Plan Review Details - Permit 04041648
Plan Review Stops For Permit 04041648
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2004-10-14 Cont ID  
Sent By jgomez Date 2004-10-14 Time 07:54 Rev Time 0.33
Received By jgomez Date 2004-10-14 Time 07:54 Sent To PC
Notes
2004-10-14 00:00:00GARAGE DOOR PRODUCT APPROVAL.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2004-07-20 Cont ID  
Sent By csiegber Date 2004-08-30 Time 10:02 Rev Time 0.33
Received By jgomez Date 2004-07-20 Time 09:46 Sent To PC
Notes
2004-07-20 00:00:001-PROVIDE COPIES OF GARAGE DOOR DRAWINGS
 SUBMITTED TO SBCCI FOR APPROVAL. NEED
 DRAWINGS SIGNED AND SEALED ON DATE
 NOTED ON SBCCI EVALAUTION REPORT.
 2-FLOOD ZONE REVISION IS OK.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ AT 805-6712.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2004-05-13 Cont ID  
Sent By csiegber Date 2004-06-22 Time 14:38 Rev Time 1.00
Received By jgomez Date 2004-05-13 Time 17:09 Sent To PC
Notes
2004-05-13 00:00:00BUILDING REVIEW PROVISO:
 1-GARAGE DOORS: DWGS SUBMITTED DON'T
 MATCH DWGS SUBMITTED TO SBCCI FOR
 EVALUATION APPROVAL. RESUBMIT MATCHING
 DWGS. SEE DATE DRAWINGS WERE SIGNED &
 SEALED BY ENGINEER OF RECORD.
 2-FLOOD ZONE AO: NEED TO PROVIDE THE
 ELEVATION CERTIFICATE.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2004-05-03 Cont ID  
Sent By dpalmer Date 2004-05-03 Time 07:28 Rev Time 0.25
Received By dpalmer Date 2004-05-03 Time 07:28 Sent To M
Notes
2004-05-03 00:00:00******** REDLINED/ PROVISO*******
  
 REVISE PLANS BEFORE ROUGH.
  
 1)NOTE: PLEASE SEE MIN LOAD FIGURED FOR
 RANGE TO BE 8KW PER 220.19. SHOWN AS
 7.5KW
  
 2)NOTE: MAX LOAD FOR 1-P 20A CIRCUITS
 1.9KW,80% IRRG PUMP,WASHER ARE SHOWN AS
 2KW
  
 SD'S PER NFPA-72 8-1.4.2
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 CONSTUCTION SERVICES DEPT.
 561-805-6717
 [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2004-08-30 Cont ID  
Sent By csiegber Date 2004-08-30 Time 10:02 Rev Time 0.00
Received By csiegber Date 2004-08-30 Time 10:02 Sent To B
Notes
2004-08-30 00:00:00TO JG DESK/SUBMITTALS/NEW PA'S

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2004-06-22 Cont ID  
Sent By csiegber Date 2004-06-22 Time 14:38 Rev Time 0.00
Received By csiegber Date 2004-06-22 Time 14:37 Sent To B
Notes
2004-06-22 00:00:00TO JG DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2004-05-13 Cont ID  
Sent By mmclean Date 2004-04-28 Time 13:57 Rev Time 0.00
Received By jgomez Date 2004-04-23 Time 11:09 Sent To PC
Notes
2004-04-29 00:00:004/29/04 TO SFD RACK/E
2004-04-26 00:00:00TO Z

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2004-05-07 Cont ID  
Sent By dpalmer Date 2004-05-03 Time 07:28 Rev Time 0.30
Received By pkrauss Date 2004-05-07 Time 08:47 Sent To P
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2004-05-08 Cont ID  
Sent By pkrauss Date 2004-05-07 Time 08:47 Rev Time 0.25
Received By jleech Date 2004-05-08 Time 07:41 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2004-04-28 Cont ID  
Sent By mmclean Date 2004-04-28 Time 13:57 Rev Time 0.00
Received By mmclean Date 2004-04-28 Time 13:57 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved