Plan Review Details - Permit 04070067
Plan Review Stops For Permit 04070067
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2004-08-02 Cont ID  
Sent By alange Date 2004-08-02 Time 10:20 Rev Time 1.00
Received By alange Date 2004-08-02 Time 10:20 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2004-07-13 Cont ID  
Sent By jleech Date 2004-07-31 Time 13:08 Rev Time 1.66
Received By alange Date 2004-07-13 Time 16:18 Sent To  
Notes
2004-07-13 00:00:00DENIED
  
 1. THE NOTICE OF COMMENCEMENT SHALL BE
 RECORDED AT PALM BEACH COUNTY
 COURTHOUSEAND A COPY SUBMITTED TO THIS
 OFFICE
 BEFORE A PERMIT CAN BE ISSUED.BLANK
 FORMS ARE AVAILABLE FROM THIS OFFICE.
  
 2.SUBMIT 2 COPIES OD ENERGY CLCS.
  
 3.PROVIDE TWO COPIES OF PRODUCT
 APPROVALS FOR SIMPSON FASTENERS.
 PRODUCT APPROVALS SUBMITTED WITH
 PERMIT APPLICATION AFTER OCTOBER 1, 2003
 ARE REQUIRED TO COMPLY WITH THE FLORIDA
 PRODUCT APPROVAL SYSTEM. FOR INFORMATION
 PLEASE SEE THE STATE WEBSITE AT
 WWW.FLORIDABUILDING.ORG. PRODUCTS WITH
 STATEWIDE APPROVAL ARE REQUIRED TO BE
 SUBMITTED WITH A COVER SHEET THAT LISTS
 THE PRODUCT IDENTITY NUMBER FROM THE
 STATE. IF THE PRODUCT DOES NOT HAVE
 STATEWIDE APPROVAL, SUBMIT AN APPLICA-
 TION FOR LOCAL PRODUCT APPROVAL OR SITE
 SPECIFIC FORM PER RULE 9B-72. SEE
 ATTACHMENT. WWW.FLORIDABUILDING.ORG
  
 4.FBC2405.2.1 SAFTEY GLAZING
 IS REQUIRED AT TUB LOCATION.
  
 ANY QUESTIONS CALL ME
  
 ART LANGE
 BUILDING PLANS EXAMINER
 805-6672

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2005-06-10 Cont ID  
Sent By btrobaug Date 2005-06-10 Time 07:46 Rev Time 0.50
Received By btrobaug Date 2005-06-10 Time 07:39 Sent To PC
Notes
2005-06-10 00:00:00 
 ALL REVISIONS MUST BE MADE BY THE
 DESIGNER OF RECORD. 104.2.1 FBC. PLEASE
 HAVE JOHN AVERKAMP MAKE THE NECESSARY
 CHANGES AND RESUBMIT FOR REVIEW.
  
 IF THERE ARE ANY QUESTIONS PLEASE CALL.
  
 BILL TROBAUGH
 ELECTRICAL PLAN REVIEW
 561/805-6718
 [email protected]
 FAX/:561/659-8026
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2004-07-06 Cont ID  
Sent By csiegber Date 2004-07-06 Time 08:00 Rev Time 0.50
Received By btrobaug Date 2004-07-06 Time 12:19 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2004-07-22 Cont ID  
Sent By csiegber Date 2004-07-22 Time 09:43 Rev Time 0.00
Received By csiegber Date 2004-07-22 Time 09:43 Sent To P
Notes
2004-07-22 00:00:00TO KS BOX/RESUB
 JOHN LEECH REVIEWED

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2004-07-16 Cont ID  
Sent By mmclean Date 2004-07-21 Time 15:34 Rev Time 0.00
Received By csiegber Date 2004-07-16 Time 10:26 Sent To Z
Notes
2004-07-16 00:00:00TO MM BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2004-07-06 Cont ID  
Sent By csiegber Date 2004-07-06 Time 08:00 Rev Time 0.00
Received By csiegber Date 2004-07-06 Time 08:00 Sent To E
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2004-07-01 Cont ID  
Sent By mmclean Date 2004-07-02 Time 16:48 Rev Time 0.00
Received By csiegber Date 2004-07-01 Time 16:18 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2004-07-13 Cont ID  
Sent By jleech Date 2004-07-10 Time 14:11 Rev Time 0.10
Received By pkrauss Date 2004-07-13 Time 10:13 Sent To  
Notes
2004-07-13 00:00:00NO MECHANICAL WORK OR CONTRACTOR
 INDICATED ON THE PERMIT APPLICATION.
 PLEASE PROVIDE PLANS, ENERGY & MANUAL J
 CALCS, AND EQUIPMENT SCHEDULE WITH
 MECHANICAL PERMIT APPLICATION.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT (561) 805-6719.

Review Stop P PLUMBING
Rev No 2 Status P Date 2004-07-31 Cont ID  
Sent By jleech Date 2004-07-31 Time 13:08 Rev Time 0.25
Received By jleech Date 2004-07-31 Time 13:08 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2004-07-10 Cont ID  
Sent By csiegber Date 2004-07-22 Time 09:43 Rev Time 0.50
Received By jleech Date 2004-07-10 Time 14:10 Sent To M
Notes
2004-07-10 00:00:00DENIED;
 1.PLANS TO BE SIGNED AND SEALED PER FL.
 STAT. 484.221.
 2.W/M TO DISCHARGE DOWN STREAM OF BATH-
 ROOM . SEE SEC 909.1 IN THE PLUMBING
 CODE.
 PLUMBING PLAN REVIEW BY;
 JOHN LEECH
 805-6695

Review Stop Z ZONING
Rev No 3 Status P Date 2004-07-21 Cont ID  
Sent By mmclean Date 2004-07-21 Time 15:34 Rev Time 0.00
Received By mmclean Date 2004-07-21 Time 15:34 Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status F Date 2004-07-20 Cont ID  
Sent By mmclean Date 2004-07-20 Time 16:46 Rev Time 0.00
Received By mmclean Date 2004-07-20 Time 16:46 Sent To  
Notes
2004-07-20 00:00:00NEED TO PROVIDE SETBACKS FOR ADDITION
 ON SURVEY.CALLED CONTR

Review Stop Z ZONING
Rev No 1 Status F Date 2004-07-02 Cont ID  
Sent By csiegber Date 2004-07-16 Time 10:26 Rev Time 0.00
Received By mmclean Date 2004-07-02 Time 16:48 Sent To I
Notes
2004-07-02 00:00:00DENIED, NEED TO PROVIDE 2 COPY OF SURVEY
 SHOWING THE WORK.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved