Plan Review Details - Permit 04110846
Plan Review Stops For Permit 04110846
Review Stop G GAS REVIEW
Rev No 3 Status P Date 2005-03-05 Cont ID  
Sent By kstevens Date 2005-03-05 Time 09:16 Rev Time 0.50
Received By kstevens Date 2005-03-05 Time 09:16 Sent To  
Notes
2005-03-05 00:00:00SEPARATE PERMITS ARE REQUIRED. -
 ELECTRICAL PERMIT FOR THE GENERATOR &
 AND A PLUMBING PERMIT TO HOOK UP THE
 POOL HEATER PIPING IF HOOKED UP IN THE
 FUTURE.
  
  
 PER N. MELICK MANUFACTURE INFO
 NOT REQUIRED FOR 1 & 2 FAMILY HOMES.
 JULY 17, 2002 OFFICAL INTERPRETATION.
 THE FIELD INSPECTOR SHALL VERIFY THE
 INSTALLED EQUIPMENT INPUT DOES NOT EX-
 CEED THE PIPE SIZING.

Review Stop G GAS REVIEW
Rev No 2 Status P Date 2004-12-23 Cont ID  
Sent By kstevens Date 2004-12-23 Time 07:28 Rev Time 0.75
Received By kstevens Date 2004-12-23 Time 07:28 Sent To  
Notes
2004-12-23 00:00:00SEPARATE PERMITS ARE REQUIRED. -
 ELECTRICAL PERMIT FOR THE GENERATOR &
 AND A PLUMBING PERMIT TO HOOK UP THE
 POOL HEATER PIPING.
  
  
 PER N. MELICK MANUFACTURE INFO
 NOT REQUIRED FOR 1 & 2 FAMILY HOMES.
 JULY 17, 2002 OFFICAL INTERPRETATION.
 THE FIELD INSPECTOR SHALL VERIFY THE
 INSTALLED EQUIPMENT INPUT DOES NOT EX-
 CEED THE PIPE SIZING.

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2004-12-01 Cont ID  
Sent By kstevens Date 2004-12-01 Time 10:47 Rev Time 1.50
Received By kstevens Date 2004-12-01 Time 10:47 Sent To  
Notes
2004-12-01 00:00:00DENIED
 REFERENCE: FBC-2001 FUEL GAS
 FBC-2001 CHAPTER 1
  
 1) A SEPARATE ELECTRICAL PERMIT IS
 REQUIRED FOR THE GENERATOR. MANUF.
 SPECIFICATIONS ARE REQUIRED AS WELL AS
 SETBACKS FOR THE GAS GENERATOR AND POOL
 HEATER ON THE SURVEY FOR ZONING
 APPROVAL
 2) A SEPARATE PLUMBING PERMIT IS
 REQUIRED FOR THE HOOK-UP OF THE POOL
 HEATER TO THE POOL EQUIPMENT PIPING.
 3) THE GENERATOR, POOL HEATER AND BBQ
 GRILL COSTS DO NOT SEEM TO APPEAR ON THE
 VALUE OF THE JOB AS REQUIRED BY SECTION
 104.6.5. THE VALUE OF THE JOB SHALL
 INCLUDE ALL GAS APPLIANCES AS WELL AS
 THE VALUE OF THE GAS LINES WITH
 REGULATORS, VALVES, LP TANK ECT.
 4) THE FOLLOWING INFORMATION IS REQUIRED
 FOR THE GAS PERMIT.
 A. BTU LOAD OF EACH APPLIANCE AND THE
 TOTAL BTU LOAD ON THE SYSTEM. REFER TO
 THE FBC-2001 FUEL GAS CODE SECS. 401.8
 THRU 402.5.2 AND TABLES 402(1) THRU
 402(34).
  
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2005-02-22 Cont ID  
Sent By adarroug Date 2005-02-22 Time 14:25 Rev Time 0.00
Received By adarroug Date 2005-02-22 Time 14:25 Sent To G
Notes
2005-02-22 00:00:00TO "G" BOX/REVISION

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2004-12-15 Cont ID  
Sent By mjacobs Date 2004-12-15 Time 10:02 Rev Time 0.00
Received By mjacobs Date 2004-12-15 Time 10:02 Sent To G
Notes
2004-12-15 00:00:00SENT TO "GAS" BOX.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2004-12-07 Cont ID  
Sent By mjacobs Date 2004-12-07 Time 15:47 Rev Time 0.00
Received By mjacobs Date 2004-12-07 Time 15:47 Sent To G
Notes
2004-12-07 00:00:00SENT TO "GAS" BOX.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2004-11-16 Cont ID  
Sent By mjacobs Date 2004-11-16 Time 15:56 Rev Time 0.00
Received By mjacobs Date 2004-11-16 Time 15:56 Sent To G
Notes
2004-11-16 00:00:00SENT TO "GAS" BOX

Review Stop Z ZONING
Rev No 1 Status P Date 2005-02-22 Cont ID  
Sent By mmclean Date 2005-02-22 Time 14:03 Rev Time 0.00
Received By mmclean Date 2005-02-22 Time 14:03 Sent To  
Notes
2005-02-22 00:00:00PASS REVISION FOR SETBACK ON