Plan Review Details - Permit 05020146
Plan Review Stops For Permit 05020146
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2005-03-03 Cont ID  
Sent By lsmith Date 2005-03-03 Time 12:40 Rev Time 0.75
Received By lsmith Date 2005-03-03 Time 12:40 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2005-02-22 Cont ID  
Sent By prafter Date 2005-02-22 Time 11:37 Rev Time 1.00
Received By lsmith Date 2005-02-22 Time 13:31 Sent To  
Notes
2005-02-22 00:00:00BUILDING PLAN REVIEW: FAILED
  
 SHEET ME1 SHOULD BE SIGNED & SEALED BY
 MECHANICAL ELECTRICAL ENGINEERING FIRM.
 ONE COPY IS SIGNED & SEALED BY
 ARCHITECT. SET #2 IS UNSIGNED BUT
 SEALED. CANNOT READ SEAL. ALL RAISED
 SEALS MUST BE SEALED SO IT CAN BE READ
 BY REVIEWER.
 SEE ELECTRICAL NOTES REGARDING SEALS &
 LICENSE NUMBERS REQUIRED PER STATE
 STATUTE.
  
 ANY QUESTIONS PLEASE CALL:
 LEA SMITH, BUILDING PLANS EXAMINER
 805-6713

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2005-02-24 Cont ID  
Sent By dpalmer Date 2005-02-24 Time 17:34 Rev Time 0.10
Received By dpalmer Date 2005-02-24 Time 17:34 Sent To M
Notes
2005-02-24 00:00:00ELEC SHEETS STAMPED.
  
 CONTRACTOR DID NOT REMOVE OLD SHEETS AND
 INSERT NEW SHEETS INTO SETS AS
 REQUESTED.
 THIS MAY BE REQUESTED BY BLDG REVIEW.
  
 SENT TO MECH FOR NEW SHEETS AND
 RE-STAMP.

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2005-02-17 Cont ID  
Sent By dpalmer Date 2005-02-17 Time 05:53 Rev Time 0.20
Received By dpalmer Date 2005-02-17 Time 05:53 Sent To M
Notes
2005-02-17 00:00:00*********** UNSAT ************
  
 1)NOTE: PLEASE SEE MISSING LICENSE
 INFORMATION FOR BOTH THE ARCH AND
 ENGINEERING FIRMS.
 PLEASE SEE FAC 61G1-16.004,61G15-23.002
 FS 481.219,471.023
  
 2)NOTE: PLEASE SEE PLANS WHICH ARE DONE
 BY ENGINEERING FIRM AND CONTAIN TITLE
 BLOCK FOR FIRM , SHALL BE SIGNED DATED
 AND SEALED BY SAID FIRM/ENGINEER.
 FS 471.025
  
 PLEASE SEE THE ABOVE COMMENTS ARE FOR
 ALL TRADES WHEATHER OR NOT COMMENT IS
 MADE BY OTHER REVIEWER(S).
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 CONSTUCTION SERVICES DEPT.
 561-805-6717
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-02-23 Cont ID  
Sent By adarroug Date 2005-02-23 Time 16:48 Rev Time 0.00
Received By adarroug Date 2005-02-23 Time 16:47 Sent To E
Notes
2005-02-23 00:00:00TO "E" BOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-02-02 Cont ID  
Sent By adarroug Date 2005-02-02 Time 16:47 Rev Time 0.00
Received By adarroug Date 2005-02-02 Time 16:47 Sent To E
Notes
2005-02-02 00:00:00TO "E" BOX

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2005-03-03 Cont ID  
Sent By prafter Date 2005-03-03 Time 08:03 Rev Time 0.45
Received By prafter Date 2005-03-03 Time 08:03 Sent To B
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2005-02-22 Cont ID  
Sent By prafter Date 2005-02-22 Time 11:31 Rev Time 0.45
Received By prafter Date 2005-02-22 Time 11:37 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2005-02-22 Cont ID  
Sent By prafter Date 2005-02-22 Time 11:34 Rev Time  
Received By lsmith Date   Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved