Plan Review Details - Permit 04041495
Plan Review Stops For Permit 04041495
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2004-09-23 Cont ID  
Sent By jgomez Date 2004-09-23 Time 14:05 Rev Time 0.33
Received By jgomez Date 2004-09-23 Time 14:04 Sent To PC
Notes
2004-09-23 00:00:00CHECKLIST:
 1-REVISE SURVEY. IT SHOWS FLOOD ZONE AO
 AND B SIMULTANEOUSLY. SPECIFY ONLY
 ONE FLOOD ZONE.
  
 **GARAGE DOOR PRODUCT APPROVAL IS OK.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ AT 805-6712.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2004-05-18 Cont ID  
Sent By csiegber Date 2004-08-30 Time 10:04 Rev Time 1.00
Received By jgomez Date 2004-05-18 Time 14:59 Sent To PC
Notes
2004-05-18 00:00:00BUILDING REVIEW PROVISO:
 1-PROVIDE SOIL TEST REPORT. 2 COPIES.
 2-PROVIDE ADDITIONAL COPY OF STORM
 SHUTTERS INFORMATION. ONLY ONE WAS
 SUBMITTED.
 3-SUBMIT DRAWINGS FOR GARAGE DOORS THAT
 MATCH DWGS SUBMITTED TO SBCCI. NEED
 DWGS THAT WERE SIGNED AND SEALED ON
 DATE SPECIFIED ON SBCCI REPORT.
 4-FLOOD ZONE AO: NEED TO PROVIDE THE
 ELEVATION CERTIFICATE.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2004-05-03 Cont ID  
Sent By dpalmer Date 2004-05-03 Time 05:45 Rev Time 0.25
Received By dpalmer Date 2004-05-03 Time 05:45 Sent To M
Notes
2004-05-03 00:00:00******* REDLINED/ PROVISO ********
  
 REVISE PLANS BEFORE ROUGH.
 MAX LOAD FOR 20A CIRCUIT(S), WASHER
 SHOWN AT 2KW, IRRG PUMP, 1-P20A, 2KW?
 MAX LOAD ALLOWED ON 20A CIR 1.9KW
  
 PLEASE SEE 220.19 FOR MIN OF 8KW FIG
 FOR RANGE LOAD.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2004-08-30 Cont ID  
Sent By csiegber Date 2004-08-30 Time 10:04 Rev Time 0.00
Received By csiegber Date 2004-08-30 Time 10:04 Sent To B
Notes
2004-08-30 00:00:00TO JG DESK/SUBMITTALS/NEW PA'S

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2004-05-18 Cont ID  
Sent By mmclean Date 2004-05-18 Time 15:52 Rev Time 0.00
Received By jgomez Date 2004-04-22 Time 08:30 Sent To PC
Notes
2004-04-29 00:00:00TO Z

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2004-05-05 Cont ID  
Sent By dpalmer Date 2004-05-03 Time 05:46 Rev Time 0.25
Received By pkrauss Date 2004-05-05 Time 12:06 Sent To P
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2004-05-08 Cont ID  
Sent By pkrauss Date 2004-05-05 Time 12:23 Rev Time 0.25
Received By jleech Date 2004-05-08 Time 06:43 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2004-04-28 Cont ID  
Sent By dpalmer Date 2004-04-22 Time 08:30 Rev Time 0.00
Received By mmclean Date 2004-04-28 Time 15:49 Sent To I
Notes
***NONE***