Plan Review Stops For Permit 04041338 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2004-06-10 |
|
|
Cont ID |
|
Sent By |
lsmith |
Date |
2004-06-10 |
Time |
11:45 |
Rev Time |
0.50 |
Received By |
lsmith |
Date |
2004-06-10 |
Time |
11:45 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2004-05-18 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2004-06-10 |
Time |
09:24 |
Rev Time |
0.75 |
Received By |
lsmith |
Date |
2004-05-06 |
Time |
14:31 |
Sent To |
|
|
Notes |
2004-05-06 00:00:00 | BUILDING PLAN REVIEW: | | | | 1. SEE ELECTRIC & PLUMBING NOTES ON | | VALUE STATED ON PURCHASE ORDER.FBC | | STATES VALUE IS TO BE TOTAL CONTRACT |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
P |
Date |
2004-06-01 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2004-06-01 |
Time |
13:44 |
Rev Time |
0.25 |
Received By |
dpalmer |
Date |
|
Time |
|
Sent To |
P |
|
Notes |
2004-06-01 00:00:00 | ELECTRICAL PLANS STAMPED OK, | | | | SEE COMMENTS FROM BLDG FOR VALUE. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
F |
Date |
2004-05-12 |
|
|
Cont ID |
|
Sent By |
alange |
Date |
2004-05-25 |
Time |
14:08 |
Rev Time |
0.33 |
Received By |
dpalmer |
Date |
2004-05-12 |
Time |
15:31 |
Sent To |
P |
|
Notes |
2004-05-12 00:00:00 | ELECTRICAL PLANS STAMPED OK. | | | | VALUE FOR SCOPE OF WORK NEEDS TO BE | | ADDRESSED PER FBC 104.6.5 BEFORE | | PERMIT CAN BE ISSUED. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2004-05-03 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-05-11 |
Time |
11:40 |
Rev Time |
0.33 |
Received By |
dpalmer |
Date |
2004-05-03 |
Time |
17:56 |
Sent To |
B |
|
Notes |
2004-05-03 00:00:00 | ********** UNSAT *************** | | | | 1)NOTE: PLEASE CORRELATE WIRING DIAGRAM | | WITH ALL NEW EQUIPMENT BEING INSTALLED. | | | | 2)NOTE; PLEASE PROVIDE CORRECT VALUATION | | FOR POOL/EQUIPMENT/ ETC. | | FBC 104.6.5 | | VALUE MAY BE ADJUSTED PER FBC. | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | REVIEW. IF THERE ARE ANY QUESTIONS, | | PLEASE DO NOT HESITATE TO CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | CITY OF WEST PALM BEACH | | CONSTUCTION SERVICES DEPT. | | 561-805-6717 | | [email protected] |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
6 |
Status |
N |
Date |
2004-11-02 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-11-02 |
Time |
12:42 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-11-02 |
Time |
12:42 |
Sent To |
P |
|
Notes |
2004-11-02 00:00:00 | TO KS BOX/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
2004-05-25 |
|
|
Cont ID |
|
Sent By |
alange |
Date |
2004-05-25 |
Time |
14:08 |
Rev Time |
0.00 |
Received By |
alange |
Date |
2004-05-25 |
Time |
14:08 |
Sent To |
E |
|
Notes |
2004-05-25 00:00:00 | TO DP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2004-05-11 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-05-11 |
Time |
11:40 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-05-11 |
Time |
11:40 |
Sent To |
E |
|
Notes |
2004-05-11 00:00:00 | TO DP DESK/RESUB |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2004-04-22 |
|
|
Cont ID |
|
Sent By |
alange |
Date |
2004-04-22 |
Time |
13:17 |
Rev Time |
0.00 |
Received By |
alange |
Date |
2004-04-22 |
Time |
13:17 |
Sent To |
P |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2004-04-22 |
|
|
Cont ID |
|
Sent By |
alange |
Date |
2004-04-22 |
Time |
13:08 |
Rev Time |
0.00 |
Received By |
alange |
Date |
2004-04-22 |
Time |
13:07 |
Sent To |
P |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2004-04-20 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-04-20 |
Time |
14:32 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-04-20 |
Time |
14:31 |
Sent To |
Z |
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
4 |
Status |
P |
Date |
2004-11-06 |
|
|
Cont ID |
|
Sent By |
pschmitz |
Date |
2004-11-06 |
Time |
13:27 |
Rev Time |
0.00 |
Received By |
pschmitz |
Date |
2004-11-06 |
Time |
13:28 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
P |
Date |
2004-06-10 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2004-06-10 |
Time |
09:24 |
Rev Time |
2.00 |
Received By |
kstevens |
Date |
2004-06-10 |
Time |
09:24 |
Sent To |
B |
|
Notes |
2004-06-10 00:00:00 | CALCULATED VALUATION $85,112 | | | | | | | | | | | | FBC02001 424.2.15 GAS PIPING SHALL | | COMPLY WITH FBC FUEL GAS. SEPARATE PLANS | | AND PERMIT REQUIRED. |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
F |
Date |
2004-05-16 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2004-06-01 |
Time |
13:44 |
Rev Time |
2.50 |
Received By |
pschmitz |
Date |
|
Time |
|
Sent To |
B |
|
Notes |
2004-05-16 00:00:00 | PLUMBING PLAN REVIEW FBC 2001 DENIED | | 2ND TIME. | | 1)COMPLY WITH PREVIOUS PLAN REVIEW DATED | | 05-03-2004 NOTE #(1) BUIDING PERMIT | | VALUATION,SEC 104.6.5 | | (2)RE- SUBMITTED SHT 4, WITH PINK HIGH | | LIGHTS,NOT SIGNED AND SEALED BY ENGINEER | | OF RECORD, | | END OF COMMENTS 561-805-6692 |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2004-05-03 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2004-05-12 |
Time |
16:10 |
Rev Time |
1.25 |
Received By |
pschmitz |
Date |
|
Time |
|
Sent To |
E |
|
Notes |
2004-05-03 00:00:00 | PLUMBING PLAN REVIEW, DENIED FBC 2001 | | (1)SEC 104.6.5 BUILDING PERMIT VALUATION | | VALUATION BASED ON TOTAL REPLACEMENT VAL | | UE TO INCLUDE STRUCTAL, ELECTRIC,PLUMBIN | | G, MECHANICAL, INTERIOR FINISH, NORMAL | | SITE WORK, ARCHITECTURAL AND DESIGN FEES | | EXCLUDING ONLY LAND VALUE. | | (2) ADD THE FOLLOWING TO PLUMBING NOTES. | | SEC 424.2.6.6.5 WHERE PROVIDED, THE | | VACUM OR PRESSURE CLEANER FITTING SHALL | | BE LOCATED AT LEAST 6" AND NOT GREATER | | THAN 12" BELOW THE MINIMUM OPERATING | | WATER LEVEL, | | SEC 424.2.9 WATER SUPPLY, LOCAL ORDANCE | | #2853-95 BACK FLOW PREVENTER REQUIRED | | ON WATER SERVICE, PRIOR TO COMMENCING | | WORK. | | SEC 424.2.12.1 PRESSURE TEST. NO AIR | | TEST WILL BE APPROVED FOR PVC PIPE. | | SEC 424.2.13.2 JOINTS AND CONNECTIONS | | PURPLE PRIMER, REQUIRED ON PVC PIPING. | | SEC 424.2.14.2 WATER RETENTION, PROVIDE | | A POSITIVE MEANS OF RETAINING WATER IN | | THE HEATER WHEN THE PUMP IS SHUT OFF. | | SEC 424.2.14.4 CONNECTIONS, ALL WATER | | HEATING HEATING EQUIPMENT SHALL BE INSTA | | LLED WITH FLANGES OR UNION CONNECTIONS | | ADJACENT TO THE WATER HEATER. | | SEC 424.2.15 GAS PIPING, SEPERATE PLANS | | AND PERMIT REQUIRED. | | END OF COMMENTS QUESTIONS 561-805-6692 |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2004-04-22 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-04-20 |
Time |
14:32 |
Rev Time |
0.25 |
Received By |
sgraham |
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|