Plan Review Details - Permit 04121181
Plan Review Stops For Permit 04121181
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2005-03-08 Cont ID  
Sent By rmcdouga Date 2005-03-07 Time 10:00 Rev Time 0.00
Received By rmcdouga Date 2005-03-07 Time 10:00 Sent To  
Notes
2005-03-07 00:00:00SEE PROVISO FROM LAST REVIEW.
 WILL CHANGE STATUS TO PASS WHEN PRODUCT
 APPROVALS ARE RETURNED. RM

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2005-02-22 Cont ID  
Sent By rmcdouga Date 2005-02-22 Time 11:21 Rev Time 0.00
Received By rmcdouga Date 2005-02-22 Time 11:21 Sent To  
Notes
2005-02-22 00:00:00PROVISO
  
 1) SUBMIT MANUFACTURER'S SPECIFICATIONS
 FOR THE VENTLESS FOAM INSULATION SYSTEM.
  
 2) SUBMIT A LETTER FROM THE FIREPLACE
 AND CHIMNEY MANUFACTURER APPROVING THE
 CHINEY CAP ENCLOSURE SHOWN ON THE PLANS.
  
 3) SUBMIT TWO COPIES OF AN INSTALLATION
 SCHEDULE AND KEY PLAN FOR THE STORM
 PANELS BEFORE THEY ARE INSTALLED.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2005-01-12 Cont ID  
Sent By rmcdouga Date 2005-01-12 Time 08:54 Rev Time 0.00
Received By rmcdouga Date 2005-01-12 Time 08:54 Sent To  
Notes
2005-01-12 00:00:00DENIED
  
 1)IMPACT FEES MUST BE PAID TO PALM
 BEACH COUNTY, PLANS STAMPED BY THEM AND
 COPY OF RECEIPT SUBMITTED TO CITY OF
 WEST PALM BEACH BUILDING DEPARTMENT,
 BEFORE A BUILDING PERMIT CAN BE ISSUED.
  
 2)A RECORDED COPY OF THE NOTICE OF
 COMMENCEMENT MUST BE SUBMITTED BEFORE A
 PERMIT CAN BE ISSUED.
  
 3) SUBMIT A SURVEY INDICATING THE
 LOCATION OF THE STRUCTURE ON THE LOT.
  
 4) THE LOCATIONS OF SEVERAL OF THE
 FILLED CELLS ARE MISSING FROM THE
 FOUNDATION PLAN ON A1.
  
 5) SPECIFY THE EMBED DEPTH OF THE 1/2"
 DIA. BOLTS ON THE O.H. GARAGE DOOR BUCK
 DETAIL ON A 2.
  
 6) SPECIFY THE LOCATIONS OF THE DRAFT
 STOPS DIVIDING THE FLOOR/CEILING
 ASSEMBLY INTO AREAS OF 500 SQFT AS
 REQUIRED BY FBC 2305.2.2.
  
 7) SUBMIT MANUFACTURERS SPECIFICATIONS
 AND INSTALLATION INSTRUCTIONS FOR THE
 FOAM INSULATION THAT WILL BE USED IN
 CONJUNCTION WITH THE UNVENTED ATTIC.
 ALSO SEE ATTACHMENT.
  
 8) THE MEAN ROOF HEIGHT OF LESS THAN 20'
 LISTED ON SHEETS A4 AND A6 IS INCORRECT.
 THE MRH (DISTANCE FROM GRADE TO AVERAGE
 HEIGHT OF THE ROOF) IS JUST OVER 26'.
 PLEASE CORRECT.
  
 9) REVISE ROOF SHEATHING NAILING NOTES
 ON A4. THE OUTSIDE CORNERS OF HIP ROOFS
 ARE ZONE 3. SHEATING IN ZONE 3 IS
 REQUIRED TO BE NAILED AT 4'OC AT EDGES
 AND 6'OC INTERMEDIATE WITH 8D RING-SHANK
 NAILS PER CITY OF WPB AMENDMENTS TO FBC
 TABLE 2306.1.
  
 10) REVISE THE ROOF SHEATHING FASTENING
 NOTES AT THE ONE AND TWO STORY WALL
 SECTIONS ON A5.
  
 11) PLEASE CORRECT THE NUMBER OF
 FASTENERS SPECIFIED FOR TRUSS CONNECTOR
 #4 IN THE SCHEDULE ON A4. THE SIMPSON
 CATALOG SPECIFIES (15) 10D X 1-1/2"
 NAILS FOR THE HETAL 20.
  
 12) PROVIDE A FASTENING DETAIL FOR THE
 LEDGER CARRYING THE ROOF TRUSSES AT THE
 CHIMNEY.
  
 13) SUBMIT A LETTER FROM THE
 MANUFACTURER OF THE FIREPLACE AND
 CHIMNEY SPECIFYING THAT THE CHIMNET
 TERMINATION CAP CAN BE ENCLOSED AS SHOWN
 ON THE PLANS. ADDRESS THE FIRE HAZARD
 AND THE ABILITY OF THE UNIT TO DRAFT
 PROPERLY.
  
 14) SUBMIT A KEY PLAN AND INSTALLATION
 SCHEDULE FOR THE STORM PANELS. SPECIFY
 WHICH OPENINGS WILL BE SHUTTERED.
 SPECIFY THE MOUNT TYPE, FASTENER TYPE
 AND SPACING.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2005-03-04 Cont ID  
Sent By dpalmer Date 2005-03-04 Time 06:41 Rev Time 0.25
Received By dpalmer Date 2005-03-04 Time 06:41 Sent To B
Notes
2005-03-04 00:00:00ELEC STAMPED.

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2005-02-07 Cont ID  
Sent By dpalmer Date 2005-02-07 Time 08:45 Rev Time 0.50
Received By dpalmer Date 2005-02-07 Time 08:45 Sent To P
Notes
2005-02-07 00:00:00********* UNSAT 2ND REVIEW **********
  
 PLEASE SEE SOME COMMENTS FROM PREVIOUS
 REVIEW STILL NEED TO BE ADDRESSED.
  
  
 1)NOTE: PLEASE SEE PLANS WHICH ARE
 SIGNED, DATED AND SEALED BY THE ENGINEER
 MUST CONTAIN A TITLE BLOCK FOR THE
 ENGINEER OF RECORD CONTAINING ALL
 INFORMATION AS REQUIRED UNDER FAC
 61G15-23.002.
  
  
 2)NOTE: PLEASE CORRELATE LOAD
 CALCULATIONS, SUB-PANEL IS SHOWN W/ 25KW
 LOAD AND MAIN PANEL INDICATES 10KW?
 PLEASE SEE 220.31 FOR LOAD
 CALCULATIONS.
 PLEASE SEE 220.3B4, THIS IS A TOTAL # OF
 FIXTURES X THE WATTAGE PER FIXTURE ADDED
 TO LIGHTING LOAD CALCS.
  
  
 NEW COMMENTS DUE TO CHANGE IN RISER
 DIAGRAM AND ADDED PANEL SCHEDULE.
  
 1)NOTE: PLEASE SEE REQUIRED FOOTER STEEL
 HAS NOW BEEN REMOVED FROM RISER
 DIAGRAM?
 PLEASE SEE 250.50.
  
 2)NOTE: PLEASE SEE SMALL APPL CIRCUIT IS
 SHOWN W/ 3KW LOAD ON A 20A CIRCUIT.
 PLEASE SEE MAX KW FOR A 20A CIRCUIT IS
 1950W'S. PLEASE ADJUST.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE CALL.
  
 PLEASE REMOVE ANY OLD/VOIDED SHEETS AND
 ONLY INSERT NEW REVISED SHEETS INTO
 COMPLETE SETS FOR REVIEW AND STAMPING.
  
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2004-12-30 Cont ID  
Sent By dpalmer Date 2004-12-30 Time 16:13 Rev Time 0.50
Received By dpalmer Date 2004-12-30 Time 16:13 Sent To M
Notes
2004-12-30 00:00:00*************** UNSAT *************
  
 1)NOTE: PLEASE SEE PLANS WHICH ARE
 SIGNED AND SEALED BY THE ENGINEER ARE
 REQUIRED TO HAVE A TITLE BLOCK WITH ALL
 INFORMATION AS SET-FORTH IN FAC
 61G15-23.002. PLEASE SEE ELECTRICAL
 PLANS DO NOT CONTAIN ANY TITLE BLOCK FOR
 ENG.
 PLEASE SEE ALL PLANS ARE REQUIRED TO
 HAVE THE PRINTED NAME AND SIAGNATURE OF
 PERSON RESPONSIBLE FOR PLANS/DESIGN. PER
 FBC 104.2.1 THIS IS REQUIRED ON ALL
 PLANS AND FOR ALL TRADES WHEATHER OR NOT
 COMMENT IS MADE BY OTHER REVIEWER(S).
  
 2)NOTE: SMOKE DETECTORS ARE REQUIRED
 INSIDE AND OUTSIDE ALL SLEEPING ROOMS.
 ON EACH LEVEL OF A MULTI-LEVEL DWELLING
 UNIT.
 IN CLOSE PROXIMITY OF STAIRWAYS LEADING
 TO FLOORS ABOVE AND IN THE VICINITY OF
 BEDROOMS.
 PLEASE ALSO NOTE, SD'S ARE REQ'D TO BE
 A MIN OF 3' FROM BATHROOM DOORS AND
 KITCHENS.
 ABOVE PER:FBC 905.2, NFPA-72 8-1.4
 PLEASE SEE MOST HAVE BEEN REDLINED ON
 PLANS FOR LOCATIONS REQUIRED.
  
 3)NOTE: PLEASE CORRELATE PLANS WITH
 PANEL SCHEDULE AND LOAD CALCULATIONS FOR
 WATER HEATER, OVEN/RANGE AND DRYER.
 PLANS SHOW AS GAS AND ELECTRICAL WITH
 LOADS ACCORD.
 PLEASE SEE WATER HOWEVER SHOWS A LOAD OF
 4500W ON A 20A CIRCUIT.
 PLEASE SEE 422.13, REQUIRES MIN RATING
 OF 125%.
  
 4)NOTE: PLEASE VERIFY OCP FOR AHU #2,
 THIS SHOWS 60A OCP FOR 7.5KW UNIT.
 424.3B REQUIRES A MIN 125% . MAX MAY BE
 150% FOR OCP.
  
 5 )NOTE: PLEASE SEE 220.3B4.
 PLEASE SHOW ALL RECESSED LTS BASED ON
 MAX WATTAGE FOR FIXTURE(S). THIS MAY NOT
 BE FIGURED IN W/ 3W/PER SQ FT.
 PLEASE PROVIDE FIXTURE INFORMATION ON
 LEGEND.
  
 6 )NOTE: PLEASE LIST THE REQ'D ARC
 FAULT PROTECTED CURCUIT(S) ON PANEL
 SCHEDULE. PLEASE SEE THAT ALL "OUTLETS"
 IN BEDROOMS ARE TO BE PROTECTED ,
 INCLUDING, LTS, RECEPTS, SD'S ETC.
  
 7)NOTE: PLEASE PROVIDE ROOM DESIGNATIONS
 ON PLANS.
  
 8)NOTE: PLEASE INDICATE PANEL AS MCB.
 225.31,240.4B,ETC.
  
 PLEASE REMOVE ANY OLD/VOIDED SHEETS AND
 ONLY INSERT NEW REVISED SHEETS INTO
 COMPLETE SETS FOR REVIEW AND STAMPING.
 ONE SET OF OLD SHEETS SHOULD BE
 SUBMITTED FOR REFERENCE ONLY.
  
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 CONSTUCTION SERVICES DEPT.
 561-805-6717
 [email protected]

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2005-02-12 Cont ID  
Sent By pschmitz Date 2005-02-12 Time 06:03 Rev Time 0.00
Received By pschmitz Date 2005-02-12 Time 06:02 Sent To P
Notes
2005-02-12 00:00:00SEPERATE PLANS AND PERMIT FOR GAS PIPING

Review Stop I INCOMING/PROCESSING
Rev No 7 Status N Date 2006-03-15 Cont ID  
Sent By adarroug Date 2006-03-15 Time 15:03 Rev Time 0.00
Received By adarroug Date 2006-03-15 Time 15:03 Sent To P
Notes
2006-03-15 00:00:00TO "P" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2006-01-20 Cont ID  
Sent By adarroug Date 2006-01-20 Time 12:25 Rev Time 0.00
Received By adarroug Date 2006-01-20 Time 12:25 Sent To P
Notes
2006-01-20 00:00:00TO "P" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2005-03-03 Cont ID  
Sent By adarroug Date 2005-03-03 Time 11:38 Rev Time 0.00
Received By adarroug Date 2005-03-03 Time 11:38 Sent To I
Notes
2005-03-03 00:00:00TO DPALMER DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2005-02-04 Cont ID  
Sent By adarroug Date 2005-02-04 Time 15:47 Rev Time 0.00
Received By adarroug Date 2005-02-04 Time 11:37 Sent To E
Notes
2005-02-04 00:00:00TO "DP" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2005-02-01 Cont ID  
Sent By mjacobs Date 2005-02-01 Time 11:18 Rev Time 0.00
Received By mjacobs Date 2005-02-01 Time 11:16 Sent To Z
Notes
2005-02-01 00:00:00TO "Z" BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2004-12-30 Cont ID  
Sent By mjacobs Date 2004-12-30 Time 07:58 Rev Time 0.00
Received By mjacobs Date 2004-12-30 Time 07:58 Sent To E
Notes
2004-12-30 00:00:00TO "SFD RACK" E.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2004-12-22 Cont ID  
Sent By mjacobs Date 2004-12-22 Time 13:11 Rev Time 0.00
Received By mjacobs Date 2004-12-22 Time 13:11 Sent To Z
Notes
2004-12-22 00:00:00SENT TO "Z" BOX.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2005-01-03 Cont ID  
Sent By prafter Date 2005-01-03 Time 12:20 Rev Time 0.45
Received By prafter Date 2005-01-03 Time 12:20 Sent To B
Notes
2005-01-03 00:00:00 
 PROVISO.TALK TO MIKE WILLIAMS1/03/05
 11:30 AM
  
 1. DUCT SIZE TO BEDROOM 2. REQUIRE 10 "
 SUPPLY AIR DUCT .
 2. RETURN AIR FROM BEDROOM 2. REQUIRE
 14" JUMPER WITH 16"X16" RT GRILLS .
  
 PAT RAFTER561/805/6719 .
  

Review Stop P PLUMBING
Rev No 3 Status P Date 2006-03-20 Cont ID  
Sent By jleech Date 2006-03-20 Time 15:17 Rev Time 0.00
Received By jleech Date 2006-03-20 Time 15:17 Sent To  
Notes
2006-03-20 00:00:00ADDED VEG. SINK.

Review Stop P PLUMBING
Rev No 2 Status P Date 2005-02-12 Cont ID  
Sent By pschmitz Date 2005-02-12 Time 06:07 Rev Time 0.00
Received By pschmitz Date 2005-02-12 Time 06:07 Sent To B1
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2005-01-03 Cont ID  
Sent By jleech Date 2005-01-03 Time 09:16 Rev Time 1.00
Received By jleech Date 2005-01-03 Time 09:16 Sent To M
Notes
2005-01-03 00:00:00DENIED;
 1.KITCHEN SINK MUST DISCHARGE DOWN
 STREAM OF HALF BATH. FBC PLUMBING SEC.
 909.1.
 2.TUB AND SHOWER IN MASTER BATHROOM ARE
 NOT VENTED.
 3.PLEASE CHANGE NOTES. SHOWER HEADS TO
 COMPLY WITH FBC PLUMBING TABLE 604.4.ALL
 TUB AND SHOWER VALVES TO BE ANTI-SCALD
 TYPE. NOTE 2 ONE VENT MUST EXTEND THRU
 ROOF TO THE OUT SIDE.
 PLUMBING PLAN REVIEW BY;
 JOHN LEECH
 805-6695

Review Stop Z ZONING
Rev No 2 Status P Date 2005-02-04 Cont ID  
Sent By mmclean Date 2005-02-04 Time 15:28 Rev Time 0.00
Received By mmclean Date 2005-02-04 Time 15:28 Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2004-12-29 Cont ID  
Sent By mmclean Date 2004-12-29 Time 16:25 Rev Time 0.00
Received By mmclean Date 2004-12-29 Time 16:25 Sent To I
Notes
2004-12-29 00:00:00DENIED, NEED A SCALED SITEPLAN SHOWING
 THE SETBACKS FOR THE CHIMENEY AND OTHER
 OR SHOW ON THE SURVEY.CALLED CONTR
 LEFT MSG ON VOICE MAIL.


Account Summary | Usage Policy | Privacy Policy