Plan Review Details - Permit 03110723
Plan Review Stops For Permit 03110723
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2003-12-08 Cont ID  
Sent By dpalmer Date 2003-12-30 Time 16:34 Rev Time 0.50
Received By lsmith Date 2003-12-08 Time 08:41 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-12-30 Cont ID  
Sent By dpalmer Date 2003-12-30 Time 16:34 Rev Time 0.25
Received By dpalmer Date 2003-12-30 Time 16:33 Sent To B
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-11-20 Cont ID  
Sent By kstevens Date 2003-12-30 Time 13:51 Rev Time 0.25
Received By btrobaug Date 2003-11-20 Time 09:59 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-12-16 Cont ID  
Sent By csiegber Date 2003-12-16 Time 15:16 Rev Time 0.00
Received By csiegber Date 2003-12-16 Time 15:16 Sent To P
Notes
2003-12-16 00:00:00TO KS BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-11-20 Cont ID  
Sent By csiegber Date 2003-11-20 Time 07:44 Rev Time 0.00
Received By csiegber Date 2003-11-20 Time 07:44 Sent To E
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-11-17 Cont ID  
Sent By csiegber Date 2003-11-17 Time 09:01 Rev Time 0.00
Received By csiegber Date 2003-11-17 Time 09:01 Sent To Z
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2003-12-30 Cont ID  
Sent By kstevens Date 2003-12-30 Time 13:51 Rev Time 0.50
Received By kstevens Date 2003-12-30 Time 13:37 Sent To E
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2003-12-06 Cont ID  
Sent By csiegber Date 2003-12-16 Time 15:16 Rev Time 0.50
Received By kstevens Date 2003-12-06 Time 18:23 Sent To B
Notes
2003-12-06 00:00:00DENIED
 REFERENCE: FBC-2001 424.2 SWIMMING POOLS
  
 A) PLEASE ADJUST YOUR NOTES, DETAILS, OR
 SUBMITTALS TO REFLECT THE FOLLOWING IN-
 FORMATION REQUIRED FOR PLAN REVIEW
 1) COMPLY WITH FBC-2001 SEC 424.2
 PRIVATE SWIMMING POOLS.
 2) FBC-2001 SEC 424.2.6.1 ENGINEERING
 DESIGN, CONSTRUCTION AND WORKMANSHIP.
 ANSI/NSPI-5. (ADD TO NOTES)
 3) FBC-2001 424.2.9 WATER SUPPLY, LOCAL
 ORD. #2853-95, BACKFLOW REQUIRED ON
 WATER SERVICE. (ADD TO NOTES)
 4) FBC-2001 424.2.12.1 PRESSURE TESTS.
 PER MANUFACTURE RECOMMENDATIONS, NO AIR
 TEST SHALL BE APPROVED FOR PVC PIPE AND
 FITTINGS. (ADD TO NOTES)
 5) FBC-2001 424.2.13.2JOINTS AND CON-
 NECTIONS, FBC PLMG SEC 605.21, PURPLE
 PRIMER REQUIRED ON PVC PIPING. (ADD TO
 NOTES)
 6) FBC02001 424.2.15 GAS PIPING SHALL
 COMPLY WITH FBC FUEL GAS. SEPARATE PLANS
 AND PERMIT REQUIRED.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]

Review Stop Z ZONING
Rev No 1 Status P Date 2003-11-19 Cont ID  
Sent By csiegber Date 2003-11-17 Time 09:01 Rev Time 0.00
Received By mmclean Date 2003-11-19 Time 10:34 Sent To P
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved