Plan Review Details - Permit 03121490
Plan Review Stops For Permit 03121490
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2004-03-25 Cont ID  
Sent By jgomez Date 2004-03-25 Time 12:01 Rev Time 0.33
Received By jgomez Date 2004-03-25 Time 12:01 Sent To PC
Notes
2004-03-25 00:00:00ENGINEER LETTER TO ADDRESS PROVISO.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2004-01-21 Cont ID  
Sent By csiegber Date 2004-02-27 Time 12:19 Rev Time 1.00
Received By jgomez Date 2004-01-21 Time 12:02 Sent To M
Notes
2004-01-21 00:00:00BUILDING REVIEW APPROVED WITH PROVISO:
 1-PROVIDE COMPLETE FLORIDA/SITE SPECIFIC
 PRODUCT APPROVAL FOR ALL DOORS,WINDOWS
 ROOF TILE, GLASS BLOCK, MULLIONS AND
 STRUCTURAL CONNECTORS.
 2-REVISE DETAIL E/4. FASTENER SPECIFIED
 DOESN'T PROVIDE 2" MIN. EMBEDMENT.
 3-PROVIDE ENGINEERING CALCULATIONS FOR
 FASTENERS USED IN TRUSS ANCHOR SCHED.
 SINCE THEY ARE DIFFERENT FROM THOSE
 TESTED AND PUBLISHED BY USP TO COMPLY
 WITH SEC. 1609.4.3 FBC 2001 REGARDING
 STEEL STRESS LIMITATIONS.
 4-REVISE DETAIL A/4. CITED TABLES 6 & 8
 ARE NOT FROM FBC 2001 OR ASCE 7-98.
 5-SHEET #7: A)REVISE DESIGN PRESSURES.
 SEE TABLES 1606.2B & 1606.2E FBC 2001.
 B)DESIGN PRESSURES DON'T MATCH THOSE
 SHOWN ON SHEET #3.
 C)REVISE ALL NOTES ON PORCH FLOOR PLAN
 AND ROOF PLAN REGARDING WOOD BEAM.
 IT WAS CHANGED TO CONCRETE BEAM.
 D)WINDOWS SHOWN ON EXTERIOR ELEVATION
 DON'T MATCH WINDOW SCHEDULE.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2004-01-12 Cont ID  
Sent By csiegber Date 2004-01-16 Time 16:53 Rev Time 2.00
Received By jgomez Date 2004-01-12 Time 11:41 Sent To PC
Notes
2004-01-12 00:00:00BUILDING REVIEW CHECKLIST:
 1-NEED RECORDED NOTICE OF COMMENCEMENT.
 2-PROVIDE FLORIDA/SITE SPECIFIC PRODUCT
 APPROVAL FOR:
 A)HORIZONTAL SLIDER WINDOW. NEED THE
 APPROVED DRAWINGS.
 B)GLASS BLOCK.
 C)ROOF TILE (APPROVAL IS PENDING).
 D)SINGLE HUNG WINDOWS.
 E)ENTRY DOOR WITH SIDELITE ASSEMBLY.
 F)SLIDING GLASS DOORS.
 G)WINDOW MULLIONS.
 H)TRUSS CONNECTORS.
  
 3-ARCHITECT TO HAVE ALL HIS INFORMATION
 ON TITLE BLOCK AS REQUIRED BY CHAPTER
 481 FLORIDA STATUTES.
 4- 1HR FIRE RATED GLASS BLOCK ASSEMBLY
 NEED SPECIFIC UL LISTED ASSEMBLY AND
 REVISE DETAIL TO INCLUDE ALL REQUIRED
 COMPONENTS OF SUCH ASSEMBLY. SECTION
 104.2.1.2 CITY AMENDMENTS TO FBC 2001.
 5-CLARIFY GARAGE DOOR BUCK SPECS. DETAIL
 E/4 AND NOTES ON DWG #2 DON'T MATCH.
 CHECK SIZE OF FASTENER. SEC.104.2.1.2
 CITY AMENDMENTS TO FBC 2001.
 6-REVISE/UPDATE TRUSS ANCHOR SCHEDULE &
 ALL DETAILS THAT ARE AFFECTED BY SEC.
 1609.4.3 FBC 2001.
 B)SPECIFY SIZE OF USP RT ANCHOR TO BE
 USED. SEC. 104.2.1.2 CITY AMENDMENTS.
 7-DESIGNER OF RECORD TO SPECIFY ROOF
 TILE FASTENER AS REQ'D BY SECTION
 104.2.1.1 CITY AMENDMENTS TO FBC 2001.
 8-REVISE WINDOW BUCK DETAIL. SEE SEC.
 1707.4.4.2 FBC 2001 FOR PROPER BUCK
 INSTALLATION.
 9-SHEET #7: A)CLARIFY WHERE IS USP
 EHUH 28-3 TAKEN FROM?. UNABLE TO FIND
 IN THE USP 2003 CATALOGUE.SECTION
 104.2.1.2 CITY AMENDMENTS TO FBC 2001.
 B)MISSING CONNECTOR FOR REAR PORH GIRDER
 TRUSS. SEC. 104.2.1.2 CITY AMENDMENTS.
 C)CLARIFY CALCULATED DESIGN PRESSURES.
 WHY SAME FOR DIFFERENT OPENING SIZE &
 LOCATION. SEC.104.2.1.2 CITY AMENDMENT
 D)SHOW TYPE OF WINDOW ON REAR ELEVATION.
 SEE WINDOW SCHEDULE.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ AT 805-6712.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2004-01-06 Cont ID  
Sent By jleech Date 2004-01-03 Time 10:27 Rev Time 0.33
Received By dpalmer Date 2004-01-06 Time 07:27 Sent To Z
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2004-02-27 Cont ID  
Sent By csiegber Date 2004-02-27 Time 12:19 Rev Time 0.00
Received By csiegber Date 2004-02-27 Time 12:19 Sent To B
Notes
2004-02-27 00:00:00TO JG DESK/SUBMITTALS

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2004-01-16 Cont ID  
Sent By csiegber Date 2004-01-16 Time 16:53 Rev Time 0.00
Received By csiegber Date 2004-01-16 Time 16:52 Sent To B
Notes
2004-01-16 00:00:00TO JG DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2004-01-12 Cont ID  
Sent By mmclean Date 2004-01-12 Time 12:22 Rev Time 0.00
Received By jgomez Date 2003-12-24 Time 13:16 Sent To PC
Notes
2003-12-29 00:00:0012/24/03 TO Z
 12/29/03 TO E

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2004-01-23 Cont ID  
Sent By pkrauss Date 2004-01-23 Time 11:49 Rev Time 0.25
Received By pkrauss Date 2004-01-23 Time 11:49 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2004-01-06 Cont ID  
Sent By jgomez Date 2004-01-21 Time 12:02 Rev Time 0.33
Received By pkrauss Date 2004-01-06 Time 13:07 Sent To B
Notes
2004-01-06 00:00:00DENIED:
 RETURN AIR JUMPER FROM THE MASTER
 BEDROOM IS NOT SIZED PROPERLY.ALL AIR
 TO THE MASTER SUITE IS TO BE INCLUDED
 IN THE CALCULATION FOR TOTAL SUPPLY
 AIR.RETURN AIR SHALL BE SIZED
 ACCORDING TO THE TOTAL OF SUPPLY AIR.
 PLEASE REVISE PLANS ACCORDINGLY.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT (561) 805-6719.

Review Stop P PLUMBING
Rev No 1 Status P Date 2004-01-03 Cont ID  
Sent By jleech Date 2004-01-03 Time 10:27 Rev Time 0.25
Received By jleech Date 2004-01-03 Time 10:27 Sent To E
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2004-01-06 Cont ID  
Sent By mmclean Date 2004-01-06 Time 11:53 Rev Time 0.00
Received By mmclean Date 2004-01-06 Time 11:53 Sent To M
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2003-12-24 Cont ID  
Sent By dpalmer Date 2004-01-06 Time 07:27 Rev Time 0.00
Received By mmclean Date 2003-12-24 Time 14:51 Sent To I
Notes
2003-12-24 00:00:00DENIED, NEED TO MEET FRONT SETBACK FOR
 FRONT LOAD GARAGE OF 20 FT CALLED CONTR
 LEFT MSG MM