Plan Review Stops For Permit 05020026 |
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
P |
Date |
2005-02-16 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2005-02-16 |
Time |
17:44 |
Rev Time |
1.00 |
Received By |
kstevens |
Date |
2005-02-16 |
Time |
16:34 |
Sent To |
|
|
Notes |
2005-02-16 00:00:00 | | | | | PER N. MELICK MANUFACTURE INFO | | NOT REQUIRED FOR 1 & 2 FAMILY HOMES. | | JULY 17, 2002 OFFICAL INTERPRETATION. | | THE FIELD INSPECTOR SHALL VERIFY THE | | INSTALLED EQUIPMENT INPUT DOES NOT EX- | | CEED THE PIPE SIZING. | | | | | | | | IF W/HEATER ROOM IS A CONFINED SPACE, | | OPENINGS REQUIRED PER SECTION 304.3.1 0R | | SECTION 304.3.2 SHALL BE INSTALLED. | | MINIMUM 3,750 CUBIC FEET REQUIRED. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2005-02-03 |
|
|
Cont ID |
|
Sent By |
mjacobs |
Date |
2005-02-03 |
Time |
16:20 |
Rev Time |
0.00 |
Received By |
mjacobs |
Date |
2005-02-03 |
Time |
16:20 |
Sent To |
G |
|
Notes |
2005-02-03 00:00:00 | TO "GAS" BOX. |
|
|
|