Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2004-05-05 Cont ID  
Sent By rmcdouga Date 2004-05-05 Time 09:40 Rev Time 0.00
Received By rmcdouga Date 2004-05-05 Time 09:40 Sent To  
Notes
2004-05-05 00:00:00SUBMITTAL FOR COLLIER GARAGE DOOR IS OK

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2004-04-21 Cont ID  
Sent By csiegber Date 2004-05-03 Time 14:36 Rev Time 2.00
Received By rmcdouga Date 2004-04-21 Time 14:31 Sent To  
Notes
2004-04-21 00:00:00BUILDING PROVISO
  
 1) SUBMIT STATE PRODUCT APPROVAL FOR
 8'X 7' GARAGE DOOR.
  
 2) SUBMIT SIGNED & SEALED REPORT FROM
 ENGINEER STATING THAT BUTT GLASS IS
 INSTALLED TO SITE SPECIFIC PRODUCT
 APPROVAL SPECIFICATIONS BEFORE C.O. IS
 ISSUED.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2004-04-13 Cont ID  
Sent By csiegber Date 2004-04-20 Time 12:13 Rev Time 2.00
Received By rmcdouga Date 2004-04-13 Time 16:11 Sent To  
Notes
2004-04-13 00:00:00DENIED
  
 1) A RECORDED COPY OF THE NOTICE OF
 COMMENCEMENT MUST BE SUBMITTED BEFORE A
 PERMIT CAN BE ISSUED.
  
 2) THE PLAN REVIEW NUMBER ON THE IMPACT
 FEE RECEIPT DOES NOT MATCH THE PLAN
 REVIEW NUMBER ON THE PLANS. PLEASE
 CORRECT.
  
 3) THE TOTAL SQUARE FEET OF A/C AREA ON
 THE PLANS IS INCORRECT ON SHEET 3. IT
 SHOULD BE 3410 SQFT.
  
 4) THE FL PRODUCT APPROVAL #S LISTED FOR
 TWO OF THE FIXED GLASS WINDOWS IN THE
 SCHEDULE ON SHEET 3 ARE INCORRECT. THEY
 SHOULD BE FL 243.
  
 5) PLEASE CLARIFY THE TP4X CONNECTORS
 SPECIFIED ON SHEET 2 FOR THE 3-2X4 POSTS
 IN THE WALL BELOW THE GIRDER TRUSS. I
 COULD NOT LOCATE THEM IN THE CURRENT
 USP OR SIMPSON CATALOGES AND DID NOT SEE
 FL PROD.APP. FOR IT.
  
 6) THE WINDOW IN BATH #3 WHICH IS WITHIN
 3 FEET HORIZONTALLY OF THE TUB IS
 REQUIRED TO BE TEMPERED BY FBC 2405.2.
  
 7) SPECIFY THE ATTIC LIVE LOAD ON THE
 PLANS. SEE FBC TABLE 1604.1.
  
 8) FOR CLARITY, PLEASE INDICATE WHICH
 CONNECTORS ARE FOR THE FLOOR TRUSSES ON
 THE TRUSS TIE DOWN LAYOUT ON SHEET 9.
  
 9) SUBMIT STATE PRODUCT APPROVAL FOR THE
 SINGLE OUTSWING EXTERIOR DOOR AT BATH #2
  
 10) SUBMIT STATE PRODUCT APPROVAL WITH
 APPROVED STATUS FOR THE COLLIER GARAGE
 DOOR.
  
 11) SUBMIT STATE OR LOCAL PRODUCT
 APPROVAL FOR THE 8'X7' GARAGE DOOR. THE
 DRAWINGS SUBMITTED FOR THE COLLIER
 GARAGE DOOR IS LIMITED TO A MINIMUM SIZE
 OF 10'X6'.
  
 12) THE TRUSS ANCHOR SCHEDULE ON SHEET 9
 LISTS A NUE-VUE NVSTA 48 CONNECTOR. THE
 STATE PRODUCT APPROVAL SUBMITTED LISTS A
 NVRT 48 OR NVSTA 22. PLEASE CLARIFY.
  
 13) THE TRUSS CONNECTOR SCHEDULE LISTS A
 SIMPSON HUC 412 CONNECTOR WITH 1505# OF
 UPLIFT. THE STATE PRODUCT APPROVAL
 SUBMITTED IS FOR A HU 412 WITH 905# OF
 UPLIFT. PLEASE CLARIFY.
  
 14) THE SUBMITTAL FOR THE BUTT GLASS
 WIDOW IS INCOMPLETE AND HAS ERRORS. THE
 THIRD PARTY QUAILTY ASSURANCE IS
 REQUIRED. THE DIMENSIONS OF THE PANELS
 NEEDS TO MATCH THE ARCHITECTURAL PLANS.
 THE LOT # ON SHEET 1 OF 2 IS INCORRECT.
 SPECIFY THE DESIGN PRESSURES. SUBMIT
 THE CALCULATIONS. SUBMIT THE SPECS. FOR
 THE GE 1200 SILICONE.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2004-03-17 Cont ID  
Sent By btrobaug Date 2004-03-17 Time 11:17 Rev Time 0.50
Received By btrobaug Date 2004-03-17 Time 11:17 Sent To M
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2004-05-03 Cont ID  
Sent By csiegber Date 2004-05-03 Time 14:36 Rev Time 0.00
Received By csiegber Date 2004-05-03 Time 14:36 Sent To B
Notes
2004-05-03 00:00:00TO RM DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2004-04-20 Cont ID  
Sent By csiegber Date 2004-04-20 Time 12:13 Rev Time 0.00
Received By csiegber Date 2004-04-20 Time 12:13 Sent To B
Notes
2004-04-20 00:00:00TO RM DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2004-04-13 Cont ID  
Sent By mmclean Date 2004-03-09 Time 11:06 Rev Time 0.00
Received By rmcdouga Date 2004-03-05 Time 15:33 Sent To  
Notes
2004-03-09 00:00:00TO SFD RACK/E
2004-03-05 00:00:00TO Z

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2004-04-13 Cont ID  
Sent By jleech Date 2004-03-20 Time 09:06 Rev Time 0.00
Received By rmcdouga Date   Time   Sent To  
Notes
2004-04-13 00:00:00OK PER P.KRAUSS 3/22/04

Review Stop P PLUMBING
Rev No 1 Status P Date 2004-03-20 Cont ID  
Sent By jleech Date 2004-03-20 Time 09:06 Rev Time 0.33
Received By jleech Date 2004-03-20 Time 09:06 Sent To M
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2004-03-09 Cont ID  
Sent By mmclean Date 2004-03-09 Time 11:06 Rev Time 0.00
Received By mmclean Date 2004-03-09 Time 11:06 Sent To I
Notes
***NONE***