Plan Review Stops For Permit 04121138 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2005-02-24 |
|
|
Cont ID |
|
Sent By |
lsmith |
Date |
2005-02-24 |
Time |
10:04 |
Rev Time |
0.50 |
Received By |
lsmith |
Date |
2005-02-24 |
Time |
10:04 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2005-01-18 |
|
|
Cont ID |
|
Sent By |
lsmith |
Date |
2005-01-18 |
Time |
14:26 |
Rev Time |
0.75 |
Received By |
lsmith |
Date |
2005-01-18 |
Time |
14:26 |
Sent To |
|
|
Notes |
2005-01-18 00:00:00 | BUILDING PLAN REVIEW: FAILED | | | | PER MARSHALL & SWIFT COST GUIDE LINES | | THE VALUE OF THE POOL IS $24704. | | ADDITIONAL FEES ARE DUE. | | | | A NOTICE OF COMMENCEMENT MUST BE FILED | | AT THE COUNTY CLERKS OFFICE AND A | | RECORDED COPY SUBMITTED BEFORE A PERMIT | | CAN BE ISSUED. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
P |
Date |
2005-02-24 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2005-02-24 |
Time |
09:39 |
Rev Time |
0.25 |
Received By |
dpalmer |
Date |
2005-02-24 |
Time |
09:39 |
Sent To |
B |
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
F |
Date |
2005-02-14 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2005-02-14 |
Time |
10:12 |
Rev Time |
0.25 |
Received By |
dpalmer |
Date |
2005-02-14 |
Time |
10:11 |
Sent To |
B |
|
Notes |
2005-02-14 00:00:00 | ********* UNSAT 2ND REVIEW ******** | | | | 1)NOTE: PLEASE SEE NOTES FROM PREVIOUS | | REVIEW. | | PLEASE SEE PANEL IS NOW LABELED AS | | "EXISTING" , HOWEVER PLEASE SEE NOTES | | #'S 3 AND 4 FROM PREVIOUS NOTES. | | | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | REVIEW. IF THERE ARE ANY QUESTIONS, | | PLEASE DO NOT HESITATE TO CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-805-6717 | | [email protected] |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2004-12-28 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2004-12-28 |
Time |
16:50 |
Rev Time |
0.25 |
Received By |
dpalmer |
Date |
2004-12-28 |
Time |
16:50 |
Sent To |
P |
|
Notes |
2004-12-28 00:00:00 | ************ UNSAT *********** | | | | 1)NOTE: PLEASE SEE WIRING DIAGRAM | | INDICATES A NEW PANEL. | | PLEASE INCLUDE FEED TO NEW PANEL, OCP, | | AWG, CONDUIT ETC. | | PLEASE ALSO INCLUDE PANEL SCHEDULE FOR | | NEW PANEL WITH CIRCUITS FOR NEW | | EQUIPMENT.215.5 | | | | 2)NOTE: PLEASE BE SURE RAISED SEAL IS | | CLEAR AND VISABLE WITH ALL INFORMATION | | ON SEAL. FS 471.025 | | | | 3)NOTE: PLEASE INCLUDE MANUFACTURE SPECS | | FOR HEAT PUMP SHOWING LISTING FROM A | | NRTL> | | | | 4)NOTE: PLEASE INCLUDE LOAD CALCULATIONS | | FOR EXSITING SERVICE WITH NEW ADDED | | LOADS. | | PLEASE SEE ALL CONTINUOUS LOADS ARE TO | | BE SHOWN AT 125% (PUMP, HEAT PUMP). | | 220 | | IF LOAD CALCS ARE DONE BY THE ELECTRICAL | | CONTRACTOR, PLEASE BE SURE THE PRINTED | | NAME AND SIGNATURE IS ON SEPARATE | | SHEETS. | | FBC 104.2.1 | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | REVIEW. IF THERE ARE ANY QUESTIONS, | | PLEASE DO NOT HESITATE TO CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | CITY OF WEST PALM BEACH | | CONSTUCTION SERVICES DEPT. | | 561-805-6717 | | [email protected] |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2005-02-23 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-02-23 |
Time |
13:04 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-02-23 |
Time |
13:04 |
Sent To |
E |
|
Notes |
2005-02-23 00:00:00 | TO DPALMER DESK/RESUB |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
|
Date |
2005-02-17 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-02-07 |
Time |
12:02 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-02-07 |
Time |
14:16 |
Sent To |
E |
|
Notes |
2005-02-07 00:00:00 | TO DPALMER DESK/RESUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2004-12-28 |
|
|
Cont ID |
|
Sent By |
mjacobs |
Date |
2004-12-28 |
Time |
07:40 |
Rev Time |
0.00 |
Received By |
mjacobs |
Date |
2004-12-28 |
Time |
07:40 |
Sent To |
E |
|
Notes |
2004-12-28 00:00:00 | TO "E" BOX. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2004-12-22 |
|
|
Cont ID |
|
Sent By |
mjacobs |
Date |
2004-12-22 |
Time |
09:19 |
Rev Time |
0.00 |
Received By |
mjacobs |
Date |
2004-12-22 |
Time |
09:19 |
Sent To |
Z |
|
Notes |
2004-12-22 00:00:00 | SENT TO "Z" BOX. |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2005-01-14 |
|
|
Cont ID |
|
Sent By |
pschmitz |
Date |
2005-01-14 |
Time |
14:26 |
Rev Time |
0.00 |
Received By |
pschmitz |
Date |
2005-01-14 |
Time |
14:26 |
Sent To |
B |
|
Notes |
2005-01-14 00:00:00 | PROVISO: | | BACF FLOW PREVENTER INSTALLED BEFORE | | STARTING WORK. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2004-12-27 |
|
|
Cont ID |
|
Sent By |
mmclean |
Date |
2004-12-27 |
Time |
15:28 |
Rev Time |
0.00 |
Received By |
mmclean |
Date |
2004-12-27 |
Time |
15:28 |
Sent To |
I |
|
Notes |
|
|