Plan Review Stops For Permit 04041665
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2004-10-13 Cont ID  
Sent By jgomez Date 2004-10-13 Time 15:39 Rev Time 0.33
Received By jgomez Date 2004-10-13 Time 15:39 Sent To PC
Notes
2004-10-13 00:00:00GARAGE DOOR PRODUCT APPROVAL.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2004-07-19 Cont ID  
Sent By csiegber Date 2004-08-30 Time 10:09 Rev Time 0.33
Received By jgomez Date 2004-07-19 Time 11:47 Sent To PC
Notes
2004-07-19 00:00:001-PROVIDE COPIES OF GARAGE DOOR DRAWINGS
 SUBMITTED TO SBCCI FOR APPROVAL. NEED
 DRAWINGS SIGNED AND SEALED ON DATE
 NOTED ON SBCCI EVALUATION REPORT.
 2-FLOOD ZONE REVISION IS OK.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ AT 805-6712.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2004-05-17 Cont ID  
Sent By csiegber Date 2004-06-22 Time 14:32 Rev Time 1.00
Received By jgomez Date 2004-05-17 Time 11:33 Sent To PC
Notes
2004-05-17 00:00:00BUILDING REVIEW PROVISO:
 1-SUBMIT DRAWINGS FOR GARAGE DOORS THAT
 MATCH THOSE DRAWINGS SUBMITTED TO
 SBCCI. NEED DRAWINGS THAT WERE SEALED
 ON DATE SPECIFIED ON SBCCI REPORT.
 2-FLOOD ZONE AO: NEED TO PROVIDE THE
 ELEVATION CERTIFICATE.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2004-05-03 Cont ID  
Sent By dpalmer Date 2004-05-03 Time 18:49 Rev Time 0.25
Received By dpalmer Date 2004-05-03 Time 18:49 Sent To M
Notes
2004-05-03 00:00:00***** REDLINED / PROVISO *********
  
 1)NOTE: PLEASE SEE 220.19 FOR A MIN OF
 8KW TO BE FIGURED FOR LOAD CALCS.
  
 2)NOTE: MAX LOADS ON 1-POLE 20A CIRCUITS
 IS 1.9 KW. IRRG PUMP AND WASHER SHOWN
 AT 2KW.
  
 SD'S TO BE INSTALLED PER NFPA-72 8-1.4.2
  
 REVISE PLANS BEFORE ROUGH.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 CONSTUCTION SERVICES DEPT.
 561-805-6717
 [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2004-08-30 Cont ID  
Sent By csiegber Date 2004-08-30 Time 10:09 Rev Time 0.00
Received By csiegber Date 2004-08-30 Time 10:09 Sent To B
Notes
2004-08-30 00:00:00TO JG DESK/SUBMITTALS/NEW PA'S

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2004-06-22 Cont ID  
Sent By csiegber Date 2004-06-22 Time 14:32 Rev Time 0.00
Received By csiegber Date 2004-06-22 Time 14:32 Sent To B
Notes
2004-06-22 00:00:00TO JG DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2004-05-17 Cont ID  
Sent By mmclean Date 2004-04-29 Time 12:09 Rev Time 0.00
Received By jgomez Date 2004-04-26 Time 11:20 Sent To PC
Notes
2004-04-30 00:00:00TO SFD RACK/E
2004-04-26 00:00:00TO Z

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2004-05-07 Cont ID  
Sent By dpalmer Date 2004-05-03 Time 18:49 Rev Time 0.30
Received By pkrauss Date 2004-05-07 Time 08:44 Sent To P
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2004-05-08 Cont ID  
Sent By pkrauss Date 2004-05-07 Time 08:44 Rev Time 0.25
Received By jleech Date 2004-05-08 Time 09:57 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2004-04-29 Cont ID  
Sent By mmclean Date 2004-04-29 Time 12:09 Rev Time 0.00
Received By mmclean Date 2004-04-29 Time 12:09 Sent To I
Notes
***NONE***