Plan Review Stops For Permit 04010152 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
5 |
Status |
F |
Date |
2004-06-23 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2004-06-23 |
Time |
16:45 |
Rev Time |
0.25 |
Received By |
jgomez |
Date |
2004-06-23 |
Time |
16:45 |
Sent To |
PC |
|
Notes |
2004-06-23 00:00:00 | PRODUCT APPROVAL CHECKLIST: | | 1-NEED COMPLETE PRODUCT APPROVAL | | INFORMATION FOR ALL WINDOWS AND DOORS, | | WINDOW MULLIONS, GLASS BLOCK, ROOF | | TILE, STRUCTURAL CONNECTORS, GARAGE | | DOOR AND ENTRY DOOR. | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CALL | | JULIO GOMEZ AT 805-6712. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
P |
Date |
2004-03-25 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2004-03-25 |
Time |
12:04 |
Rev Time |
0.33 |
Received By |
jgomez |
Date |
2004-03-25 |
Time |
12:04 |
Sent To |
PC |
|
Notes |
2004-03-25 00:00:00 | ENGINEER LETTER TO CLARIFY ISSUES LISTED | | ON BUILDING REVIEW PROVISO. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2004-03-09 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2004-03-09 |
Time |
07:43 |
Rev Time |
0.50 |
Received By |
jgomez |
Date |
2004-03-09 |
Time |
07:43 |
Sent To |
PC |
|
Notes |
2004-03-09 00:00:00 | PRODUCT APPROVAL CHECKLIST: | | 1-ENTRY DOORS: FLORIDA PRODUCT APPROVAL | | COVER PAGE SUBMITTED IS FOR THERMA-TRU | | FIBERGLASS DOORS, DRAWINGS SUBMITTED | | ARE FOR "BENCHMARK" STEEL DOOR. THESE | | ARE TWO DIFFERENT TYPE OF DOORS. | | PROVIDE MATCHING FLORIDA COVER PAGE & | | DRAWINGS FOR DOOR TO BE INSTALLED IN | | THIS HOUSE. | | 2-PGT WINDOW MULLIONS: PROVIDE DRAWINGS | | THAT MATCH FLORIDA PRODUCT APPROVAL | | COVER. SEE "PERFORMANCE LEVEL OF THE | | PRODUCT AND CONDITIONS OR LIMITATIONS | | OF USE" ON FLORIDA PRODUCT APPROVAL | | COVER PAGE FOR NOA'S SUBMITTED TO THE | | DCA FOR APPROVAL. | | 3-MULIA GLASS BLOCK FLORIDA PRODUCT | | APPROVAL IS PENDING. CONTRACTOR WAS | | TOLD THAT IT WAS APPROVED ON LAST | | MEETING & WEBSITE WASN'T UPDATED YET. | | IF PRODUCT WAS APPROVED & INFORMATION | | UPDATED PRIOR TO INSTALLATION, THEN | | PROVIDE FLORIDA PRODUCT APPROVAL COVER | | PAGE AND DADE COUNTY NOA DRAWINGS THAT | | WERE SUBMITTED TO THE STATE. ON THE | | OTHER HAND, LOCAL PRODUCT APPROVAL MAY | | BE GRANTED BY PROVIDING CURRENT DADE | | COUNTY NOA AND DRAWINGS ALONG WITH | | LOCAL PRODUCT APPROVAL COVER FORM AS | | UPDATED BY THE CITY. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2004-03-02 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2004-03-02 |
Time |
09:04 |
Rev Time |
0.33 |
Received By |
jgomez |
Date |
2004-03-02 |
Time |
09:04 |
Sent To |
E |
|
Notes |
2004-03-02 00:00:00 | BUILDING REVIEW CHECKLIST: | | 1-PROVIDE COMPLETE FLORIDA/LOCAL PRODUCT | | APPROVAL FOR ALL DOORS, WINDOWS, ROOF | | TILE, GLASS BLOCK, WINDOW MULLIONS AND | | ALL STRUCTURAL CONNECTORS. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2004-02-05 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-02-27 |
Time |
14:24 |
Rev Time |
1.00 |
Received By |
jgomez |
Date |
2004-02-05 |
Time |
17:32 |
Sent To |
Z |
|
Notes |
2004-02-05 00:00:00 | BUILDING REVIEW APPROVED WITH PROVISO: | | 1-PROVIDE FLOOR PLANS WITH GARAGE ON | | LEFT SIDE AS SHOWN ON SURVEY AS REQ'D | | BY BUILDING OFFICIAL. SEC. 104.2.1.2 | | CITY AMENDMENTS TO FBC 2001. | | 2-PROVIDE COMPLETE CURRENT PRODUCT APPRO | | VAL FOR ALL DOORS, WINDOWS, MULLIONS, | | GLASS BLOCK, ROOF TILE AND ALL | | STRUCTURAL CONNECTORS UNDER A SEPARATE | | PERMIT. | | 3-CLARIFY/REVISE TRUSS ANCHOR SCHEDULE. | | 4-TYPICAL WALL SECTION A/4: CLARIFY | | WHERE ARE TABLES 6 AND 8 FOR ROOF TILE | | FASTENERS TAKEN FROM?. SEE SECTION | | 1606.3 FBC 2001 AND SEC. 104.2.1.1 | | CITY AMENDMENTS TO FBC 2001. | | 5-SHEET #7: A)REVISE DESIGN PRESSURES ON | | REAR ELEVATION. | | B)WINDOWS SHOWN ON ELEVATION DON'T MATCH | | THE WINDOW SCHEDULE. REVISE AS REQ'D | | C)REVISE AL NOTES ON FLOOR PLAN AND ROOF | | FRAMING PLAN TO REFLECT CHANGE OF WOOD | | BEAM TO CONCRETE. | | 6-SHEET #3: CLARIFY NOTE REGARDING UP- | | LIFT CALCS AND CONNECTORS SELECTED. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2004-03-02 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2004-03-02 |
Time |
13:19 |
Rev Time |
0.50 |
Received By |
btrobaug |
Date |
2004-03-02 |
Time |
09:41 |
Sent To |
P |
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2004-01-09 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2004-03-02 |
Time |
09:09 |
Rev Time |
0.33 |
Received By |
dpalmer |
Date |
2004-01-09 |
Time |
07:58 |
Sent To |
M |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2004-02-27 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-02-27 |
Time |
14:24 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-02-27 |
Time |
14:24 |
Sent To |
B |
|
Notes |
2004-02-27 00:00:00 | TO JG DESK/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2004-02-27 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-02-27 |
Time |
12:27 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-02-27 |
Time |
12:27 |
Sent To |
B |
|
Notes |
2004-02-27 00:00:00 | TO JG DESK/SUBMITTALS |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2004-02-11 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-02-11 |
Time |
16:08 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-02-11 |
Time |
16:08 |
Sent To |
B |
|
Notes |
2004-02-11 00:00:00 | TO JG DESK/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2004-02-05 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2004-02-05 |
Time |
17:54 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
2004-01-06 |
Time |
13:38 |
Sent To |
Z |
|
Notes |
2004-01-20 00:00:00 | TO KS BOX | 2004-01-06 00:00:00 | TO Z | | TO E/DP |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
P |
Date |
2004-01-22 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2004-03-05 |
Time |
10:15 |
Rev Time |
0.25 |
Received By |
pkrauss |
Date |
2004-01-22 |
Time |
14:48 |
Sent To |
B |
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2004-03-05 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2004-03-05 |
Time |
10:15 |
Rev Time |
0.50 |
Received By |
kstevens |
Date |
2004-03-05 |
Time |
10:14 |
Sent To |
M |
|
Notes |
2004-03-05 00:00:00 | REVISION OK - REVERSED FLOOR PLAN |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2004-01-22 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2004-03-02 |
Time |
13:19 |
Rev Time |
0.33 |
Received By |
kstevens |
Date |
2004-01-22 |
Time |
07:08 |
Sent To |
M |
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2004-02-09 |
|
|
Cont ID |
|
Sent By |
mmclean |
Date |
2004-02-09 |
Time |
09:15 |
Rev Time |
0.00 |
Received By |
mmclean |
Date |
2004-02-09 |
Time |
09:15 |
Sent To |
B |
|
Notes |
2004-02-09 00:00:00 | GIVEN TO JULIO |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2004-01-06 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2004-02-05 |
Time |
17:55 |
Rev Time |
0.00 |
Received By |
mmclean |
Date |
2004-01-06 |
Time |
12:13 |
Sent To |
I |
|
Notes |
2004-01-06 00:00:00 | DENIED, MUST MEET FRONT SETBACK FOR | | FRONT LOAD GARAGE OF 20FT CALLED CONTR | | LEFT MSG |
|
|