Plan Review Details - Permit 04041550
Plan Review Stops For Permit 04041550
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2004-10-07 Cont ID  
Sent By jgomez Date 2004-10-07 Time 11:53 Rev Time 0.33
Received By jgomez Date 2004-10-07 Time 11:52 Sent To PC
Notes
2004-10-07 00:00:00CHECKLIST:
 1-REVISE SURVEY. NORTH ARROW ORIENTATION
 SHOWN ON ENLARGED PLAN IS INCORRECT.
  
 **GARAGE DOOR PRODUCT APPROVAL IS OK.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ AT 805-6712.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2004-07-20 Cont ID  
Sent By csiegber Date 2004-08-30 Time 10:10 Rev Time 0.33
Received By jgomez Date 2004-07-20 Time 15:12 Sent To PC
Notes
2004-07-20 00:00:00REVISION CHECKLIST:
 1-SURVEY SHOWS NORTH ARROW WITH WRONG
 ORIENTATION. SEE LOCATION MAP AND
 REVISE AS REQUIRED.
 2-DETAIL E/4 AND RESIDENTIAL NOTES ON
 DWG #2 DON'T MATCH. CLARIFY FASTENER
 SPACING. SEC. 104.2.1.2 CITY
 AMENDMENTS TO FBC 2001.
 3-SECTION A4: SPECIFY WHERE ARE TABLES
 6 AND 8 TAKEN FROM. SECTION 104.2.1.2
 CITY AMENDMENTS TO FBC 2001.
 4-PROVIDE COPIES OF GARAGE DOOR DRAWINGS
 SUBMITTED TO SBCCI FOR APPROVAL. NEED
 DRAWINGS SIGNED AND SEALED ON DATE
 NOTED ON SBCCI EVALUATION REPORT.
  
 IF YOU HAVE ANY QUESTION, PLEASE CALL
 JULIO GOMEZ AT 805-6712.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2004-05-13 Cont ID  
Sent By csiegber Date 2004-06-22 Time 14:40 Rev Time 1.50
Received By jgomez Date 2004-05-13 Time 13:29 Sent To PC
Notes
2004-05-13 00:00:00BUILDING REVIEW PROVISO:
 1-REVISE/CLARIFY SURVEY: THERE ARE TWO
 NORTH ARROWS POINTING TO OPPOSITE
 DIRECTIONS. REVISE SURVEY SHOWING
 CORRECT NORTH ARROW ORIENTATION.
 2-DETAIL E/4 AND RESIDENTIAL NOTES ON
 SHEET #2 DON'T MATCH. CLARIFY FASTENER
 SPACING. SEC. 104.2.1.2 CITY AMENDMENT
 TO FBC 2001.
 3-SECTION A/4: SPECIFY WHERE ARE TABLES
 6 AND 8 FOR ROOF TILE FASTENERS TAKEN
 FROM. SEC. 104.2.1.1 CITY AMENDMENTS
 TO FBC 2001.
 4-FLOOD ZONE AO: NEED TO PROVIDE THE
 ELEVATION CERTIFICATE.
 5-GARAGE DOORS: DWGS SUBMITTED DON'T
 MATCH THE DWGS SUBMITTED ONSBCCI
 EVALUATION REPORT. THE DATE DWGS WERE
 SIGNED AND SELAED IS NOT THE SAME.
 PROVIDE COPIES OF DWGS THAT WERE
 SUBMITTED TO SBCCI.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2004-05-03 Cont ID  
Sent By dpalmer Date 2004-05-03 Time 13:34 Rev Time 0.25
Received By dpalmer Date 2004-05-03 Time 13:34 Sent To M
Notes
2004-05-03 00:00:00NOTED , SD'S INSATLLED PER NFPA-72
 8-1.4.2

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2004-08-30 Cont ID  
Sent By csiegber Date 2004-08-30 Time 10:10 Rev Time 0.00
Received By csiegber Date 2004-08-30 Time 10:09 Sent To B
Notes
2004-08-30 00:00:00TO JG DESK/SUBMITTALS/NEW PA'S

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2004-06-22 Cont ID  
Sent By csiegber Date 2004-06-22 Time 14:40 Rev Time 0.00
Received By csiegber Date 2004-06-22 Time 14:40 Sent To B
Notes
2004-06-22 00:00:00TO JG DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2004-05-13 Cont ID  
Sent By jgomez Date 2004-05-13 Time 14:58 Rev Time 0.00
Received By jgomez Date 2004-04-23 Time 10:26 Sent To PC
Notes
2004-04-29 00:00:004/23/2004 TO Z
 4/29/2004 TO SFD RACK/E

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2004-05-13 Cont ID  
Sent By dpalmer Date 2004-05-03 Time 13:34 Rev Time 0.00
Received By jgomez Date 2004-05-13 Time 13:27 Sent To  
Notes
2004-05-13 00:00:00PLANS SIGNED OFF BY PATTY KRAUSS ON
 5-6-04. SEE PLANS.

Review Stop P PLUMBING
Rev No 1 Status P Date 2004-05-08 Cont ID  
Sent By jleech Date 2004-05-08 Time 07:13 Rev Time 0.25
Received By jleech Date 2004-05-08 Time 07:13 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2004-04-28 Cont ID  
Sent By mmclean Date 2004-04-28 Time 15:58 Rev Time 0.00
Received By mmclean Date 2004-04-28 Time 15:58 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved