Plan Review Details - Permit 04041693
Plan Review Stops For Permit 04041693
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2004-07-21 Cont ID  
Sent By jgomez Date 2004-07-21 Time 16:47 Rev Time 0.50
Received By jgomez Date 2004-07-21 Time 16:47 Sent To PC
Notes
2004-07-21 00:00:001-PROVIDE INFORMATION REQUESTED ON
 PROVISO DATED 5-20-04. SEE ATTACHED
 COPY.
 2-FLOOD ZONE REVISION IS OK.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ AT 805-6712.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2004-05-20 Cont ID  
Sent By mmclean Date 2004-07-21 Time 16:38 Rev Time 1.00
Received By jgomez Date 2004-05-20 Time 10:32 Sent To PC
Notes
2004-05-20 00:00:00BUILDING REVIEW PROVISO:
 1-KEY PLAN ON SURVEY IDENTIFIES LOT 89
 INSTEAD OF LOT 90. REVISE AS REQUIRED.
 2-PROVIDE COPIES OF GARAGE DOORS DWGS
 SUBMITTED FOR SBCCI APPROVAL. NEED
 DWGS WITH ENGINEER'S SEAL AND DATE AS
 SHOWN ON SBCCI REPORT.
 3-FLOOD ZONE AO: NEED TO PROVIDE THE
 ELEVATION CERTIFICATE.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2004-05-06 Cont ID  
Sent By dpalmer Date 2004-05-06 Time 06:39 Rev Time 0.25
Received By dpalmer Date 2004-05-06 Time 06:39 Sent To M
Notes
2004-05-06 00:00:00************NOTES/PROVISO ***********
  
 1)NOTE> MIN LOAD FOR RANGE TO BE 8KW,
 220.19.
  
 2)NOTE: MAX LOAD ON 1P20A CIRCUIT IS
 1.9 KW. WASHERAND IRRG PUMP SHOWN AS
 2KW.
  
 SD'S INSTALLED PER NFPA-72 8-1.4.2
  
 REVISE PLANS BEFORE ROUGH.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2004-06-22 Cont ID  
Sent By csiegber Date 2004-06-22 Time 14:33 Rev Time 0.00
Received By csiegber Date 2004-06-22 Time 14:33 Sent To B
Notes
2004-06-22 00:00:00TO JG DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2004-05-20 Cont ID  
Sent By mmclean Date 2004-04-28 Time 13:19 Rev Time 0.00
Received By jgomez Date 2004-04-26 Time 13:29 Sent To PC
Notes
2004-04-29 00:00:00TO SFD RACK/E
2004-04-26 00:00:00TO Z

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2004-05-10 Cont ID  
Sent By dpalmer Date 2004-05-06 Time 06:41 Rev Time 0.30
Received By pkrauss Date 2004-05-10 Time 16:46 Sent To P
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2004-05-19 Cont ID  
Sent By pkrauss Date 2004-05-10 Time 16:46 Rev Time 0.33
Received By kstevens Date 2004-05-19 Time 09:38 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2004-07-21 Cont ID  
Sent By mmclean Date 2004-07-21 Time 16:38 Rev Time 0.00
Received By mmclean Date 2004-07-21 Time 16:38 Sent To B
Notes
2004-07-21 00:00:00APPROVED REVISION

Review Stop Z ZONING
Rev No 1 Status P Date 2004-04-28 Cont ID  
Sent By mmclean Date 2004-04-28 Time 13:19 Rev Time 0.00
Received By mmclean Date 2004-04-28 Time 13:19 Sent To I
Notes
***NONE***