Plan Review Details - Permit 04041643
Plan Review Stops For Permit 04041643
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2004-10-14 Cont ID  
Sent By jgomez Date 2004-10-14 Time 08:54 Rev Time 0.33
Received By jgomez Date 2004-10-14 Time 08:54 Sent To PC
Notes
2004-10-14 00:00:00GARAGE DOOR PRODUCT APPROVAL.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2004-07-20 Cont ID  
Sent By csiegber Date 2004-08-30 Time 10:07 Rev Time 0.33
Received By jgomez Date 2004-07-20 Time 11:46 Sent To PC
Notes
2004-07-20 00:00:001-PROVIDE COPIES OF GARAGE DOOR DRAWINGS
 SUBMITTED TO SBCCI FOR APPROVAL. NEED
 DRAWINGS SIGNED AND SEALED ON DATE
 NOTED ON SBCCI EVALUATION REPORT.
 2-FLOOD ZONE REVISION IS OK.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ AT 805-6712.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2004-05-13 Cont ID  
Sent By csiegber Date 2004-06-22 Time 14:35 Rev Time 1.00
Received By jgomez Date 2004-05-13 Time 15:33 Sent To PC
Notes
2004-05-13 00:00:00BUILDING REVIEW PROVISO:
 1-GARAGE DOORS: DWGS SUBMITTED DON'T
 MATCH DWGS SUBMITTED TO SBCCI. DATE
 DWGS WERE SIGNED AND SEALED IS NOT THE
 SAME. SUBMIT COPY OF DWGS THAT WERE
 SUBMITTED TO SBCCI FOR APPROVAL.
 2-FLOOD ZONE AO: NEED TO PROVIDE THE
 ELEVATION CERTIFICATE.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2004-05-03 Cont ID  
Sent By dpalmer Date 2004-05-03 Time 06:02 Rev Time 0.25
Received By dpalmer Date 2004-05-03 Time 06:02 Sent To M
Notes
2004-05-03 00:00:00**********REDLINED/PROVISO *******
  
 REVISE PLANS BEFORE ROUGH.
  
 1)NOTE: PLEASE SEE 220.19 FOR A MIN OF
 8KW FIG FOR RANGE LOAD.
 2)NOTE: MAX LOAD ON A 1-P20A CIRCUIT
 IS 1.9KW, IRRG PUMP AND WASHER SHONW AT
 2KW. EXCEEDS 80%.
 3)NOTE: PLEASE SEE NFPA-72 FOR SD PLACE-
 -MENT. 8.1.4.2
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 CONSTUCTION SERVICES DEPT.
 561-805-6717
 [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2004-08-30 Cont ID  
Sent By csiegber Date 2004-08-30 Time 10:07 Rev Time 0.00
Received By csiegber Date 2004-08-30 Time 10:07 Sent To B
Notes
2004-08-30 00:00:00TO JG DESK/SUBMITTALS/NEW PA'S

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2004-06-22 Cont ID  
Sent By csiegber Date 2004-06-22 Time 14:35 Rev Time 0.00
Received By csiegber Date 2004-06-22 Time 14:35 Sent To B
Notes
2004-06-22 00:00:00TO JG DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2004-05-13 Cont ID  
Sent By mmclean Date 2004-04-28 Time 11:54 Rev Time 0.00
Received By jgomez Date 2004-04-23 Time 11:11 Sent To PC
Notes
2004-04-29 00:00:004/29/2004 TO SFD RACK/E
2004-04-27 00:00:004/23/2004 TO Z

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2004-05-05 Cont ID  
Sent By dpalmer Date 2004-05-03 Time 06:03 Rev Time 0.30
Received By pkrauss Date 2004-05-05 Time 13:06 Sent To P
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2004-05-08 Cont ID  
Sent By pkrauss Date 2004-05-05 Time 13:06 Rev Time 0.25
Received By jleech Date 2004-05-08 Time 07:16 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2004-04-28 Cont ID  
Sent By mmclean Date 2004-04-28 Time 11:54 Rev Time 0.00
Received By mmclean Date 2004-04-28 Time 11:54 Sent To I
Notes
***NONE***