Plan Review Stops For Permit 04110185 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
20 |
Status |
P |
Date |
2007-03-16 |
|
|
Cont ID |
|
Sent By |
jwitmer |
Date |
2007-03-16 |
Time |
15:19 |
Rev Time |
0.55 |
Received By |
jwitmer |
Date |
2007-03-16 |
Time |
15:19 |
Sent To |
|
|
Notes |
2007-03-16 15:19:49 | CALCS AND WALL FRAMING DETAILS |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
19 |
Status |
P |
Date |
2007-03-16 |
|
|
Cont ID |
|
Sent By |
jwitmer |
Date |
2007-03-16 |
Time |
14:42 |
Rev Time |
0.55 |
Received By |
jwitmer |
Date |
2007-03-16 |
Time |
14:42 |
Sent To |
PC |
|
Notes |
2007-03-16 14:43:04 | REVISION# 10 16'-0" OVERHEAD GARAGE DOOR |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
18 |
Status |
P |
Date |
2006-09-15 |
|
|
Cont ID |
|
Sent By |
jwitmer |
Date |
2006-09-15 |
Time |
10:10 |
Rev Time |
0.55 |
Received By |
jwitmer |
Date |
2006-09-15 |
Time |
10:10 |
Sent To |
PC |
|
Notes |
2006-09-15 00:00:00 | TRASH CHUTES- OK |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
17 |
Status |
F |
Date |
2006-05-03 |
|
|
Cont ID |
|
Sent By |
jwitmer |
Date |
2006-05-03 |
Time |
08:08 |
Rev Time |
1.11 |
Received By |
jwitmer |
Date |
2006-05-03 |
Time |
08:08 |
Sent To |
PC |
|
Notes |
2006-05-03 00:00:00 | BUILDING PLAN REVIEW | | PERMIT: 04110185 | | ADD: 3900 N FLAGLER BLDG# 1, 6 | | CONT: THE WEITZ CO | | TEL: (561)719-6724 | | FL BLD CODE= 2001 FLORIDA BUILDING CODE | | * WEST PALM BEACH AMENDMENTS | | | | SUBMITTAL:EXTERIOR WALL FRAMING | | ACTION: DENIED | | | | 1) PAGES INSERTED INTO SHOP DRAWINGS | | THAT ARE COPIES WITH SHADED SEAL COPIED. | | | | 2) EXTERIOR WALL FRAMING DETAILS, | | NO INDEX SHEET LISTING COVERED PAGES. | | FLORIDA ADMINISTRATIVE CODE 6G15-23.002 | | (2) A COVER OR INDEX SHEET FOR | | ENGINEERING SPECIFICATIONS MAY BE USED | | AND THAT SHEET MUST BE SIGNED, SEALED | | AND DATED BY THOSE PROFESSIONAL | | ENGINEERS IN RESPONSIBLE CHARGE OF THE | | PRODUCTION AND PREPARATION OF EACH | | SECTION OF THE ENGINEERING SPECIFICATION | | OR OTHER ENGINEERING DOCUMENT WITH | | SUFFICIENT INFORMATION ON THE COVER | | SHEET OR INDEX SO THAT THE USER WILL BE | | AWARE OF EACH PORTION OF THE | | SPECIFICATIONS FOR WHICH EACH | | PROFESSIONAL ENGINEER IS RESPONSIBLE. | | BUILDING PLAN REVIEW | | JIM WITMER | | TEL: (561)805-6715 | | FAX: (561)659-8026 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
16 |
Status |
F |
Date |
2006-04-06 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2006-04-06 |
Time |
12:03 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2006-04-06 |
Time |
12:03 |
Sent To |
|
|
Notes |
2006-04-06 00:00:00 | ****CORRECTIONS**** | | | | ROOFING SUBMITTAL | | | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | 561-805-6724 [email protected] | | | | FBC FLORIDA BUILDING CODE 2001 | | FBC* CITY OF WEST PALM BEACH AMENDMENTS | | TO THE FBC2001 | | | | 1.)ALL SUBMITTALS ARE TO BE REVIEWED | | BY DOR.NOTE THAT THIS SUBMITTAL IS NOT | | NECESSARY AS THE NOAS HAVE ALREADY BEEN | | REVIEWED AND STAMPED DURING THE PLAN | | REVIEW PROCESS. | | | | IF YOU ARE CHANGING PRODUCTS, SUBMIT NEW | | PRODUCT APPROVALS AS A REVISION. | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
15 |
Status |
P |
Date |
2006-01-10 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2006-01-10 |
Time |
12:37 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2006-01-10 |
Time |
12:37 |
Sent To |
|
|
Notes |
2006-01-10 00:00:00 | ELEVATION CERTIFICATE |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
14 |
Status |
F |
Date |
2005-12-16 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2005-12-16 |
Time |
18:02 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2005-12-16 |
Time |
18:02 |
Sent To |
|
|
Notes |
2005-12-16 00:00:00 | ****CORRECTIONS**** | | | | SUBMITTALS; BLDG 3 & 6 ROOF TRUSS | | ENGINEERING | | | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | 561-805-6724 [email protected] | | | | FBC FLORIDA BUILDING CODE 2001 | | FBC* CITY OF WEST PALM BEACH AMENDMENTS | | TO THE FBC2001 | | | | 1.)DOCUMENTS PREPARED BY AN ENGINEER | | AND SUBMITTED FOR PUBLIC RECORD ARE TO | | BE SIGNED, SEALED AND DATED ORIGINALS, | | FAC61G15-23.002 (TRUSS PLACEMENT PLAN). |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
13 |
Status |
F |
Date |
2005-12-16 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2005-12-16 |
Time |
17:53 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2005-12-16 |
Time |
17:53 |
Sent To |
|
|
Notes |
2005-12-16 00:00:00 | ****CORRECTIONS**** | | | | SUBMITTALS; TENDON AND SUPPORT SHOPS AND | | CALCS | | | | BLDG 6 ROOF | | | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | 561-805-6724 [email protected] | | | | FBC FLORIDA BUILDING CODE 2001 | | FBC* CITY OF WEST PALM BEACH AMENDMENTS | | TO THE FBC2001 | | | | 1.)A TITLE BLOCK IS REQUIRED, | | FAC61G15-23.003.MR. HAMID'S ADDRESS ON | | DBPE WEBSITE IS NOT THE ADDRESS ON THE | | PLAN, WHICH APPEARS TO BE FOR PTE.IF | | PTE IS PRACTICING ENGINEERING AND MR. | | HAMID IS THE INDIVIDUAL WHO IS SEALING | | THE DOCUMENT THROUGH THE COMPANY, THE | | INFORMATION FOR PTE SERVES AS THE TITLE | | BLOCK AND IS REQUIRED TO HAVE THE | | CERTIFICATE OF AUTHORIZATION FOR THE | | FIRM PRINTED ON THE PLAN.IF MR. HAMID | | IS SEALING THE PLAN INDIVIDUALLY, HIS | | TITLE BLOCK WITH ALL INFORMATION | | REQUIRED BY FAC61G15-23.002 IS REQUIRED. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
12 |
Status |
P |
Date |
2005-12-16 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2005-12-16 |
Time |
17:45 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2005-12-16 |
Time |
17:45 |
Sent To |
|
|
Notes |
2005-12-16 00:00:00 | SUBMITTALS | | | | ELEVATION CERTIFICATE, BLDG 3 | | | | BLDG 3, 4TH FLOOR SHORING/ 2ND & 3RD FL | | RESHORE | | BLDG 3, ROOF SHORING/ 3RD & 4TH FL | | RESHORE | | BLDG 6, 4TH LEVEL SHORING/ 2ND & 3RD | | RESHORE |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
11 |
Status |
F |
Date |
2005-10-14 |
|
|
Cont ID |
|
Sent By |
hpiskura |
Date |
2005-10-14 |
Time |
08:42 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
2005-10-14 |
Time |
08:41 |
Sent To |
PC |
|
Notes |
2005-10-14 00:00:00 | SHORING LETTER MUST STATE THAT THE | | INSPECTIONS WERE PERFORMED BY THE | | INDIVIDUAL ENGINEER AND NOT THE FIRM. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
10 |
Status |
P |
Date |
2005-08-28 |
|
|
Cont ID |
|
Sent By |
jwitmer |
Date |
2005-08-28 |
Time |
11:04 |
Rev Time |
0.55 |
Received By |
jwitmer |
Date |
2005-08-28 |
Time |
11:04 |
Sent To |
PC |
|
Notes |
2005-08-28 00:00:00 | BUILDING PLAN REVIEW | | PERMIT: 04110185 | | ADD: 3900 N FLAGLER BLDG# 3/6 | | CONT: THE WEITZ CO | | TEL: (561)723-4706 | | FL BLD CODE= 2001 FLORIDA BUILDING CODE | | * WEST PALM BEACH AMENDMENTS | | | | TRUSS SHOP DRAWING REVIEW | | ACTION:REVIEWED |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
9 |
Status |
P |
Date |
2005-08-28 |
|
|
Cont ID |
|
Sent By |
jwitmer |
Date |
2005-08-28 |
Time |
10:51 |
Rev Time |
0.66 |
Received By |
jwitmer |
Date |
2005-08-28 |
Time |
10:51 |
Sent To |
PC |
|
Notes |
2005-08-28 00:00:00 | SUBMITTAL: | | SHORING LETTER FOR 3RD FL & | | 2ND FL RESHORING |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
8 |
Status |
P |
Date |
2005-08-27 |
|
|
Cont ID |
|
Sent By |
jwitmer |
Date |
2005-08-27 |
Time |
14:42 |
Rev Time |
0.22 |
Received By |
jwitmer |
Date |
2005-08-27 |
Time |
14:42 |
Sent To |
PC |
|
Notes |
2005-08-27 00:00:00 | 8-27-05 4TH FLOOR SHORING, 2ND & 3RD | | RESHORING LETTER. JW |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
7 |
Status |
P |
Date |
2005-07-26 |
|
|
Cont ID |
|
Sent By |
jwitmer |
Date |
2005-07-26 |
Time |
07:23 |
Rev Time |
0.50 |
Received By |
jwitmer |
Date |
2005-07-26 |
Time |
07:23 |
Sent To |
|
|
Notes |
2005-07-26 00:00:00 | LEVEL 2 SHORE /RESHORE LETTER |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
6 |
Status |
P |
Date |
2005-07-25 |
|
|
Cont ID |
|
Sent By |
jwitmer |
Date |
2005-07-25 |
Time |
17:39 |
Rev Time |
0.55 |
Received By |
jwitmer |
Date |
2005-07-25 |
Time |
17:39 |
Sent To |
PC |
|
Notes |
2005-07-25 00:00:00 | 07-25-05 RESHORING DRAWINGS FORTHE 2ND | | FLOOR /3RD FLOOR AND CERTIFICATION | | OLETER FOR 3RD FL POURJW |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
5 |
Status |
F |
Date |
2005-06-06 |
|
|
Cont ID |
|
Sent By |
jwitmer |
Date |
2005-06-06 |
Time |
13:08 |
Rev Time |
0.77 |
Received By |
jwitmer |
Date |
2005-06-06 |
Time |
13:08 |
Sent To |
PC |
|
Notes |
2005-06-06 00:00:00 | BUILDING PLAN REVIEW | | PERMIT: 04110185 | | ADD: 3900 N FLAGLER | | CONT: THE WEITZ CO | | TEL: (561)723-4706 | | FL BLD CODE= 2001 FLORIDA BUILDING CODE | | * WEST PALM BEACH AMENDMENTS | | | | 1ST REVIEW | | ACTION: DENIED | | | | | | 1) ALL SUBMITTAL INCLUDING SHOP DRAWINGS | | ARE TO BE REVIEWED BY THE DESIGN | | PROFESSIONALS (ENGINEER). | | BUILDING PLAN REVIEW | | JIM WITMER | | TEL: (561)805-6715 | | FAX: (561)659-8026 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
P |
Date |
2005-05-23 |
|
|
Cont ID |
|
Sent By |
jwitmer |
Date |
2005-05-23 |
Time |
11:26 |
Rev Time |
0.33 |
Received By |
jwitmer |
Date |
2005-05-23 |
Time |
11:25 |
Sent To |
PC |
|
Notes |
2005-05-23 00:00:00 | BLDG # 3/6 TIE IN SURVEY |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2005-05-06 |
|
|
Cont ID |
|
Sent By |
jwitmer |
Date |
2005-05-06 |
Time |
10:28 |
Rev Time |
2.22 |
Received By |
jwitmer |
Date |
2005-05-06 |
Time |
10:28 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2005-02-11 |
|
|
Cont ID |
|
Sent By |
jwitmer |
Date |
2005-02-11 |
Time |
15:23 |
Rev Time |
2.20 |
Received By |
jwitmer |
Date |
2005-02-11 |
Time |
15:23 |
Sent To |
|
|
Notes |
2005-02-11 00:00:00 | BUILDING PLAN REVIEW | | PERMIT:04110185 | | ADD:3900 N FLAGLER BLDG #3 | | CONT:MANHATTEN | | TEL:(561)719-3539 | | FL BLD CODE= 2001 FLORIDA BUILDING CODE | | * WEST PALM BEACH AMENDMENTS | | | | 2ND REVIEW | | ACTION: DENIED | | | | COMMENTS FROM BLDG #1 ARE COMMON TO ALL | | BUILDINGS. | | THREE (3) SETS OF PRODUCT APPROVALS WILL | | BE REQUIRED FOR THIS PROJECT. | | BUILDING PLAN REVIEW | | JIM WITMER | | TEL: (561)805-6715 | | FAX: (561)659-8026 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2004-12-13 |
|
|
Cont ID |
|
Sent By |
jwitmer |
Date |
2004-12-13 |
Time |
08:53 |
Rev Time |
3.50 |
Received By |
jwitmer |
Date |
2004-12-13 |
Time |
08:53 |
Sent To |
|
|
Notes |
2004-12-13 00:00:00 | BUILDING PLAN REVIEW | | PERMIT: 04110185 | | ADD: 3900 N FLAGLER DR (BLDG 3&6) | | CONT: MANHATTAN CONSTRUCTION | | TEL: (813)927-0209 | | FL BLD CODE= 2001 FLORIDA BUILDING CODE | | * WEST PALM BEACH AMENDMENTS | | | | 1ST REVIEW | | ACTION: DENIED | | | | | | WHEN RESUBMITTING PLANS PLEASE INDICATE | | THE REVISION & REMOVE & REPLACE ANY | | PAGES AS NECESSARY. A TRANSMITTAL | | LETTER | | LISTING THE ORIGINAL REVIEW COMMENT | | NUM- | | BER, WITH A DESCRIPTION OF THE REVISION | | MADE, IDENTIFYING THE SHEET OR | | SPECIFICA | | TION PAGE WHERE THE CHANGES CAN BE | | FOUND | | WILL HELP TO EXPEDITE YOUR PERMIT. | | THANK | | YOU FOR YOUR ANTICIPATED COOPERATION. | | | | 1) THIS PERMIT IS FOR (2) | | BUILDINGS,(3&6) PROVIDE (2) PERMIT | | APPLICATIONS, FOR (2) SEPERATE PERMIT | | THIS WILL BE REQUIRED FOR THE REQUIRED | | INSPECTION SCHEDULING & TRACKING. | | 1A) PLANS NEED TO AGREE WITH THE PERMIT | | APPLICATION. EITHER THE APPLICATION | | SHOULD BE FOR ONE BUILDING, WITH A | | FULL NFPA 13 SPRINKLER SYSTEM NOT A 13R | | AS STATED IN THE FIRE SPRINKLER PLANS | | OR THERE NEEDS TO BE A 4 HR FIRE WALL | | SEPERATING THIS STRUCTURE INTO (2) | | STRUCTUCES, THE SECOND ISSUE WOULD BE | | TABLE 500, IF A FULL NFPA 13 SUPRESSION | | SYSTEM IS NOT USED YOU CAN NOT TAKE THE | | | | ALLOWABLE HEIGHT INCREASES ALLOWABLE IN | | TABLE 500 (FOOTNOTE "J"/SEE 903.2. | | UNTIL THIS ISSUE IS RESOLVED IT WILL BE | | DIFFICULT TO DETERMINE TABLE 500 | | ISSUES. | | | | 2) PROVIDE SQ. FT. AREAAS OF AREA FOR | | EACH FLOOR INCLUDE A/C SPACE AND NON- | | A/C SPACE. | | | | 3)AT PARKING SPACES COMPLYING WITH | | 11-4.1.2(5)(B), PROVIDE MINIMUM VERTICAL | | CLEARENCE OF 98" AT PARKING SPACES AND | | ALONG AT LEAST ONE VEHICLE ACCESS ROUTE | | TO SUCH SPACES FROM SITE ENTRANCES AND | | EXITS. | | PROVIDE THE MINIMUM CLEARENCE OF 114" | | AT ACCESSIBLE PASSENGER LOADING ZONES & | | AT LEAST 1 VEHICLE ACCESS ROUTE TO SUCH | | AREAS FROM SITE ENTRANCES & EXITS. | | | | 3) NOTE, NOT DISCUSSED UNDER BLDG# 1, | | IS | | SITE AMENITIES, GAURD HOUSE, WALLS, | | WALKWAYS, ETC... REQUIRE A SEPERATE | | PERMIT. ASSUMED SEAWALL IS ALREADY | | BUILT, IF NOT A SEPERATE PERMIT IS ALSO | | REQUIRED, SEE CITY CODE FOR REQUIRED | | SEAWALL APPROVALS. | | | | 4) COMMENTS FROM BLDG# 1 1-33 ALSO | | PERTAIN TO THIS REVIEW. | | | | 5)BEFORE A PERMIT TO CONSTRUCT, MAY BE | | ISSUED, IMPACT FEES MUST BE PAID TO PALM | | BEACH COUNTY. THE ACTUAL PERMIT | | SET OF PLANS MUST BE STAMPED BY THAT | | OFFICE, AND A COPY OF THE PAID RECEIPT | | ATTACHED TO THE PERMIT APPLICATION. | | PLEASE CALL (561)233-5025 FOR MORE | | INFORMATION. | | | | | | BUILDING PLAN REVIEW | | JIM WITMER | | TEL: (561)805-6715 | | FAX: (561)659-8026 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
17 |
Status |
P |
Date |
2007-02-26 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2007-02-26 |
Time |
16:24 |
Rev Time |
1.00 |
Received By |
jleahy |
Date |
2007-02-26 |
Time |
16:24 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
16 |
Status |
P |
Date |
2006-12-22 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2006-12-22 |
Time |
06:39 |
Rev Time |
0.45 |
Received By |
jleahy |
Date |
2006-12-22 |
Time |
06:39 |
Sent To |
|
|
Notes |
2006-12-22 06:40:01 | PAGES E-208, E-502 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
15 |
Status |
P |
Date |
2006-12-06 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2006-12-06 |
Time |
12:07 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2006-12-06 |
Time |
11:33 |
Sent To |
PC |
|
Notes |
2006-12-06 12:08:10 | REV E208 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
13 |
Status |
P |
Date |
2006-10-31 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2006-10-31 |
Time |
16:25 |
Rev Time |
1.00 |
Received By |
jleahy |
Date |
2006-10-31 |
Time |
16:25 |
Sent To |
|
|
Notes |
2006-10-31 16:25:08 | NEED TO SHOW SIZE OF CONTROLLERS NOT SHOWN ON DRAWINGS | 2006-10-20 07:08:26 | ELECTRICAL RISER/ REVISIONS GIVEN TO JAKE LEAHY FOR | | REVIEW. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
12 |
Status |
P |
Date |
2006-06-16 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2006-06-16 |
Time |
20:17 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2006-06-16 |
Time |
20:17 |
Sent To |
FIRE |
|
Notes |
2006-06-16 00:00:00 | REV FOR UNIT LAYOUT. | | ROUTED TO FIRE |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
11 |
Status |
N |
Date |
2006-06-02 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2006-06-02 |
Time |
07:56 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2006-06-02 |
Time |
07:56 |
Sent To |
|
|
Notes |
2006-06-02 00:00:00 | NO ELECTRICAL PLANS SUBMITTED. REVISION | | COVER SHEET IS CHECKED OFF FOR | | ELECTRICAL. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
10 |
Status |
F |
Date |
2006-06-01 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2006-06-01 |
Time |
08:04 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2006-06-01 |
Time |
07:52 |
Sent To |
PC |
|
Notes |
2006-06-01 00:00:00 | ****** UNSAT ******* | | | | 1) NOTE: PLEASE SEE SD'S, CIRCUTIING AND | | NOTES FROM 12/05, 5/06 THESE ARE THE | | SAME NOTES FOR THE CIRCUITING. | | | | 2) NOTE: PLEASE KNOW, COPIES OF PLANS | | ARE NOW BEING RETAINED FOR FILE AND | | POSSIBLE REVIEW BY THE FLORIDA BORAD OF | | PROFESSIONAL ENGINEERS. | | PLEASE SEE FS 553.80(2)B) WITH RESPECT | | TO THE DESIGN PROFESSINAL ANDREPEAT | | COMMENTS THREE OR MORE TIMES. | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | REVIEW. IF THERE ARE ANY QUESTIONS, | | PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-805-6717 | | [email protected] |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
9 |
Status |
F |
Date |
2006-12-22 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2006-05-26 |
Time |
06:38 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2006-05-25 |
Time |
07:13 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
8 |
Status |
F |
Date |
2006-05-17 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2006-05-17 |
Time |
09:34 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2006-05-16 |
Time |
20:37 |
Sent To |
|
|
Notes |
2006-05-17 00:00:00 | ******** UNSAT ********* | | | | | | 1) NOTE: PLEASE SEE COMMENTS FROM | | PREVIOUS REVIEW AS THE SD'S ARE STILL | | SHOWN BEING WIRED TO MORE THAN ONE | | CIRCUIT IN A SINGLE UNIT?? | | PLEASE KNOW, THE SD'S ARE REQUIRED TO | | WIRED "INLINE", WHICH AS SHOWN ON | | MULTIPLE CIRCUITS IS NOT PERMITTED. | | THESE MAY BE WIRED TO THE ARC FAULT | | PROTECTED BEDRM CIRCUIT, HOWEVEER THESE | | CAN ONLY BE ON ONE CIRCUIT. | | NFPA-72 8-1.4.1.6.2, | | | | 2) NOTE: PLEASE SEE SEC'S HAVE NOW BEEN | | DOWN SIZED TO 3/0'S FOR ONE FIRE PUMP | | SERVICE, AND 4/0'S FOR THE OTHER. | | PLEASE SEE THAT THE SEC'S SHALL ME SIZED | | ACCORDINGLY TO THE OCP, HP, AND THE SIZE | | OF THE FPC. | | PLEASE SEE 310.16, AS 3/0'S ARE ONLY | | RATED AT 200A'S AND THE 4/0'S ARE ONLY | | RATED FOR 225A'S. PLEASE SEE | | 240.4,310.16. | | THE OCP SHOWN ON MAIN IS 250A'S. | | (LOOCKED ROTOR SHOULD BE SET AND PART OF | | THE FPC AND MUST BE 6X THE FLA'S. | | 695.4/695.5 | | | | ** NOTE ** | | PLEASE KNOW, IT HAS COME TO THE | | ATTENTION OF THIS OFFICE THAT SOME OF | | THE SLIDING GLASS DOORS ON PLANS ARE | | ACTUALLY "FIXED GLASS PANELS" PLEASE SEE | | 210.52 AS "FIXED GLASS" IS CONSIDERED | | WALL SPACE. | | PLEASE SEE PLANS IN MANY PLACES STILL | | INDICATE MANY OF THESE AS SLIDING GLASS | | DOORS?? AS REVIEWED ON PREVIOUS PLANS. | | ANY INSTALLATION OF FIXED GLASS PANELS, | | WILL BE VERIFIED IN THE FIELD AND PLANS | | SHALL BE REVISED ACCORDING TO ACTUAL | | WALL SPACE CONSTRUCTED. | | | | | | PLEASE REVISE AND SUBMIT THE ABOVE | | INFORMATION FOR REVIEW. IF THERE ARE ANY | | QUESTIONS, PLEASE DO NOT HESITATE IN | | CONTACTING THIS OFFICE. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-805-6717 | | [email protected] | 2006-05-16 00:00:00 | NOTES TO FOLLOW. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
7 |
Status |
P |
Date |
2006-05-09 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2006-05-09 |
Time |
20:15 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2006-05-09 |
Time |
20:15 |
Sent To |
PC |
|
Notes |
2006-05-09 00:00:00 | REV FOR RECEPT SPACING. | | REDLINED PLANS, SPACING TO MEET 210.52 | | INCLUDING ALL FIXED GLASS PANELS WHICH | | ARE CONSIDERED WALL SPACE. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
6 |
Status |
N |
Date |
2006-01-23 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2006-01-23 |
Time |
15:10 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2006-01-23 |
Time |
15:10 |
Sent To |
M |
|
Notes |
2006-01-23 00:00:00 | SUBMITTIAL FOR DRY-IN OF BLDG,NOT FOR | | ELEC REVIEW. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
5 |
Status |
N |
Date |
2005-12-30 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2005-12-30 |
Time |
15:10 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2005-12-30 |
Time |
15:10 |
Sent To |
|
|
Notes |
2005-12-30 00:00:00 | APPLIANCE SUBMITTIALS NOT NEED FOR | | REVIEW. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
4 |
Status |
F |
Date |
2005-12-09 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2005-12-09 |
Time |
15:33 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2005-12-09 |
Time |
15:33 |
Sent To |
|
|
Notes |
2005-12-09 00:00:00 | ****** UNSAT ******* | | | | 1)NOTE: PLEASE SEE NOTE ON ALL PLANS | | INDICATE SD'S ARE TO BE WIRED TO | | HALL/FOYER CIRCUITS, HOWEVER CIRCUITING | | ON PLANS WAS NOT CHANGED. | | PLEASE BE SURE THAT IF THESE SD'S ARE | | NOW GOING TO CHANGE TO HALL/FOYER LTS, | | THEN THESE CIRCUITS WILL ALSO NOW BE | | REQUIRED TO BE ARC FAULT.210.12 | | PLEASE ALSO SEE CIRCUITING FOR SD'S HAS | | GONE BACK TO THE SD'S OF THE SAME UNIT | | BEING WIRED TO MORE THAN ONE CIRCUIT. | | SMOKE DETECTORS ARE REQUIRED TO BE WIRED | | INLINE AND THIS WILL NOT WORK ON MORE | | THAN ONE CIRCUIT. | | PLEASE ADJUST ALL CIRCUITING. | | | | 2)NOTE: PLEASE SEE FIRE PUMP | | FEEDERS/SEC'S FROM THE FPL TRANSFORMER | | TO THE METER AND FROM THE METER TO THE | | FIRST MEANS OF DISCONNECT IS NOTED AS | | HAVING AN EQUIPMENT GROUNDING CONDUCTOR. | | PLEASE REVISE SCHEDULE. | | THESE ARE ONLY INSTALLED AFTER THE FIRST | | MEANS OF DISCONNECT. | | | | 3)NOTE: PLEASE SEE 302 WHICH DOES NOT | | INDICATE ANY REVISONS, HOWEVER TITLE | | BLOCK DOES INDICATE THIS. | | | | 4)NOTE: PLEASE SEE 620.23 A SEPARATE | | BRANCH CIRCUIT SHALL SUPPLY THE MACHINE | | ROOM OR CONTROL ROOM/MACHINERY SPACE OR | | CONTROL SPACE LIGHTING AND | | RECEPTACLE(S). | | | | PLEASE MAKE THE ABOVE CORRECTIONS AND | | SUBMIT FOR REVIEW. IF THERE ARE ANY | | QUESTIONS, PLEASE DO NOT HESITATE IN | | CONTACTING THIS OFFICE. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-805-6717 | | [email protected] |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
P |
Date |
2005-04-25 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2005-04-25 |
Time |
18:28 |
Rev Time |
4.00 |
Received By |
dpalmer |
Date |
2005-04-25 |
Time |
18:28 |
Sent To |
|
|
Notes |
2005-04-25 00:00:00 | **REDLINED ** | | | | 1) NO EQUIPMENT GROUNDING CONDUCTORS | | FROM TRANSFORMER TO METER OR METER TO | | FIRST MEANS OF DISCONNECT. | | 250.6,250.24 | | EQUIPMENT GROUNDING CONDUCTORS SHOWN TO | | FIRE PUMP SHALL NOT BE INSTALLED. | | | | ALL 12 ROLLS STAMPED FOR ELECTRICAL. | | NO REVISION NEEDED. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
F |
Date |
2005-02-14 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2005-02-14 |
Time |
09:54 |
Rev Time |
1.25 |
Received By |
dpalmer |
Date |
2005-02-14 |
Time |
09:54 |
Sent To |
|
|
Notes |
2005-02-14 00:00:00 | *** NOTES *** | | THIS IS FOR BLDGS: 1,2,5 AND 6. | | THIS COMMENT DOES NOT AFFECT BLDGS: 3 OR | | 4. | | | | 1)NOTE:PLEASE SEE NFPA-20 IN REFERENCE | | TO FIRE PUMP ELECTRICAL SERVICE | | LOCATION. | | PLEASE SEE SERVICE SHALL BE LOCATED AS | | NOT TO BE AFFECTED IN CASE OF FIRE / | | EXPLOSION ETC WITH MAIN ELECTRICAL | | SERVICE. | | THIS FIRE PUMP SERVICE SHOULD STILL BE | | LOCATED IN CLOSE PROXIMITY TO MAIN | | ELECTRICAL RM. | | PLEASE SEE NFPA-20, 6.2.1 | | 6-2.1 SERVICE. | | WHERE POWER IS SUPPLIED BY A SERVICE, IT | | SHALL BE LOCATED AND ARRANGED TO | | MINIMIZE THE POSSIBILITY OF DAMAGE BY | | FIRE FROM WITHIN THE PREMISES AND | | EXPOSING HAZARDS. | | NFPA-70 695 | | THE CONNECTION SHALL BE LOCATED AND | | ARRANGED SO AS TO MINIMIZE THE | | POSSIBILITY OF DAMAGE BY FIRE FROM | | WITHIN THE PREMISES AND FROM EXPOSING | | HAZARDS. | | MOST IMPORTANT IN 695.3(A)(2) IS THE | | REQUIREMENT THAT A FIRE IN ONE SOURCE | | NOT AFFECT THE RELIABILITY OF ANOTHER | | SOURCE. | | | | THIS WAS NOT IN ORIGINAL REVIEW NOTES. | | | | PLEASE MAKE THE ABOVE CHANGES AND SUBMIT | | FOR REVIEW. IF THERE ARE ANY QUESTIONS, | | PLEASE DO NOT HESITATE TO CONTACTING. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-805-6717 | | [email protected] |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2004-12-01 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2004-12-01 |
Time |
14:50 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2004-11-23 |
Time |
19:52 |
Sent To |
|
|
Notes |
2004-12-01 00:00:00 | PLEASE SEE NOTES UNDER 04110182 | 2004-11-23 00:00:00 | IN ELECTRICAL FOR REVIEW. | | NOTES WILL FOLLOW. |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
2 |
Status |
N |
Date |
2005-02-23 |
|
|
Cont ID |
|
Sent By |
mamini |
Date |
2005-02-23 |
Time |
11:22 |
Rev Time |
0.00 |
Received By |
mamini |
Date |
2005-02-23 |
Time |
11:22 |
Sent To |
|
|
Notes |
2005-02-23 00:00:00 | N: | | | | 1. SEE PERMIT# 05021226 FOR | | UNDERGROUND UTILITIES AND SITE WORK. | | THIS PERMIT INCLUDES BUILDING PADS | | PREPARATION FOR ALL BUILDINGS. | | | | IF ANY QUESTION PLEASE CONTACT 805-6723 | | MOHAMMAD R. AMINI |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
P |
Date |
2004-11-15 |
|
|
Cont ID |
|
Sent By |
mamini |
Date |
2004-11-15 |
Time |
16:16 |
Rev Time |
0.00 |
Received By |
mamini |
Date |
2004-11-15 |
Time |
16:16 |
Sent To |
|
|
Notes |
2004-11-15 00:00:00 | PASSED WITH PROVISOS: | | | | 1. EROSION AND SEDIMENTATION CONTROL | | DEVICES SHALL BE IN PLACE PRIOR TO | | BEGINNING CLEARING OR GRUBBING, | | DEMOLITION, OR OTHER SUCH CONSTRUCTION | | ACTIVITIES.THE DEVICES SHALL BE | | INSTALLED, MONITORED, AND MAINTAINED IN | | ACCORDANCE WITH ALL APPLICABLE FEDERAL, | | STATE, AND LOCAL REQUIREMENTS. | | | | 2. WORK WITHIN PUBLIC R.O.W REQUIRES A | | PERMIT FROM PUBLIC UTILITIES AND | | ENGINEERING, PLEASE SUBMIT M.O.T PLANS | | ALSO AT THE TIME OF APPLICATION ATT: | | WINDEL PALMER, 494-1086. | | | | IF ANY QUESTION PLEASE CONTACT 805-6723 | | MOHAMMAD R. AMINI |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
6 |
Status |
P |
Date |
2006-06-29 |
|
|
Cont ID |
|
Sent By |
nmccray |
Date |
2006-06-29 |
Time |
13:51 |
Rev Time |
0.00 |
Received By |
nmccray |
Date |
2006-06-29 |
Time |
13:51 |
Sent To |
|
|
Notes |
2006-06-29 00:00:00 | ELECTRICAL REVISION DATE 06-06-06 |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
5 |
Status |
N |
Date |
2006-06-08 |
|
|
Cont ID |
|
Sent By |
mwennerg |
Date |
2006-06-08 |
Time |
13:53 |
Rev Time |
0.00 |
Received By |
mwennerg |
Date |
2006-06-08 |
Time |
13:53 |
Sent To |
|
|
Notes |
2006-06-08 00:00:00 | REVISION DATED 2/13/06 | | | | NO NEW COMMENTS SINCE LAST FIRE REVIEW. |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
4 |
Status |
N |
Date |
2006-01-26 |
|
|
Cont ID |
|
Sent By |
nmccray |
Date |
2006-01-26 |
Time |
12:36 |
Rev Time |
0.00 |
Received By |
nmccray |
Date |
2006-01-26 |
Time |
12:36 |
Sent To |
I |
|
Notes |
2006-01-26 00:00:00 | PLEASE SEE NOTES UNDER PERMIT # 04110182 |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
3 |
Status |
P |
Date |
2005-12-13 |
|
|
Cont ID |
|
Sent By |
nmccray |
Date |
2005-12-13 |
Time |
14:34 |
Rev Time |
0.00 |
Received By |
nmccray |
Date |
2005-12-13 |
Time |
14:34 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
P |
Date |
2005-02-28 |
|
|
Cont ID |
|
Sent By |
nmccray |
Date |
2005-02-28 |
Time |
15:03 |
Rev Time |
0.00 |
Received By |
nmccray |
Date |
2005-02-28 |
Time |
15:03 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
F |
Date |
2004-12-31 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2004-12-31 |
Time |
09:35 |
Rev Time |
0.00 |
Received By |
pkrauss |
Date |
2004-12-31 |
Time |
09:35 |
Sent To |
|
|
Notes |
2004-12-31 00:00:00 | SEE COMMENTS ON PERMIT 04110184 |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
54 |
Status |
N |
Date |
2007-05-21 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2007-05-21 |
Time |
16:32 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2007-05-21 |
Time |
16:32 |
Sent To |
B |
|
Notes |
2007-05-21 16:32:23 | TO "JWITMER" DESK/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
53 |
Status |
N |
Date |
2007-04-16 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2007-04-16 |
Time |
14:22 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2007-04-16 |
Time |
14:22 |
Sent To |
B |
|
Notes |
2007-04-16 14:22:42 | TO "JWITMER" DESK/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
52 |
Status |
N |
Date |
2007-03-15 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2007-03-15 |
Time |
13:50 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2007-03-15 |
Time |
13:50 |
Sent To |
B |
|
Notes |
2007-03-15 13:51:16 | TO "SHILL" DESK/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
51 |
Status |
N |
Date |
2007-02-16 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2007-02-16 |
Time |
16:08 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2007-02-16 |
Time |
16:08 |
Sent To |
E |
|
Notes |
2007-02-16 16:08:57 | TO "DPALMER" DESK/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
50 |
Status |
N |
Date |
2006-12-18 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2006-12-18 |
Time |
10:11 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2006-12-18 |
Time |
10:11 |
Sent To |
E |
|
Notes |
2006-12-18 10:11:52 | TO "DPALMER" DESK/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
49 |
Status |
N |
Date |
2006-12-18 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2006-12-18 |
Time |
10:06 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2006-12-18 |
Time |
10:06 |
Sent To |
E |
|
Notes |
2006-12-18 10:06:54 | TO "DPALMER" DESK/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
48 |
Status |
N |
Date |
2006-12-18 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2006-12-18 |
Time |
09:43 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2006-12-18 |
Time |
09:43 |
Sent To |
M |
|
Notes |
2006-12-18 09:44:10 | TO "M" BOX/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
47 |
Status |
N |
Date |
2006-11-29 |
|
|
Cont ID |
|
Sent By |
mmiller |
Date |
2006-11-29 |
Time |
17:23 |
Rev Time |
0.00 |
Received By |
mmiller |
Date |
2006-11-29 |
Time |
17:23 |
Sent To |
E |
|
Notes |
2006-11-29 17:23:38 | SENT TO DEWEY PALMER'S DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
46 |
Status |
N |
Date |
2006-11-12 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2006-11-12 |
Time |
13:54 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2006-11-12 |
Time |
13:54 |
Sent To |
E |
|
Notes |
2006-11-12 13:55:09 | TO "DPALMER" DESK/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
45 |
Status |
|
Date |
|
|
|
Cont ID |
|
Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
Received By |
|
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
44 |
Status |
N |
Date |
2006-10-10 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2006-10-10 |
Time |
17:57 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2006-10-10 |
Time |
17:57 |
Sent To |
E |
|
Notes |
2006-10-10 17:58:11 | TO "DPALMER" DESK/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
43 |
Status |
N |
Date |
2006-07-19 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2006-07-19 |
Time |
09:52 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2006-07-19 |
Time |
09:52 |
Sent To |
FIRE |
|
Notes |
2006-07-19 00:00:00 | TO "F" BOX/REV | | 7/19/06--CONTRACTOR PULLED PLANS FROM | | REVIEW PROCESS--SEE FRONT SCREEN NOTE. | | ADARROUGH | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
42 |
Status |
N |
Date |
2006-06-26 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2006-06-26 |
Time |
10:30 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2006-06-26 |
Time |
10:30 |
Sent To |
M |
|
Notes |
2006-06-26 00:00:00 | TO "M" BOX/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
41 |
Status |
N |
Date |
2006-06-08 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2006-06-08 |
Time |
18:24 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2006-06-08 |
Time |
18:24 |
Sent To |
E |
|
Notes |
2006-06-08 00:00:00 | TO "DPALMER" DESK/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
40 |
Status |
N |
Date |
2006-05-26 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2006-05-26 |
Time |
16:09 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2006-05-26 |
Time |
16:09 |
Sent To |
M |
|
Notes |
2006-05-26 00:00:00 | TO "M" BOX/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
39 |
Status |
N |
Date |
2006-05-24 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2006-05-03 |
Time |
10:30 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2006-05-03 |
Time |
10:30 |
Sent To |
|
|
Notes |
2006-05-24 00:00:00 | TO "COMM" BD#64- 3 REV'S |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
38 |
Status |
N |
Date |
2006-05-23 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2006-05-23 |
Time |
16:13 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2006-05-23 |
Time |
16:13 |
Sent To |
E |
|
Notes |
2006-05-23 00:00:00 | TO "E" BOX/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
37 |
Status |
N |
Date |
2006-05-12 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2006-05-12 |
Time |
14:32 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2006-05-12 |
Time |
14:32 |
Sent To |
M |
|
Notes |
2006-05-12 00:00:00 | TO "M" BOX/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
36 |
Status |
N |
Date |
2006-05-05 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2006-05-05 |
Time |
11:06 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2006-05-05 |
Time |
11:06 |
Sent To |
E |
|
Notes |
2006-05-05 00:00:00 | TO "DPALMER" DESK/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
35 |
Status |
N |
Date |
2006-05-04 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2006-05-04 |
Time |
13:17 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2006-05-04 |
Time |
13:17 |
Sent To |
|
|
Notes |
2006-05-05 00:00:00 | TO "COMM" BD#61-3 REV'S | 2006-05-04 00:00:00 | WAITING FOR "COMM" BD-REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
34 |
Status |
N |
Date |
2006-04-21 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2006-04-21 |
Time |
15:04 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2006-04-21 |
Time |
15:04 |
Sent To |
FIRE |
|
Notes |
2006-04-21 00:00:00 | TO "F" BOX |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
33 |
Status |
N |
Date |
2006-04-21 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2006-04-21 |
Time |
12:04 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2006-04-21 |
Time |
12:04 |
Sent To |
B |
|
Notes |
2006-04-21 00:00:00 | TO "JWITMER" DESK/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
32 |
Status |
N |
Date |
2006-04-21 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2006-04-21 |
Time |
11:54 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2006-04-21 |
Time |
11:54 |
Sent To |
B |
|
Notes |
2006-04-21 00:00:00 | TO "JWITMER" DESK/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
31 |
Status |
N |
Date |
2006-04-14 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2006-04-14 |
Time |
11:08 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2006-04-14 |
Time |
11:08 |
Sent To |
|
|
Notes |
2006-04-14 00:00:00 | WAITING FOR "COMM" BD |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
30 |
Status |
N |
Date |
2006-03-10 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2006-03-10 |
Time |
15:43 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2006-03-10 |
Time |
15:43 |
Sent To |
B |
|
Notes |
2006-03-10 00:00:00 | TO "SHILL" DESK/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
29 |
Status |
N |
Date |
2006-01-26 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2006-01-26 |
Time |
13:33 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2006-01-26 |
Time |
13:33 |
Sent To |
B |
|
Notes |
2006-01-26 00:00:00 | TO "SHILL" DESK/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
28 |
Status |
N |
Date |
2006-01-18 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2006-01-18 |
Time |
14:44 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2006-01-18 |
Time |
14:44 |
Sent To |
E |
|
Notes |
2006-01-18 00:00:00 | TO "DPALMER" DESK/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
27 |
Status |
N |
Date |
2005-12-29 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-12-29 |
Time |
16:50 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-12-29 |
Time |
16:50 |
Sent To |
E |
|
Notes |
2005-12-29 00:00:00 | TO "DPALMER" DESK/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
26 |
Status |
N |
Date |
2005-12-29 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-12-29 |
Time |
16:33 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-12-29 |
Time |
16:33 |
Sent To |
M |
|
Notes |
2005-12-29 00:00:00 | TO "M" BOX/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
25 |
Status |
N |
Date |
2005-12-29 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-12-29 |
Time |
16:02 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-12-29 |
Time |
16:02 |
Sent To |
FIRE |
|
Notes |
2005-12-29 00:00:00 | TO "F" BOX |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
24 |
Status |
N |
Date |
2005-12-29 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-12-29 |
Time |
15:59 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-12-29 |
Time |
15:59 |
Sent To |
B |
|
Notes |
2005-12-29 00:00:00 | TO "SHILL" DESK/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
23 |
Status |
N |
Date |
2005-11-23 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-11-23 |
Time |
16:24 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-11-23 |
Time |
16:24 |
Sent To |
B |
|
Notes |
2005-11-23 00:00:00 | TO "JWITMER" DESK/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
22 |
Status |
N |
Date |
2005-11-16 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-11-16 |
Time |
15:59 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-11-16 |
Time |
15:59 |
Sent To |
B |
|
Notes |
2005-11-16 00:00:00 | TO "JWITMER" DESK/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
21 |
Status |
N |
Date |
2005-09-19 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-09-19 |
Time |
15:30 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-09-19 |
Time |
15:30 |
Sent To |
|
|
Notes |
2005-09-22 00:00:00 | TO "COMM" BD#1/PLANS ON RACK/4 ROLLS | 2005-09-19 00:00:00 | WAITING FOR "COMM" BD |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
20 |
Status |
N |
Date |
2005-09-16 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-09-16 |
Time |
10:52 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-09-16 |
Time |
10:52 |
Sent To |
B |
|
Notes |
2005-09-16 00:00:00 | TO "JWITMER" DESK/2 SUBMITTALS |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
19 |
Status |
N |
Date |
2005-09-08 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-09-08 |
Time |
18:37 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-09-08 |
Time |
18:37 |
Sent To |
E |
|
Notes |
2005-09-08 00:00:00 | TO "DPALMER" DESK/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
18 |
Status |
N |
Date |
2005-09-08 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-09-08 |
Time |
18:35 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-09-08 |
Time |
18:35 |
Sent To |
B |
|
Notes |
2005-09-08 00:00:00 | TO "JWITMER" DESK/2 SUBMITTALS |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
17 |
Status |
N |
Date |
2005-08-24 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-08-24 |
Time |
18:48 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-08-24 |
Time |
18:48 |
Sent To |
B |
|
Notes |
2005-08-24 00:00:00 | TO "JWITMER" DESK/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
16 |
Status |
N |
Date |
2005-08-19 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-08-19 |
Time |
08:58 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-08-19 |
Time |
08:58 |
Sent To |
B |
|
Notes |
2005-08-19 00:00:00 | TO "JWITMER" DESK/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
15 |
Status |
N |
Date |
2005-07-27 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-07-27 |
Time |
08:27 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-07-27 |
Time |
08:27 |
Sent To |
B |
|
Notes |
2005-07-27 00:00:00 | TO "JWITMER" DESK/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
14 |
Status |
N |
Date |
2005-07-25 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-07-25 |
Time |
16:02 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-07-25 |
Time |
16:02 |
Sent To |
B |
|
Notes |
2005-07-25 00:00:00 | TO "JWITMER" DESK/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
13 |
Status |
N |
Date |
2005-07-14 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-07-14 |
Time |
16:08 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-07-14 |
Time |
16:08 |
Sent To |
B |
|
Notes |
2005-07-14 00:00:00 | TO "JWITMER" DESK/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
12 |
Status |
N |
Date |
2005-07-13 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-07-13 |
Time |
10:04 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-07-13 |
Time |
10:04 |
Sent To |
B |
|
Notes |
2005-07-13 00:00:00 | TO "JWITMER" DESK/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
11 |
Status |
N |
Date |
2005-07-06 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-07-06 |
Time |
11:47 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-07-06 |
Time |
11:47 |
Sent To |
B |
|
Notes |
2005-07-06 00:00:00 | TO "JWITMER" DESK/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
10 |
Status |
N |
Date |
2005-06-21 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-06-21 |
Time |
11:19 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-06-21 |
Time |
11:19 |
Sent To |
B |
|
Notes |
2005-06-21 00:00:00 | TO "JWITMER" DESK/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
9 |
Status |
N |
Date |
2005-06-10 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2005-06-10 |
Time |
15:54 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2005-06-10 |
Time |
15:54 |
Sent To |
P |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
8 |
Status |
N |
Date |
2005-06-08 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2005-06-08 |
Time |
17:49 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2005-06-08 |
Time |
17:49 |
Sent To |
B |
|
Notes |
2005-06-08 00:00:00 | TO JW DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
7 |
Status |
N |
Date |
2005-06-08 |
|
|
Cont ID |
|
Sent By |
mjacobs |
Date |
2005-06-08 |
Time |
07:56 |
Rev Time |
0.00 |
Received By |
mjacobs |
Date |
2005-06-08 |
Time |
07:55 |
Sent To |
ENG |
|
Notes |
2005-06-08 00:00:00 | TO 'MAMINI' DESK. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
6 |
Status |
N |
Date |
2005-06-02 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-06-02 |
Time |
18:38 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-06-02 |
Time |
18:38 |
Sent To |
B |
|
Notes |
2005-06-02 00:00:00 | TO "JWITMER" DESK/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
2005-05-12 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-05-12 |
Time |
14:02 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-05-12 |
Time |
14:02 |
Sent To |
B |
|
Notes |
2005-05-12 00:00:00 | TO "JWITMER" DESK/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2005-04-27 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-04-27 |
Time |
14:06 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-04-27 |
Time |
14:06 |
Sent To |
B |
|
Notes |
2005-04-27 00:00:00 | TO "JWITMER" DESK/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2005-01-26 |
|
|
Cont ID |
|
Sent By |
ptjomsto |
Date |
2005-01-26 |
Time |
15:03 |
Rev Time |
0.00 |
Received By |
ptjomsto |
Date |
2005-01-26 |
Time |
15:03 |
Sent To |
|
|
Notes |
2005-01-26 00:00:00 | SUMITTAL GIVEN TO NEIL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2005-01-20 |
|
|
Cont ID |
|
Sent By |
mjacobs |
Date |
2005-01-20 |
Time |
11:00 |
Rev Time |
0.00 |
Received By |
mjacobs |
Date |
2005-01-20 |
Time |
11:00 |
Sent To |
|
|
Notes |
2005-01-20 00:00:00 | TO "COMM BD#61/RESUB. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2004-12-31 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2004-12-31 |
Time |
09:36 |
Rev Time |
0.00 |
Received By |
pkrauss |
Date |
2004-11-05 |
Time |
10:46 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
11 |
Status |
P |
Date |
2007-01-30 |
|
|
Cont ID |
|
Sent By |
rregueir |
Date |
2007-01-30 |
Time |
13:23 |
Rev Time |
0.00 |
Received By |
rregueir |
Date |
2007-01-30 |
Time |
13:51 |
Sent To |
PC |
|
Notes |
2007-01-30 13:24:32 | ADDITION OF EXHAUST FANS TO GARAGE FOR CO REMOVAL. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
10 |
Status |
P |
Date |
2007-01-30 |
|
|
Cont ID |
|
Sent By |
rregueir |
Date |
2007-01-30 |
Time |
13:21 |
Rev Time |
0.00 |
Received By |
rregueir |
Date |
2007-01-29 |
Time |
15:32 |
Sent To |
PC |
|
Notes |
2007-01-30 13:23:14 | PG M209 REVISION FOR DRYER AND BATH DISCHARGE LOCATIONS | | J UNIT. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
9 |
Status |
P |
Date |
2006-06-29 |
|
|
Cont ID |
|
Sent By |
hmoser |
Date |
2006-06-29 |
Time |
13:45 |
Rev Time |
0.00 |
Received By |
hmoser |
Date |
2006-06-29 |
Time |
13:45 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
8 |
Status |
F |
Date |
2006-06-20 |
|
|
Cont ID |
|
Sent By |
hmoser |
Date |
2006-06-20 |
Time |
10:14 |
Rev Time |
0.00 |
Received By |
hmoser |
Date |
2006-06-20 |
Time |
10:14 |
Sent To |
|
|
Notes |
2006-06-20 00:00:00 | PLAN DENIED | | PLEASE PROVIDE ENERGY CALCULATIONS AND | | MANUAL J WITH REVISIONS. | | PLAN REVIEW BY HAROLD MOSER 561-805-6732 |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
7 |
Status |
P |
Date |
2006-06-13 |
|
|
Cont ID |
|
Sent By |
hmoser |
Date |
2006-06-13 |
Time |
15:51 |
Rev Time |
0.00 |
Received By |
hmoser |
Date |
2006-06-13 |
Time |
15:50 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
6 |
Status |
P |
Date |
2006-06-01 |
|
|
Cont ID |
|
Sent By |
tgordon |
Date |
2006-06-01 |
Time |
15:33 |
Rev Time |
0.45 |
Received By |
tgordon |
Date |
2006-06-01 |
Time |
15:33 |
Sent To |
|
|
Notes |
2006-06-01 00:00:00 | REVISION TO MECH. PLAN PAGE M210 . |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
5 |
Status |
P |
Date |
2006-05-15 |
|
|
Cont ID |
|
Sent By |
tgordon |
Date |
2006-05-15 |
Time |
14:01 |
Rev Time |
0.45 |
Received By |
tgordon |
Date |
2006-05-15 |
Time |
14:01 |
Sent To |
|
|
Notes |
2006-05-15 00:00:00 | REVISION TO MECH. PLANS PAGE M205. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
4 |
Status |
F |
Date |
2006-01-04 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2006-01-04 |
Time |
15:17 |
Rev Time |
0.00 |
Received By |
pkrauss |
Date |
2006-01-04 |
Time |
15:16 |
Sent To |
|
|
Notes |
2006-01-04 00:00:00 | DENIED: PERMIT 04110185 | | PLANS INDICATE VE FOR VARIOUS AHU'S TO A | | LESSER TONNAGE/BTU'S.ENERGY &MANUAL | | J CALCULATIONS HAVE NOT BEEN REVISED. | | PLEASE CLARIFY MANUFACTURER REQUIREMENT | | FOR SIZING OF THE LINE SETS. | | | | PLANS INDICATE THE FOLLOWING CHANGES: | | PLAN SHEET M-201 UNIT A1 | | AHU-1 (2 TON) REPLACING AHU-2 (2.5 TON) | | AHU-5 (4 TON) REPLACING AHU-6 (5 TON) | | | | PLAN SHEET M203 UNIT C2 | | AHU-1 (2 TON) REPLACING AHU-2 (2.5 TON) | | AHU-2 (2.5 TON) REPLACING AHU-3 (3 TON) | | | | PLAN SHEET M205 UNIT C3 | | AHU-4 (3.5 TON) REPLACING AHU-5 (4 TON) | | AHU-7 (1.5 TON ) REPLACING AHU-1 (2 TON) | | | | PLAN SHEET M206 UNIT A4 | | AHU-1 (2 TON) REPLACING AHU-2 (2.5 TON) | | AHU-5 (4 TON) REPLACING AHU-6 (5 TON) | | | | PLAN SHEET M208UNITS E5 & D-5 | | AHU-1 (2 TON) REPLACING AHU-2 (2.5 TON) | | AHU-3 (3 TON) REPLACING AHU-4 (3.5 TON) | | AHU-7 (1.5 TON)REPLACING AHU-1(2 TON) | | | | PLAN SHEET M210 UNITS F6, E6, & D6 | | AHU-1 (2 TON) REPLACING AHU-2 (2.5 TON) | | AHU-3 (3 TON) REPLACING AHU-4 (3.5 TON) | | AHU-7 (1.5 TON) REPLACING AHU-1 (2 TON) | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | CONTACT PATTY KRAUSS AT (561)805-6719. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
3 |
Status |
P |
Date |
2005-05-20 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2005-05-20 |
Time |
13:56 |
Rev Time |
0.40 |
Received By |
pkrauss |
Date |
2005-05-20 |
Time |
13:56 |
Sent To |
|
|
Notes |
2005-05-20 00:00:00 | SEE COMMMENTS ON PERMTI 04110183 |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
F |
Date |
2005-02-17 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2005-02-17 |
Time |
11:16 |
Rev Time |
0.20 |
Received By |
pkrauss |
Date |
2005-02-17 |
Time |
11:16 |
Sent To |
|
|
Notes |
2005-02-17 00:00:00 | DENIED:BUILDING #3 & 6 | | 1.AS PER CONVERSATION WITH JIM | | MULLENS, DRYER SUBMITTAL TO BE CHANGED | | AND THE PLANS WILL BE REVISED DELETING | | THE BOOSTER FANS INSTALLED IN THE DRYER | | EXHAUST DUCT.SPECIFIC DRYERS ARE TO BE | | INSTALLED BY FINAL INSPECTION. | | | | 2.PLAN SHEET M203 THE TRASH CHUTE ROOM | | DOES NOT INDICATE A CO SENSOR AS | | REQUIRED PER PREVIOUS REVIEW. | | | | 3.PLEASE NOTE, IN THE RESIDENTIAL | | UNITS AS WELL AS COMMON AREAS, SYSTEMS | | THAT HAVE A DESIGN CAPACITY TO PRODUCE | | GREATER THAN 2,000 CFM, DUCT SMOKE | | DETECTORS WILL BE REUQIRED IN THE SUPPLY | | AIR DUCT.AS AN ALTERNATE TO THE DUCT | | SMOKE DUCT DETECTOR, UPON ACTIVATION OF | | AN AREA SMOKE DETECTOR, THE A/C UNIT | | WILL SHUT DOWN.2001 FBC(M)606.2.1, | | 606.2.2, AND 606.4. | | | | 4.FAN SHUTDOWN SHALL HAVE NOTIFICATION | | PER 2001 FBC(M)606.4.1. | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | CONTACT PATTY KRAUSS AT (561)805-6719. | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2004-12-31 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2004-12-31 |
Time |
09:36 |
Rev Time |
0.30 |
Received By |
pkrauss |
Date |
2004-12-31 |
Time |
09:36 |
Sent To |
|
|
Notes |
2004-12-31 00:00:00 | SEE COMMENTS ON PERMIT 04110182 |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
7 |
Status |
F |
Date |
2006-06-19 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2006-06-19 |
Time |
11:13 |
Rev Time |
0.00 |
Received By |
kstevens |
Date |
2006-06-19 |
Time |
11:13 |
Sent To |
|
|
Notes |
2006-06-19 00:00:00 | DENIED | | REFERENCE: FBC-2001 PLUMBING | | FBC-2001 CHAPTER 1 | | | | REVISION DENIED. SHT P208 SHALL BE | | SUBMITTED FOR REVISION UNDER THE CORRECT | | PERMIT NUMBER ONLY. (04110183). | | | | REVIEW BY KEN STEVENS | | (561) 805-6721 | | FAX (561) 805-6731 | | E-MAIL [email protected] |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
6 |
Status |
F |
Date |
2006-06-16 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2006-06-16 |
Time |
20:00 |
Rev Time |
0.00 |
Received By |
kstevens |
Date |
2006-06-16 |
Time |
20:00 |
Sent To |
|
|
Notes |
2006-06-16 00:00:00 | DENIED | | REFERENCE: FBC-2001 PLUMBING | | FBC-2001 CHAPTER 1 | | | | 1. SHT P210 REV. 2 UNIT D6 NOT CLOUDED | | AT SAN/3. PLEASE CLOUD CHANGES | | | | 2. SHT P210 REV. 3 UNIT E6 NO CHANGE | | NOTED. PLEASE CLARIFY. SECTION 104.2.1. | | | | 3. SHT P210 REV. 3 UNIT F6 TUB NOT | | VENTED AT SAN/10. SECTION 901.2.1. | | | | 4. SHT P301 REV. 3 SAN/10 TUB NOT | | VENTED. SECTION 901.2.1. | | | | 5. SHT P301 RISER DIAGRAM SAN/1 CHANGED | | ON FLOOR PLAN UNIT F6 & K6 BUT NOT | | CHANGED ON RISER DIAGRAM. SAN/1 DID NOT | | CHANGE FOR UNIT D6, SO PLEASE INDICATE | | HOW REVISION FOR SAN/1 WILL BE DONE WITH | | TWO DIFFERENT FLOOR PLANS. SECTION | | 104.2.1. | | | | 6. SHTS P206, P208, & P211 SHALL BE | | SUBMITTED UNDER THE CORRECT PERMIT FOR | | THOSE SHEETS. | | | | REVIEW BY KEN STEVENS | | (561) 805-6721 | | FAX (561) 805-6731 | | E-MAIL [email protected] | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
5 |
Status |
F |
Date |
2005-12-23 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2005-12-23 |
Time |
09:21 |
Rev Time |
0.00 |
Received By |
kstevens |
Date |
2005-12-23 |
Time |
09:21 |
Sent To |
|
|
Notes |
2005-12-23 00:00:00 | REVISION DENIED | | REFERENCE: FBC-2001 PLUMBING | | FBC-2001 CHAPTER 1 | | | | 1. SHTS P201, P203, P206, P207, & P208 | | SHALL BE SUBMITTED FOR REVISION UNDER | | THE APPROPRIATE PERMIT NUMBER FOR THOSE | | SHEETS. SECTION 104.2.1. | | 2. SHTS P205 & 209 REVISION REQUIRED FOR | | THE ARCHITECTURAL SHEETS SHOWING THE | | DELETION OF THE SCUPPERS. SEE COMMENT #1 | | FROM LAST REVISION SUBMITTAL (6-23-5). | | 3. SHT P210 LEVEL 2-4. LEVEL 2 IS | | DIFFERENT THAN LEVELS 3 & 4. REVISE | | SEPARATELY. INDICATE UNIT DESIGNATION ON | | EACH SHEET. SECTION 104.2.1. | | - E6 OPP. REVISION REQUIRED FOR THE | | FLOOR PLAN. ONLY E6 FLOOR PLAN HAS BEEN | | REVISIED. IF FLOOR PLAN NOT REVISED, | | SUBMIT A RISER DIAGRAM TO REFLECT | | UNCHANGED FLOOR PLAN. SECTION 104.3.1.1. | | - G6 TUB NOT VENTED. WHAT RISER HAS BEEN | | REVISED TO REFLECT THIS CHANGE? | | - H6 INDICATE RISER NUMBER TO REFLECT | | CHANGE. | | - K6 2ND FLOOR INDICATE RISERS FOR | | THESE CHANGES. | | - F6 3RD & 4TH FLOORS | | 4. SHT P301 WHERE IS WATER HEATER DRAIN | | PAN - WASTE WATER DETAIL? HAVE THE WATER | | HEATERS BEEN DELETED? DETAIL TO BE SHOWN | | ON REVISION. | | - WHERE IS RISERS SAN/6 & SAN 9? THESE | | ARE STILL SHOWN ON THE FLOOR PLANS. | | - SAN/7 DOES NOT REFLECT THE FLOOR | | PLAN. | | - UNIT B-2 MASTER BATH SANT FITTINGS | | SHALL BE INSTALLED TO GUIDE SEWAGE AND | | WASTE IN THE DIRECTION OF FLOW. SECTION | | 706.3. | | - UNIT E-5/6 MASTER BATH, SHOW ALL PIPE | | SIZES. MAX 4FU ON 2" WET VENT. SECTION | | 104.2.1 AND TABLE 909.3. | | | | REVIEW BY KEN STEVENS | | (561) 805-6721 | | FAX (561) 653-2692 | | E-MAIL [email protected] | | | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
4 |
Status |
F |
Date |
2005-06-23 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2005-06-23 |
Time |
08:36 |
Rev Time |
1.00 |
Received By |
kstevens |
Date |
2005-06-22 |
Time |
18:52 |
Sent To |
|
|
Notes |
2005-06-23 00:00:00 | REVISION DENIED | | | | 1. SHTS P205 & P209 MORE INFORMATION IS | | REQUIRED FOR REVISION. ARE DOWNSPOUTS | | BEING DELETED? IF SO A REVISION WILL BE | | REQUIRED SHOWING THE DOWNSPOUTS BEING | | DELETED ON THE ARCHITECTURAL SHEETS. | | SECTION 104.2.1. | | 2. SHTS P205 & P209 REVISIONS 2 & 3 WERE | | NOT FOUND. LAST REVISION ON THE STAMPED | | ISSUED SET OF PLANS WAS REVISION 1. | | PLEASE CLOUD AND NUMBER ALL REVISIONS. | | SECTION 104.2.1. | | 3. SHT P207 INDICATE SQUARE FOOTAGE OF | | EACH DOWNSPOUT AND COMBINED SF FOR | | HORIZONTAL SITE STORM LINE WHERE THE 2 | | DOWNSPOUTS ARE NOW CONNECTING TOGETHER. | | ALSO SHOW PIPE SIZE FOR THE HORIZONTAL | | SIET STORM LINE. TABLE 1106.3 (THIS IS | | THE RISER DIAGRAM FOR SHT P209) | | | | REVIEW BY KEN STEVENS | | (561) 805-6721 | | FAX (561) 653-2692 | | E-MAIL [email protected] |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
P |
Date |
2005-05-14 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2005-05-14 |
Time |
18:42 |
Rev Time |
0.33 |
Received By |
kstevens |
Date |
2005-05-14 |
Time |
18:42 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
F |
Date |
2005-02-09 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2005-02-09 |
Time |
10:31 |
Rev Time |
0.50 |
Received By |
kstevens |
Date |
2005-02-09 |
Time |
10:31 |
Sent To |
|
|
Notes |
2005-02-09 00:00:00 | DENIED | | REFERENCE: FBC-2001 PLUMBING | | FLORIDA ADMINISTRATIVE CODE | | FLORIDA STATUTES | | | | A) FROM PREVIOUS REVIEW: | | 1) A TITLE BLOCK MUST CONTAIN THE | | FOLLOWING INFORMATION. | | 61G1-16.004(2)(6) | | THE FIRM LICENSE NUMBER, AND THE | | PRINTED | | NAME OF THE PERSON SEALING THE | | DOCUMENT. | | ALSO THE CERTIFICATE OF AUTHORIZATION | | OF | | THE FIRM. SEE SHEETS L1 THRU L6 AND | | SHEETS I-1 THRU I-3. | | **************NEW COMMENT************* | | 1B) SHT P202 BUILDING 1 STORM RISER | | DIAGRAM. MAXIMUM 730 SF @ 1% SLOPE. 4" | | PIPE REQUIRED ON THE HORIZONTAL PIPING | | OR INDICATE 4% SLOPE. INDICATE ON | | PLANS. | | TABLE 1106.3. | | 2B) SHT P202 SCUPPERS THRU THE MANSARD | | ROOF REQUIRES A MINIMUM OF 21.195 SQ IN | | 6" PIPE IS REQUIRED. TABLE 1106.3 AND | | SECTION 1107.3. | | 3B) SHT P204 MINIMUM 4" PIPE REQUIRED | | ON | | STORM RISER HORIZONTAL PIPING. TABLE | | 1106.3. | | 4B) SHT P204 MINIMUM 6" PIPE REQUIRED | | ON | | THE SCUPPER DRAINS. SECTION 1107.3 | | | | | | REVIEW BY KEN STEVENS | | (561) 805-6721 | | FAX (561) 653-2692 | | E-MAIL [email protected] |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2004-12-08 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2004-12-08 |
Time |
18:21 |
Rev Time |
0.25 |
Received By |
kstevens |
Date |
2004-12-08 |
Time |
18:21 |
Sent To |
|
|
Notes |
2004-12-08 00:00:00 | DENIED | | | | | | SEE COMMENTS FROM PERMIT #04110182 | | | | | | | | REVIEW BY KEN STEVENS | | (561) 805-6721 | | FAX (561) 653-2692 | | E-MAIL [email protected] |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2005-05-24 |
|
|
Cont ID |
|
Sent By |
mmclean |
Date |
2005-05-13 |
Time |
12:31 |
Rev Time |
0.00 |
Received By |
mmclean |
Date |
2005-05-13 |
Time |
12:31 |
Sent To |
|
|
Notes |
2005-05-24 00:00:00 | APPROVED BY GRACE JOYCE, PLANNER | | 822-1435 |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2005-01-20 |
|
|
Cont ID |
|
Sent By |
mmclean |
Date |
2005-01-20 |
Time |
15:16 |
Rev Time |
0.00 |
Received By |
mmclean |
Date |
2005-01-20 |
Time |
15:16 |
Sent To |
|
|
Notes |
2005-01-20 00:00:00 | DENIED, MUST APPLY FOR A MINOR AMENDMENT | | FOR CHANGES MADE TO PLANS.MAY RECEIVE | | APPLICATION 1/24/05. | | | | CALL GRACE JOYCE,PLANNER IF YOU HAVE ANY | | QUESTIONS, AT 822-1447. |
|
|