Plan Review Stops For Permit 04050095 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2004-06-21 |
|
|
Cont ID |
|
Sent By |
lsmith |
Date |
2004-06-21 |
Time |
16:29 |
Rev Time |
1.00 |
Received By |
lsmith |
Date |
2004-06-21 |
Time |
16:29 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2004-06-02 |
|
|
Cont ID |
|
Sent By |
pschmitz |
Date |
2004-06-21 |
Time |
16:10 |
Rev Time |
0.00 |
Received By |
lsmith |
Date |
2004-06-02 |
Time |
15:12 |
Sent To |
|
|
Notes |
2004-06-02 00:00:00 | BUILDING PLAN REVIEW FAILED: | | | | | | | | 1.PRODUCT APPROVALS SUBMITTED WITH | | PERMIT APPLICATION AFTER OCTOBER 1, | | 2003ARE REQUIRED TO COMPLY WITH THE | | FLORIDA PRODUCT APPROVAL SYSTEM. FOR | | INFORMATIONPLEASE SEE THE STATE WEBSITE | | AT | | WWW.FLORIDABUILDING.ORG. PRODUCTS WITH | | STATEWIDE APPROVAL ARE REQUIRED TO BE | | SUBMITTED WITH A COVER SHEET THAT LISTS | | THE PRODUCT IDENTITY NUMBER FROM THE | | STATE. IF THE PRODUCT DOES NOT HAVE | | STATEWIDE APPROVAL, SUBMIT AN APPLICA- | | TION FOR LOCAL PRODUCT APPROVAL OR SITE | | SPECIFIC FORM PER RULE 9B-72. SEE | | ATTACHMENT. WWW.FLORIDABUILDING.ORG | | A. STORM PANELS: WILL INSTALLATION | | SCHEDULE SHOWING METHOD OF ATTACHMENT. | | B. STRUCTURAL COMPONENTS (SEE ATTACHED | | SAMPLE) | | C. ROOF TILE & COMPONENTS. | | | | 2. NO SUBCONTRACTORS HAVE SIGNED ON TO | | THE PERMIT APPLICATION. MECHANICAL, | | PLUMBING & ELECTRICAL WILL HAVE TO PULL | | SEPARATE PERMITS. | | | | 3. THE POOL, DECK & SCREEN ENCLOSURE ARE | | NOT INCLUDED IN THIS PERMIT. | | | | | | ANY QUESTIONS PLEASE CALL: | | LEA SMITH, BUILDING PLANS EXAMINER | | 805-6713 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
5 |
Status |
P |
Date |
2005-04-12 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2005-04-12 |
Time |
17:23 |
Rev Time |
0.30 |
Received By |
dpalmer |
Date |
2005-04-12 |
Time |
17:23 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
4 |
Status |
F |
Date |
2005-03-30 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2005-03-30 |
Time |
18:48 |
Rev Time |
0.75 |
Received By |
dpalmer |
Date |
2005-03-30 |
Time |
18:48 |
Sent To |
|
|
Notes |
2005-03-30 00:00:00 | ************* UNSAT 2ND REVIEW ****** | | | | | | PLEASE SEE SOME COMMENTS FROM PREVIOUS | | REVIEW AND PLEASE SEE NEW COMMENTS DUE | | TO COMPLETE CHANGE IN RISER DIAGRAM AND | | PANEL SCHEDULES. | | | | 1)NOTE: PLEASE CORRELATEOCP /LOAD ETC | | FOR AHU'S. PLEASE SEE LOAD CALCULATIONS | | INDICATES A TOTAL OF 19KW, HOWEVER PANEL | | SCHEDULES INDICATE A TOTAL OF 13KW | | | | 2)NOTE: PLEASE SEE 220.31B FOR LOAD | | CALCULATIONS FOR EXISTING DWELLINGS. | | PLEASE SEE THE LOAD CALCULATIONS HAVE | | NOT BEEN CORRECTED. | | | | 3)NOTE: PLEASE CORRELATE LOADS AND OCP | | SHOWN ON PANELS. | | PLEASE SEE MANY 1P20A CIRCUITS WITH LOAD | | EXCEEDING RATING OF CIRCUIT. A MAX OF | | 1920VA ON 20A 1440VA ON 15A. | | PLEASE ALSO CORRELATE LOAD SHOWN FOR | | SUB-PANEL WITH LOAD ON PANEL "A". | | 215.5 | | | | | | 4)NOTE: PLEASE CLARIFY LOCATION OF NEW | | 125A DISC. IT IS NOTED FOR THIS NEW | | MAIN TO BE GARAGE. IS THIS GROUPED WITH | | EXISTING MCB PANEL? 230.72 | | PLEASE SEE THIS HAS NOT BEEN ADDRESSED | | OR CLARIFIED. | | | | 5)NOTE: PLEASE SEE 1/0'S ARE SHOWN FOR | | FEED TO 200A MCB PANEL. | | PLEASE SEE 310.16, 310.15B6, 240.4 | | | | 6)NOTE: PLEASE SEE EQUIPMENT GROUNDING | | CONDUCTOR WHICH IS SHOWN FROM METER TO | | 125A MAIN DISCONNECT. PLEASE SEE | | 250.6,250.24, THIS EQUIPMENT GROUNDING | | IS ONLY INSTALLED AFTER THE FIRST MEANS | | OF DISC. | | | | 7)NOTE: PLEASE VERIFY IF LOADS SHOWN ON | | POOL PANEL FOR CONTINUOUS LOADS ARE AT | | 125% MIN. | | 215.3.230.42 ETC . | | | | 8)NOTE: PLEASE SEE RANGE SHOWN AS 8KW | | AND DEMAND AT 1200VA? PLEASE ALSO SEE | | LOAD CALCS SHOWS 12KW?? | | | | 9)NOTE: PLEASE SEE PANEL SCHEDULE | | INDICATES ARC FAULT FOR RECEPTS. | | PLEASE SEE 2002 210.12, WHICH IS NOT | | ONLY FOR RECEPTS. | | | | | | PLEASE SEE ONE SET OF THESE PLANS HAVE | | BEEN REDLINED FOR ABOVE AREAS OF NOTES. | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | REVIEW. IF THERE ARE ANY QUESTIONS, | | PLEASE CALL. | | | | DEWEY PALMER | | 805-6717 | | [email protected] | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
F |
Date |
2005-01-31 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2005-01-31 |
Time |
11:10 |
Rev Time |
0.75 |
Received By |
dpalmer |
Date |
2005-01-31 |
Time |
11:10 |
Sent To |
|
|
Notes |
2005-01-31 00:00:00 | ************* UNSAT ************ | | | | | | PLEASE SEE PREVIOUS REDLINED ITEMS. | | PLEASE ALSO SEE NEW COMMENTS DUE TO | | COMPLETE REVISION OF SERVICE . | | | | | | 1)NOTE: PLEASE SEE 424.3B FOR MIN OCP | | FOR AHU'S. PLEASE ALSO SEE 2KW LOAD | | SHOWN ON A 15A CIRCUIT. | | MIN OCP 125%. | | | | 2)NOTE: PLEASE SEE 220.31B FOR LOAD | | CALCULATIONS FOR EXISTING DWELLINGS. | | | | 3)NOTE: PLEASE CORRELATE LOADS AND OCP | | SHOWN ON PANELS. | | | | 4)NOTE: PLEASE LABEL PANELS AND RISER | | FOR EACH PANEL. | | | | 5)NOTE: PLEASE CLARIFY LOCATION OF NEW | | 125A DISC. IT IS NOTED FOR THIS NEW | | MAIN | | TO BE GARAGE. IS THIS GROUPED WITH | | EXISTING MCB PANEL? 230.72 | | | | 6)NOTE: PLEASE SEE PANEL INDICATES A | | 2-P25ABRKR FOR NEW SUB-PANEL, YET SUB | | PANELS INDICATES LOAD ABOVE 25A'S. | | | | 7)NOTE: PLEASE VERIFY IF LOADS SHOWN ON | | POOL PANEL FOR CONTINUOUS LOADS ARE AT | | 125% MIN. | | 215.3.230.42 ETC . | | | | PLEASE SEE ONE SET OF THESE PLANS HAVE | | BEEN REDLINED FOR ABOVE AREAS OF | | CONCERN. | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | REVIEW. IF THERE ARE ANY QUESTIONS, | | PLEASE CALL. | | | | DEWEY PALMER | | 805-6717 | | [email protected] | | | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2004-06-14 |
|
|
Cont ID |
|
Sent By |
pschmitz |
Date |
2004-06-21 |
Time |
16:09 |
Rev Time |
0.33 |
Received By |
dpalmer |
Date |
2004-06-14 |
Time |
10:18 |
Sent To |
P |
|
Notes |
2004-06-14 00:00:00 | *** NOTE REDLINED **** | | | | OCP FOR AHU, MIN 125% PER 424.3B MIN 30A | | | | ALL EXISTIN TO MEET FBC 34 SD'S AND GFI' | | S. | | | | SEC'S PER 310.16,240.4, 310.15B6, SHOWN | | AS 1/0'S |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2004-05-08 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-06-10 |
Time |
16:06 |
Rev Time |
0.50 |
Received By |
dpalmer |
Date |
2004-05-08 |
Time |
10:16 |
Sent To |
P |
|
Notes |
2004-05-08 00:00:00 | ************** UNSAT ****************** | | | | 1)NOTE: PLEASE SUBMIT LOAD CALCULATIONS | | FOR NEW AND EXSITING LOADS FOR PANEL/ | | SERVICE. 220/215.5 | | PLEASE SEE 220.3B4. | | PLEASE SHOW ALL RECESSED LTS BASED ON | | MAX WATTAGE FOR FIXTURE(S). THIS MAY NOT | | BE FIGURED IN W/ 3W/PER SQ FT. | | PLEASE PROVIDE FIXTURE INFORMATION ON | | LEGEND. | | | | 2)NOTE: PLEASE SEE RISER DIAGRAM FOR | | SIZE OF CONDUCTORS SHOWN FOR NEW SUB | | PANEL. (MISPRINT) SHOWS 6/0'S AND 10/0'S | | FOR 60A PANEL. | | | | 3)NOTE: PLEASE SHOW GROUNDING SYSTEM AT | | DETACHED BLDG PER 250.32, NEW FOOTER, | | CWP (IF METALLIC). | | | | 4)NOTE: PLEASE INDICATE MEANS OF DISC | | AT DETACHED BLDG. IS THIS GOING TO BE | | A MCB IN NEW SUB PANEL. | | | | 5)NOTE: PLEASE SEE MISSING SD'S INSIDE | | STUDY/ ADAPTABLE SLEEPING RM PER NFPA-72 | | 8-1. | | PLEASE ALSO NOTE, THESE WILL BE REQ'D | | TO BE TIED INTO EXISTING/ NEW SD'S. | | | | 6)NOTE: PLEASE SEE FBC CHAPTER 34, | | 3401.7.2.6 VALUE EXCEEDING 50% OF EXSIT | | PLEASE PROVIDE LAYOUT OF EXISTING RES | | MEETING 2002 NEC. IF EXIST MEETS 2002 | | NEC, PLEASE SHOW AS. GFI/ARC FAULT, MIN | | CIRCUITS, SD'S ETC. | | | | 7)NOTE:P PLEASE SEE PLANS, NEXT TO NEW | | ADDITION, SHOWS NEW A/C UNIT, HOWEVER | | NEW CABANA ALSO SHOWS A/C UNITS, ARE | | THESE NEW OR EXSITING? | | PLEASE VERIFY IF NEW A/C FOR ADDITION | | IS FED FROM WHAT APPEARS TO BE NEW | | CABANA PANEL? | | | | PLEASE ALSO VERIFY OCP SHOWN FOR 5KW | | HEAT IN AHU. SHOWS 40A OCP. MIN. IS | | 125% PER 424.3B , PLEASE VERIFY MAX. | | | | 8) NOTE: PLEASE LIST ALL THE REQ'D | | DEDICATED BATH(S) CIRCUIT(S) ON PANEL | | SCHEDULE. PER 210.52D, 210.11C3 | | | | 9)NOTE: PLEASE SEE NOTE UNDER RISER | | MENTIONS TO USE EXISTING CIRCUITS FOR | | NEW??? | | | | 10)NOTE: PLEASE SHOW LOCATION OF NEW | | PANEL. | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | REVIEW. IF THERE ARE ANY QUESTIONS, | | PLEASE DO NOT HESITATE TO CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | CITY OF WEST PALM BEACH | | CONSTUCTION SERVICES DEPT. | | 561-805-6717 | | [email protected] | | 11)NOTE: PLEASE VERIFY IF NEW |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
6 |
Status |
N |
Date |
2005-04-06 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-04-06 |
Time |
13:43 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-04-06 |
Time |
13:43 |
Sent To |
E |
|
Notes |
2005-04-06 00:00:00 | TO "DPALMER" DESK/REVISION |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
2005-03-25 |
|
|
Cont ID |
|
Sent By |
adarroug |
Date |
2005-03-25 |
Time |
11:04 |
Rev Time |
0.00 |
Received By |
adarroug |
Date |
2005-03-25 |
Time |
11:04 |
Sent To |
E |
|
Notes |
2005-03-25 00:00:00 | TO "DPALMER" DESK/REVISION |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2005-01-24 |
|
|
Cont ID |
|
Sent By |
mjacobs |
Date |
2005-01-24 |
Time |
14:08 |
Rev Time |
0.00 |
Received By |
mjacobs |
Date |
2005-01-24 |
Time |
14:08 |
Sent To |
E |
|
Notes |
2005-01-24 00:00:00 | TO "DP" DESK/REV. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2004-06-10 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-06-10 |
Time |
16:06 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-06-10 |
Time |
16:06 |
Sent To |
E |
|
Notes |
2004-06-10 00:00:00 | TO DP DESK/RESUB |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2004-05-06 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-05-06 |
Time |
08:14 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-05-06 |
Time |
08:14 |
Sent To |
E |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2004-05-04 |
|
|
Cont ID |
|
Sent By |
mmclean |
Date |
2004-05-05 |
Time |
16:05 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-05-04 |
Time |
15:21 |
Sent To |
Z |
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
N |
Date |
2004-05-25 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2004-05-24 |
Time |
13:18 |
Rev Time |
0.25 |
Received By |
pkrauss |
Date |
2004-05-25 |
Time |
08:03 |
Sent To |
B |
|
Notes |
2004-05-25 00:00:00 | NO MECHANICAL CONTRACTOR INDICATED ON | | THE PERMIT APPLICATION.ENERGY AND | | MANUAL J CALCS SUBMITTED.PLEASE | | PROVIDE PLANS AND EQUIPMENT SCHEDULE | | WITH MECHANICAL PERMIT APPLICATION. | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | CONTACT PATTY KRAUSS AT (561) 805-6719. |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2004-06-21 |
|
|
Cont ID |
|
Sent By |
pschmitz |
Date |
2004-06-21 |
Time |
16:09 |
Rev Time |
1.00 |
Received By |
pschmitz |
Date |
|
Time |
|
Sent To |
B |
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
N |
Date |
2004-05-24 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2004-06-14 |
Time |
10:18 |
Rev Time |
0.00 |
Received By |
kstevens |
Date |
2004-05-24 |
Time |
13:18 |
Sent To |
M |
|
Notes |
2004-05-24 00:00:00 | NO PLUMBING PLANS SUBMITTED. PLUMBING | | PERMIT REQUIRED. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2004-05-05 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-05-04 |
Time |
15:21 |
Rev Time |
0.00 |
Received By |
mmclean |
Date |
2004-05-05 |
Time |
16:04 |
Sent To |
I |
|
Notes |
2004-05-05 00:00:00 | MUST PULL SEPARATE PERMIT FOR POOL MM |
|
|