Plan Review Details - Permit 04010263
Plan Review Stops For Permit 04010263
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2004-05-17 Cont ID  
Sent By aaponte Date 2004-05-14 Time 14:53 Rev Time 1.00
Received By shill Date 2004-05-17 Time 09:27 Sent To  
Notes
2004-05-17 00:00:00PROVISO - SEPARATE PERMITS FOR SIGN AND
 AWNING

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2004-03-01 Cont ID  
Sent By hpiskura Date 2004-03-01 Time 16:01 Rev Time 0.00
Received By hpiskura Date 2004-03-01 Time 16:01 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2004-04-23 Cont ID  
Sent By dpalmer Date 2004-04-23 Time 22:01 Rev Time 0.33
Received By dpalmer Date 2004-04-23 Time 22:01 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2004-04-12 Cont ID  
Sent By csiegber Date 2004-04-20 Time 16:00 Rev Time 1.00
Received By dpalmer Date 2004-04-12 Time 10:24 Sent To  
Notes
2004-04-12 00:00:00************ UNSAT *****************
  
 1)NOTE: PLEASE SEE E-500, NOTE MENTIONS
 TO SEE E-500 FOR PANEL SCHEDULES, BUT
 NONE SHOWN.
  
 2)NOTE; WIND LOADS FOR LIGHTING/POLE
 IS REQ'D TO BE PER FBC 140 MPH.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2004-02-12 Cont ID  
Sent By dpalmer Date 2004-02-12 Time 14:49 Rev Time 0.50
Received By dpalmer Date 2004-02-12 Time 14:49 Sent To  
Notes
2004-02-12 00:00:00**************** UNSAT *****************
  
 1)NOTE: PLEASE ONLY SUBMIT ELECTRICAL
 RISER DIAGRAM FOR PHASE OF WORK BEING
 APPLIED FOR AND SUBMITTED FOR THIS
 PHASE.
 ALL OTHER ELECTRICAL RISER DIAGRAM
 WORK WERE SUBMITTED UNDER OTHER PHASES.
 LOAD CALCULATIONS PERTAINING TO THIS
 PHASE SHOULD REMAIN.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 CONSTUCTION SERVICES DEPT.
 561-805-6717
 [email protected]

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2004-04-13 Cont ID  
Sent By mamini Date 2004-04-13 Time 08:59 Rev Time 5.00
Received By mamini Date 2004-04-13 Time 08:59 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2004-01-30 Cont ID  
Sent By mamini Date 2004-01-30 Time 10:42 Rev Time 1.00
Received By mamini Date 2004-01-30 Time 10:42 Sent To  
Notes
2004-01-30 00:00:00FAILED:
 1. WORKS WITHIN OKEECHOBEE BOULEVARD
 REQUIRES REVIEW AND APPROVAL FROM FDOT,
 561-432-4966.
 2. WORKS WITHIN CITY OF WPB R.O.W (CLEAR
 WATER PARK ROAD) MUST BE APPROVED BY THE
 CITY ENGINEER, PLEASE SUBMIT CIVIL PLANS
 ONLY, ATT; MANNY GONZALEZ 659-8040 EXT.
 2306.
 3. PROPOSED SIDEWALK ON EAST OF PROPERTY
 MAY BE IN CONFLICT WITH EXISTING UTILITY
 POLES, PLEASE VERIFY.
 4. PLEASE NOTE THAT ALL OFF STREET
 PARKING STALLS MUST BE PAINTED WITH
 DOUBLE 4" WIDE STRIPES, PER CITY
 REQUIREMENTS.
  
 IF ANY QUESTION PLEASE CONTACT 805-6723
 MOHAMMAD R. AMINI

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2004-01-29 Cont ID  
Sent By mcarsill Date 2004-01-29 Time 14:54 Rev Time 0.00
Received By mcarsill Date 2004-01-29 Time 14:54 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2004-04-23 Cont ID  
Sent By dpalmer Date 2004-04-23 Time 22:02 Rev Time 0.00
Received By dpalmer Date 2004-04-23 Time 22:02 Sent To  
Notes
2004-04-23 00:00:00TO COMM BOARD #45
 NEW B SHEETS

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2004-04-20 Cont ID  
Sent By csiegber Date 2004-04-20 Time 16:00 Rev Time 0.00
Received By csiegber Date 2004-04-20 Time 16:00 Sent To E
Notes
2004-04-20 00:00:00TO DP DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2004-03-17 Cont ID  
Sent By csiegber Date 2004-03-17 Time 14:57 Rev Time 0.00
Received By csiegber Date 2004-03-17 Time 14:57 Sent To  
Notes
2004-03-17 00:00:00TO COMM BD#56

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2004-03-12 Cont ID  
Sent By mmclean Date 2004-03-17 Time 11:39 Rev Time 0.00
Received By csiegber Date 2004-03-12 Time 09:37 Sent To Z
Notes
2004-03-12 00:00:00RESUB

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2004-03-17 Cont ID  
Sent By csiegber Date 2004-05-12 Time 11:32 Rev Time 0.00
Received By csiegber Date 2004-01-07 Time 14:07 Sent To  
Notes
2004-01-28 00:00:001/7/2004TO Z
 1/28/2004TO COMM BD#38

Review Stop L LANDSCAPING
Rev No 1 Status P Date 2004-03-17 Cont ID  
Sent By mmclean Date 2004-03-17 Time 11:38 Rev Time 0.00
Received By mmclean Date 2004-03-17 Time 11:38 Sent To I
Notes
2004-03-17 00:00:00APPROVED BY ANA APONTE 659-8031.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2004-02-20 Cont ID  
Sent By pkrauss Date 2004-02-20 Time 10:15 Rev Time 0.55
Received By pkrauss Date 2004-02-20 Time 10:15 Sent To  
Notes
2004-02-20 00:00:00PHASE 5 -
 RISERS FOR EXHAUST, RTU'S, NEW SMOKE
 EXHAUST.EQUIPMENT SCHEDULES.

Review Stop Z ZONING
Rev No 2 Status P Date 2004-05-14 Cont ID  
Sent By aaponte Date 2004-05-14 Time 14:54 Rev Time 0.00
Received By aaponte Date 2004-05-14 Time 14:54 Sent To  
Notes
2004-05-14 00:00:00APPROVED BY ANA APONTE

Review Stop Z ZONING
Rev No 1 Status F Date 2004-01-28 Cont ID  
Sent By csiegber Date 2004-03-12 Time 09:38 Rev Time 2.00
Received By agiannio Date 2004-01-28 Time 09:07 Sent To  
Notes
2004-01-28 00:00:0094-108(B)(2) AND (4)HEDGE MUST BE
 INSTALLED AT 36 INCHES IN HEIGHT AND
 MAINTAINED AT 48 INCHES MAX.THE FENCE
 MAY NOT EXCEED 4 FEET IN HEIGHT ALONG
 OKEECHOBEE RD. 6 FEET HIGH FENCES ARE
 PERMITTED ON SIDE OR INTERIOR LOT LINES.