Plan Review Stops For Permit 05010869 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2005-03-16 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2005-03-16 |
Time |
14:11 |
Rev Time |
1.00 |
Received By |
shill |
Date |
2005-03-16 |
Time |
13:59 |
Sent To |
PC |
|
Notes |
2005-03-16 00:00:00 | PROVISO - ARCHITECT TO SUBMIT DATED | | SHEETS A2 AND A4. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2005-01-28 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2005-01-28 |
Time |
09:05 |
Rev Time |
2.00 |
Received By |
shill |
Date |
2005-01-28 |
Time |
09:05 |
Sent To |
|
|
Notes |
2005-01-28 00:00:00 | ****CORRECTIONS**** | | | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | [email protected] | | | | 1.)DETAIL 10-A3, LOUNGE SINK IS TO | | COMPLY WITH FBC11-4.24.3 (KNEE | | CLEARANCE), SINK DEPTH A MAX OF 6 1/2" | | DEEP (11-4.24.4), MOUNTED WITH THE RIM | | NO HIGHER THAN 34" (11-4.24.2).A KNEE | | CLEARANCE IS SHOWN BUT THAT CLEARANCE | | IS | | BLOCKED BY THE CABINETRY.NOTE THAT | | DETAILS 8-A3 AND 10-A3 CONFLICT IN SINK | | HEIGHT. | | | | 2.)A1, BUILDING CODE CLASSIFICATION, | | LOAD DECLARES 39.PLEASE CLARIFY. | | | | 3.)SIGN THE OWNER/AGENT LINE OF THE | | ENERGY CALC, FBC 13-103.1.2. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2005-01-25 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2005-01-25 |
Time |
14:55 |
Rev Time |
0.50 |
Received By |
dpalmer |
Date |
2005-01-25 |
Time |
14:55 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
P |
Date |
2005-02-09 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2005-02-09 |
Time |
16:32 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2005-02-09 |
Time |
16:32 |
Sent To |
|
|
Notes |
2005-02-09 00:00:00 | 1. SEPARATE PLANS AND PERMITS | | FOR ANY FIRE SPRINKLER OR FIRE ALARM | | REMODEL. | | | | MIKE CARSILLO, ASSISTANT FIRE MARSHAL | | 835-2910 |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2005-02-23 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-02-23 |
Time |
14:54 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-02-23 |
Time |
14:54 |
Sent To |
|
|
Notes |
2005-02-23 00:00:00 | TO "COMM" BD#64 |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2005-01-19 |
|
|
Cont ID |
|
Sent By |
mjacobs |
Date |
2005-01-19 |
Time |
16:15 |
Rev Time |
0.00 |
Received By |
mjacobs |
Date |
2005-01-19 |
Time |
16:15 |
Sent To |
|
|
Notes |
2005-01-19 00:00:00 | TO "COMM BD#58" |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
3 |
Status |
P |
Date |
2005-06-01 |
|
|
Cont ID |
|
Sent By |
hmoser |
Date |
2005-06-01 |
Time |
13:45 |
Rev Time |
0.00 |
Received By |
hmoser |
Date |
2005-06-01 |
Time |
13:45 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
P |
Date |
2005-03-15 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2005-03-15 |
Time |
07:07 |
Rev Time |
0.40 |
Received By |
pkrauss |
Date |
2005-03-14 |
Time |
16:54 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2005-02-03 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2005-02-03 |
Time |
13:30 |
Rev Time |
0.55 |
Received By |
pkrauss |
Date |
2005-02-03 |
Time |
09:03 |
Sent To |
|
|
Notes |
2005-02-03 00:00:00 | DENIED: | | 1.PLAN SHEET M2.1, ERU-1 INDICATED IN | | THE RESTROOM AREAS.IS THIS AN EXHAUST | | UNIT?PLANS APPEAR TO HAVE THE DUCTWORK | | FROM ERU-1 TAPPING INTO THE RETURN | | DUCTWORK FROM AHU-4 & 8.PER 2001 | | FBC(M) TABLE 403.3, EXHAUST FROM | | BATHROOM AREAS SHALL NOT BE | | RECIRCULATED.EXHAUST DUCT SHALL | | TERMINATE TO THE OUTDOORS PER | | 2001FBC(M)501.3. | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | CONTACT PATTY KRAUSS AT (561)805-6719. |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2005-03-15 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2005-03-15 |
Time |
13:39 |
Rev Time |
1.25 |
Received By |
kstevens |
Date |
2005-03-15 |
Time |
13:39 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2005-02-08 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2005-02-08 |
Time |
09:51 |
Rev Time |
1.92 |
Received By |
kstevens |
Date |
2005-02-08 |
Time |
09:51 |
Sent To |
|
|
Notes |
2005-02-08 00:00:00 | DENIED | | REFERENCE: FBC-2001 PLUMBING | | FBC-2001 CHAPTER 1 | | FBC-2001 CHAPTER 11 | | | | 1) SHT A-1 SHOW TURNING AREA IN EACH | | TOILET ROOMS DETAIL #2. SECTION | | 11-4.22.3. | | 2) SHT A-1 SHOW CLEAR FLOOR SPACE FOR | | THE LOUNGE SINK. SECTION 11-4.24.5. | | (FORWARD APPROACH REQUIRED, MAXIMUM 19" | | UNDERNEATH THE SINK). | | 3) SHT A-3 DETAIL #7 FLUSH CONTROLS TO | | BE MOUNTED ON THE WIDE SIDE OF THE | | TOILET AREA. SECTION 11-4.16.5. - DETAIL | | #10 MAXIMUM SINK DEPTH TO BE 6-1/2". | | SECTION 11-4.24.4. (MAX. 7" SHOWN). | | 4) SUBMIT A DETAIL FOR THE DRINKING | | SHOWING COMPLIANCE WITH 11-4.15 AND ALL | | SUBSECTIONS. | | 5) SHT P0.1 PLUMBING FIXTURE SCHEDULE. | | SUBMIT MANUF. SPECIFICATION SHEETS FOR | | THE POWERSTREAM RP-1 TANKLESS WATER | | HEATER. SHEETS SHALL SHOW LISTING, AND | | INSTALLATION INSTRUCTIONS. SECTION | | 303.4 | | 6) SHT P5.1 WATER RISER DIAGRAM, WATER | | HAMMER ARRESTORS SHALL BE LOCATED IN AN | | "EFFECTIVE RANGE" NEXT TO THE FIXTURES, | | NOT IN THE CEILING AS SHOWN. PDI-WH 201 | | AND MANUF INSTALL. INSTRUCTIONS. | | | | | | REVIEW BY KEN STEVENS | | (561) 805-6721 | | FAX (561) 653-2692 | | E-MAIL [email protected] |
|
|