Time 11:19 Rev Time 0.50
Received By btrobaug Date 2005-12-02 Time 10:52 Sent To PC
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2005-03-29 Cont ID  
Sent By dpalmer Date 2005-03-29 Time 10:42 Rev Time 0.40
Received By dpalmer Date 2005-03-29 Time 10:41 Sent To P
Notes
2005-03-29 00:00:00REDLINED 210.52 FOR MISSING RECEPT.
  
 PLEASE SEE 220.3B4.
 PLEASE SHOW ALL RECESSED LTS BASED ON
 MAX WATTAGE FOR FIXTURE(S). THIS MAY NOT
 BE FIGURED IN W/ 3W/PER SQ FT.
 PLEASE PROVIDE FIXTURE INFORMATION ON
 LEGEND.

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2005-02-18 Cont ID  
Sent By btrobaug Date 2005-02-18 Time 09:26 Rev Time 0.50
Received By btrobaug Date 2005-02-18 Time 07:33 Sent To M
Notes
2005-02-18 00:00:00PLEASE MAKE THE FOLLOWING CORRECTIONS
 FOR CODE COMPLIANCE AND RESUBMIT FOR
 REVIEW.
  
  
 1} THE WHIRLPOOL MUST BE GFI PROTECTED
 PER 680.43(A)(3)NEC.
  
 2} THE WHIRLPOOL IS NOT LISTED ON THE
 PANEL SCHEDULE.
  
 3} RECEPTACLES NEED TO BE ADDED TO THE
 KITCHEN COUNTERTOP TO COMPLY WITH
 SPACING REQUIREMENTS OF 210.52(C)(1).
  
 4} THE DISCONNECT FOR CU#2 DOES NOT
 APPEAR TO HAVE CLEARANCE PER 110.26.
  
 IF THERE ARE ANY QUESTIONS PLEASE CALL.
  
 BILL TROBAUGH
 ELECTRICAL PLAN REVIEW
 561/805-6718
 [email protected]
 FAX/:561/659-8026
  

Review Stop I INCOMING/PROCESSING
Rev No 10 Status N Date 2006-06-30 Cont ID  
Sent By adarroug Date 2006-06-30 Time 16:31 Rev Time 0.00
Received By adarroug Date 2006-06-30 Time 16:31 Sent To E
Notes
2006-06-30 00:00:00TO "BTROBAUG" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 9 Status N Date 2006-06-08 Cont ID  
Sent By adarroug Date 2006-06-08 Time 13:33 Rev Time 0.00
Received By adarroug Date 2006-06-08 Time 13:33 Sent To E
Notes
2006-06-08 00:00:00TO "BTROBAUG" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 8 Status N Date 2006-03-03 Cont ID  
Sent By adarroug Date 2006-03-03 Time 12:12 Rev Time 0.00
Received By adarroug Date 2006-03-03 Time 12:12 Sent To P
Notes
2006-03-03 00:00:00TO "P" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 7 Status N Date 2006-01-10 Cont ID  
Sent By ptjomsto Date 2006-01-10 Time 13:15 Rev Time 0.00
Received By ptjomsto Date 2006-01-10 Time 13:15 Sent To  
Notes
2006-01-10 00:00:00REV GIVEN TO BILL TROBAUGH

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2005-12-01 Cont ID  
Sent By adarroug Date 2005-12-01 Time 16:14 Rev Time 0.00
Received By adarroug Date 2005-12-01 Time 16:14 Sent To E
Notes
2005-12-01 00:00:00TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2005-10-17 Cont ID  
Sent By adarroug Date 2005-10-17 Time 11:15 Rev Time 0.00
Received By adarroug Date 2005-10-17 Time 11:15 Sent To E
Notes
2005-10-17 00:00:00TO "E" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2005-04-18 Cont ID  
Sent By adarroug Date 2005-04-18 Time 16:47 Rev Time 0.00
Received By adarroug Date   Time   Sent To B
Notes
2005-04-18 00:00:00TO "JGOMEZ" BOX

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2005-03-21 Cont ID  
Sent By adarroug Date 2005-03-21 Time 16:20 Rev Time 0.00
Received By adarroug Date 2005-03-21 Time 16:20 Sent To E
Notes
2005-03-21 00:00:00TO "BTROBAUG" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-02-17 Cont ID  
Sent By adarroug Date 2005-02-17 Time 13:27 Rev Time 0.00
Received By adarroug Date 2005-02-17 Time 13:27 Sent To E
Notes
2005-02-17 00:00:00TO E/SFRACK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-02-07 Cont ID  
Sent By mjacobs Date 2005-02-07 Time 09:54 Rev Time 0.00
Received By mjacobs Date 2005-02-07 Time 09:54 Sent To Z
Notes
2005-02-07 00:00:00TO "Z" BOX.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2005-02-24 Cont ID  
Sent By prafter Date 2005-02-24 Time 08:21 Rev Time 0.50
Received By prafter Date 2005-02-24 Time 08:21 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 4 Status P Date 2006-03-09 Cont ID  
Sent By jleech Date 2006-03-09 Time 07:52 Rev Time 0.00
Received By jleech Date 2006-03-09 Time 07:52 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status P Date 2005-04-15 Cont ID  
Sent By kstevens Date 2005-04-15 Time 18:22 Rev Time 0.33
Received By kstevens Date 2005-04-15 Time 18:22 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2005-04-02 Cont ID  
Sent By kstevens Date 2005-04-02 Time 09:57 Rev Time 0.50
Received By kstevens Date 2005-04-02 Time 09:57 Sent To B
Notes
2005-04-02 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 CHAPTER 1
  
 1) SHT P-2 SANITARY RISER DIAGRAM DOES
 NOT REFLECT THE FLOOR PLAN, NOT DOES IT
 MEET CODE REQUIREMENTS:
 A) WASH MACHINE IS NOT VENTED, AND AS
 DRAWN THE TRAP IS UNDER THE SLAB.
 SECTION 901.2.1.
 B) SHOWER BATH NEXT TO KITCHEN SANT.
 RISER DOES NOT REFLECT THE PIPING SHOWN
 ON SHT P-1. SEE RED LINE CORRECTIONS TO
 REFLECT FLOOR PLAN. SECTION 104.2.1.
 C) VENT FOR W/C IN MASTER BATH IS A
 HORIZONTAL DRY VENT IF PIPED AS SHOWN.
 SECTIONS 905.3 & 905.4
 D) SHOWER IN MASTER BATH SHALL BE TO
 THE RIGHT OF THE BRANCH LINE TO REFLECT
 THE FLOOR PLAN SHT P-1. SECTION 104.2.1.
 E) THE SIZE OF THE DRAINAGE PIPING SHALL
 NOT BE REDUCED IN SIZE IN THE DIRECTION
 OF FLOW. SECTION 704.2 (SEE PIPE SIZE
 DOWNSTREAM OF THE M/B W/C).
 (SEE ALL REDLINE COMMENTS, CORRECTIONS,
 AND EXAMPLES ON ONE SET OF PLANS)
 2) SHT P-1 PLUMBING NOTES #12, AIR
 CHAMBERS ARE NOT APPROVED. DELETE
 REFERENCE FROM NOTES.
 3) PLUMBING GENERAL NOTES #1 INDICATE
 COMPLIANCE WITH MARTIN COUNTY
 AMMENDMENTS. THE PLANS SHALL BE IN
 COMPLIANCE WITH CITY OF W.P.B. CORRECT
 REFERENCE.
  
 CORRECT PLANS AND RESUBMIT FOR REVIEW.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]

Review Stop P PLUMBING
Rev No 1 Status F Date 2005-02-17 Cont ID  
Sent By jleech Date 2005-02-17 Time 17:52 Rev Time 1.00
Received By jleech Date 2005-02-17 Time 17:52 Sent To E
Notes
2005-02-17 00:00:00DENIED;
 1.LINE DRAWING ON P-1 DOESNOT MATCH
 RISER DIAGRAM ON P-2.
 2.BATH # 2 TUB IS NOT VENTED.
 3.UTIL. SINK REQUIRES A VENT AND WASHER
 AND UTIL. SINK ARE IN DIFFERENT PLACES
 ON RISER DIAGRAM.
 4.MASTER BATH. NO BIDET ON FLAT DRAWING
 OR FLOOR PLAN. SHOWER DRAIN NOT SHOWN ON
 FLAT DRAWING AND FLAT DRAWING IS NOT
 LAID OUT THE SAME AS RISER DIAGRAM.
 PLUMBING PLAN REVIEW;
 JOHN LEECH
 805-6695

Review Stop Z ZONING
Rev No 1 Status P Date 2005-02-16 Cont ID  
Sent By mmclean Date 2005-02-16 Time 14:34 Rev Time 0.00
Received By mmclean Date 2005-02-16 Time 14:34 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved