Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2004-10-12 Cont ID  
Sent By jgomez Date 2004-10-12 Time 17:50 Rev Time 0.33
Received By jgomez Date 2004-10-12 Time 17:50 Sent To PC
Notes
2004-10-12 00:00:00GARAGE DOOR PRODUCT APPROVAL.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2004-07-16 Cont ID  
Sent By csiegber Date 2004-08-30 Time 10:05 Rev Time 0.33
Received By jgomez Date 2004-07-16 Time 16:04 Sent To PC
Notes
2004-07-16 00:00:001-PROVIDE COPIES OF GARAGE DOOR DRAWINGS
 SUBMITTED TO SBCCI FOR APPROVAL. NEED
 DRAWINGS SIGNED AND SEALED ON DATE
 NOTED ON SBCCI EVALUATION REPORT.
  
 2-FLOOD ZONE REVISION IS OK.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ AT 805-6712.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2004-05-19 Cont ID  
Sent By csiegber Date 2004-06-22 Time 14:34 Rev Time 1.00
Received By jgomez Date 2004-05-19 Time 09:25 Sent To PC
Notes
2004-05-19 00:00:00BUILDING REVIEW PROVISO:
 1-SUBMIT COPY OF THE DRAWINGS THAT WERE
 SUBMITTED TO SBCCI FOR APPROVAL.
 DRAWINGS SUBMITTED DON'T HAVE THE SAME
 DATE THAT ENGINEER SIGNED AND SEALED
 PLANS AS SPECIFIED ON SBCCI REPORT.
 2-FLOOD ZONE AO: NEED TO PROVIDE THE
 ELEVATION CERTIFICATE.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2004-05-06 Cont ID  
Sent By dpalmer Date 2004-05-06 Time 06:00 Rev Time 0.25
Received By dpalmer Date 2004-05-06 Time 06:00 Sent To M
Notes
2004-05-06 00:00:00****** REDLINED / PROVISO *********
  
 REVISE PLANS BEFORE ROUGH.
  
 1)NOTE: PLEASE SEE MAX LOAD FOR 1P20A
 CIRCUIT IS 1.9 KW. IRRG PUMP, WASHER
 ARE BOTH SHOWN AT 2KW.
  
 2)NOTE: PLEASE SEE MIN LOAD FOR RANGE
 IS 8KW, 220.19
  
 SD'S TO BE INSTALLED PER NFPA-72 8-1.4.2
  
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 CONSTUCTION SERVICES DEPT.
 561-805-6717
 [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2004-08-30 Cont ID  
Sent By csiegber Date 2004-08-30 Time 10:05 Rev Time 0.00
Received By csiegber Date 2004-08-30 Time 10:05 Sent To B
Notes
2004-08-30 00:00:00TO JG DESK/SUBMITTALS/NEW PA'S

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2004-06-22 Cont ID  
Sent By csiegber Date 2004-06-22 Time 14:34 Rev Time 0.00
Received By csiegber Date 2004-06-22 Time 14:34 Sent To B
Notes
2004-06-22 00:00:00TO JG DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2004-05-19 Cont ID  
Sent By mmclean Date 2004-04-28 Time 12:38 Rev Time 0.00
Received By jgomez Date 2004-04-26 Time 13:32 Sent To PC
Notes
2004-04-29 00:00:00TO SFD RACK/E
2004-04-26 00:00:00TO Z

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2004-05-10 Cont ID  
Sent By dpalmer Date 2004-05-06 Time 06:00 Rev Time 0.30
Received By pkrauss Date 2004-05-10 Time 16:42 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2004-05-18 Cont ID  
Sent By kstevens Date 2004-05-18 Time 18:31 Rev Time 0.33
Received By kstevens Date 2004-05-18 Time 18:31 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2004-04-28 Cont ID  
Sent By mmclean Date 2004-04-28 Time 12:38 Rev Time 0.00
Received By mmclean Date 2004-04-28 Time 12:38 Sent To I
Notes
***NONE***