Plan Review Details - Permit 03092020
Plan Review Stops For Permit 03092020
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2004-05-03 Cont ID  
Sent By jwitmer Date 2004-05-03 Time 13:19 Rev Time 0.50
Received By jwitmer Date 2004-05-03 Time 13:19 Sent To  
Notes
2004-05-03 00:00:00RELOCATE SHAFT FLOORS 1-2JW

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2004-02-26 Cont ID  
Sent By pkrauss Date 2004-04-15 Time 16:13 Rev Time 0.50
Received By jwitmer Date 2004-02-26 Time 12:24 Sent To  
Notes
2004-02-26 00:00:00REVISION (EFIS)

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-12-04 Cont ID  
Sent By csiegber Date 2004-02-18 Time 08:20 Rev Time 3.00
Received By jwitmer Date 2003-12-04 Time 15:34 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2003-10-30 Cont ID  
Sent By jwitmer Date 2003-10-30 Time 09:43 Rev Time 0.55
Received By jwitmer Date 2003-10-30 Time 09:43 Sent To  
Notes
2003-10-30 00:00:00BUILDING PLAN REVIEW
 PERMIT: 03092020 PHASE 4
 ADD: 630 CLEARWATER PARK DR
 1ST-2ND FL GUESTROOMS
 CONT: WHITIN-TURNER
 TEL: (954)776-0800
 FL BLD CODE= 2001 FLORIDA BUILDING CODE
  
 COMMENTS ARE THE SAME AS PHASE 2-A/2-B.
  
 BUILDING PLAN REVIEW
 JIM WITMER
 TEL: (561)805-6715
 FAX: (561)659-8026

Review Stop E ELECTRICAL
Rev No 7 Status P Date 2004-03-08 Cont ID  
Sent By dpalmer Date 2004-03-08 Time 13:27 Rev Time 0.33
Received By dpalmer Date 2004-03-08 Time 13:27 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 6 Status P Date 2004-03-08 Cont ID  
Sent By dpalmer Date 2004-03-08 Time 13:13 Rev Time 0.33
Received By dpalmer Date 2004-03-08 Time 13:13 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 5 Status P Date 2004-01-28 Cont ID  
Sent By csiegber Date 2004-03-02 Time 09:59 Rev Time 0.50
Received By dpalmer Date 2004-01-28 Time 09:16 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 4 Status F Date 2004-01-13 Cont ID  
Sent By nmccray Date 2004-01-20 Time 13:51 Rev Time 0.33
Received By dpalmer Date 2004-01-13 Time 15:56 Sent To FIRE
Notes
2004-01-13 00:00:00**************** UNSAT ****************
  
 1)NOTE: PLANS DO NOT CONTAIN TITLE
 BLOCK(S) FOR ORIGINAL ENGINEER OF RECORD
 PLANS/LETTERS NOW INDICATE AN ENGINEER--
 -ING FIRM?? PLEASE SEE FS 471 AND FAC
 61G15-23.002
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 CONSTUCTION SERVICES DEPT.
 561-805-6717
 [email protected]

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2003-12-15 Cont ID  
Sent By dpalmer Date 2003-12-15 Time 16:52 Rev Time 0.50
Received By dpalmer Date 2003-12-15 Time 16:52 Sent To B
Notes
2003-12-15 00:00:00SENT TO BLDG FOR PROCESSING.

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2003-12-02 Cont ID  
Sent By csiegber Date 2003-12-09 Time 09:53 Rev Time 0.50
Received By dpalmer Date 2003-12-02 Time 05:46 Sent To  
Notes
2003-12-02 00:00:00*********** UNSAT *****************
  
 PLEASE SEE NOTES FROM PREVIOUS REVIEWS
 AND NOTES REFERENCED UNDER PERMIT
 #03092018 FOR RISER DIAGRAM.
  
 1)NOTE: PLEASE SEE E300. THE CORRETCED
 RISER DIAGRAM HAS NOT BEEN SUBMITTED FOR
 REFERENCE IN THIS PHASE.
 PLEASE PROVIDED CORRECTED RISER DIAGRAM
 THAT IS BELIEVED TO HAVE BEEN SUBMITTED
 IN ANOTHER SET OF PLANS FOR A DIFFERENT
 PHASE??
  
 PLEASE CORRECT RISER FROM PREVIOUS NOTES
 , PLEASE TAKE OUT ALL OLD/VOIDED SHEETS
 AND INSERT NEW SHEETS INTO COMPLETE SETS
 FOR REVIEW AND STAMPING.
 IF THERE ARE ANY QUESTIONS, PLEASE CALL.
  
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2003-10-21 Cont ID  
Sent By dpalmer Date 2003-10-21 Time 10:33 Rev Time 1.00
Received By dpalmer Date 2003-10-21 Time 10:33 Sent To  
Notes
2003-10-21 00:00:00************ UNSAT *****************
  
 1)NOTE: PLEASE SUBMIT PANEL SCHEDULES
 THAT CORRELATE WITH CIRCUIT #'S ON
 PLANS.
  
 2)NOTE: PLEASE SEE THAT THIS PHASE ALSO
 INCLUDES RISER DIAGRAM WHICH HAS COMMENT
 -S UNDER OTHER PHASE(S) ELECTRICAL
 REVIEWS. PLEASE SEE COMMENTS UNDER
 PERMIT # 03092018 FOR RISER COMMENTS.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. PLEASE REMOVE ALL OLD/VOIDED
 SHEETS AND INSERT NEW SHEETS FOR REVIEW
 AND STAMPING OF THREE COMPLETE SETS.
 IF THERE ARE ANY QUESTIONS, PLEASE CALL.
  
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 2004-01-20 Cont ID  
Sent By nmccray Date 2004-01-20 Time 13:51 Rev Time 0.00
Received By nmccray Date 2004-01-20 Time 13:51 Sent To E
Notes
2004-01-20 00:00:00REVISION DATED 01-10-04 SHEET E 250
 PHASE 1A, 1B, 3 & 4
  
 VISUAL STROBE DEVICES ARE TO REMAIN IN
 DEDICATED HANDICAP ROOMS

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2003-11-26 Cont ID  
Sent By dpalmer Date 2004-01-13 Time 15:56 Rev Time 0.00
Received By mcarsill Date 2003-11-26 Time 07:14 Sent To  
Notes
2003-11-26 00:00:00APPROVED PROVISO:
  
 IT STILL APPEARS THAT THE FIRE SPRINKLER
 HEAD IN SUITE # 1 WILL BE BLOCKED BY
 A DOOR. PLEASE CORRECT.
  
 MIKE CARSILLO, ASSISTANT FIRE MARSHAL
 835-2910

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2003-10-28 Cont ID  
Sent By mcarsill Date 2003-10-28 Time 16:45 Rev Time 0.00
Received By mcarsill Date 2003-10-28 Time 16:45 Sent To  
Notes
2003-10-28 00:00:001) TEMPORARY PARTITIONS WHEN ERECTED
 SHALL NOT INTERFERE WITH ANY EXISTING
 FIRE PROTECTION EQUIPMENT.
  
 2) DECORATIVE EIFS STILL SHOWN ON SOME
 OF THE DRAWINGS. PLEASE SEE APPENDIX F.
  
 3) SEPARATE PLANS AND PERMITS REQUIRED
 FOR FIRE ALARM REMODEL.
  
 4) POWER OPERATED DOORS NEAR PORTE
 COCHERE MUST COMPLY WITH POWER
 OPERATED DOORS AND HAVE BREAK-AWAY
 FEATURES.
  
 5) FIRE HEAD ON PAGE MFP-252 DISPLAYS
 A DOOR BLOCKING A SPRINKLER HEAD, SUITE
 TYPE 1.
  
 6) PROVIDE SEPARATE PLANS AND PERMITS
 FOR FIRE SPRINKLER REMODEL.
  
 MIKE CARSILLO, ASSISTANT FIRE MARSHAL
 835-2910

Review Stop I INCOMING/PROCESSING
Rev No 10 Status N Date 2004-09-14 Cont ID  
Sent By csiegber Date 2004-09-14 Time 12:08 Rev Time 0.00
Received By csiegber Date 2004-09-14 Time 12:08 Sent To M
Notes
2004-09-14 00:00:00TO PK BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 9 Status N Date 2004-06-15 Cont ID  
Sent By mjacobs Date 2004-06-15 Time 13:14 Rev Time 0.00
Received By mjacobs Date 2004-06-15 Time 13:13 Sent To M
Notes
2004-06-15 00:00:00TO M BOX/ ADDED DUCT SIZING TO DRAWINGS

Review Stop I INCOMING/PROCESSING
Rev No 8 Status N Date 2004-04-01 Cont ID  
Sent By csiegber Date 2004-04-01 Time 15:01 Rev Time 0.00
Received By csiegber Date 2004-04-01 Time 15:01 Sent To B
Notes
2004-04-01 00:00:00TO JW DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 7 Status N Date 2004-03-02 Cont ID  
Sent By csiegber Date 2004-03-02 Time 09:59 Rev Time 0.00
Received By csiegber Date 2004-03-02 Time 09:59 Sent To E
Notes
2004-03-02 00:00:00TO DP DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2004-03-02 Cont ID  
Sent By csiegber Date 2004-03-02 Time 09:55 Rev Time 0.00
Received By csiegber Date 2004-03-02 Time 09:55 Sent To E
Notes
2004-03-02 00:00:00TO DP DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2004-02-18 Cont ID  
Sent By csiegber Date 2004-02-18 Time 08:20 Rev Time 0.00
Received By csiegber Date 2004-02-18 Time 08:20 Sent To B
Notes
2004-02-18 00:00:00TO JW DESK/SUBMITTALS

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2004-01-13 Cont ID  
Sent By csiegber Date 2004-01-13 Time 08:43 Rev Time 0.00
Received By csiegber Date 2004-01-13 Time 08:43 Sent To  
Notes
2004-01-13 00:00:00TO COMM BD#25

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-12-09 Cont ID  
Sent By csiegber Date 2003-12-09 Time 09:53 Rev Time 0.00
Received By csiegber Date 2003-12-09 Time 09:53 Sent To E
Notes
2003-12-09 00:00:00TO DP DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-11-17 Cont ID  
Sent By csiegber Date 2003-11-17 Time 14:40 Rev Time 0.00
Received By csiegber Date 2003-11-17 Time 14:40 Sent To  
Notes
2003-11-17 00:00:00TO COMM BD#58/PLANS ON RACK "MARRIOTT"

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-11-03 Cont ID  
Sent By pkrauss Date 2003-11-03 Time 08:38 Rev Time 0.00
Received By pkrauss Date 2003-10-01 Time 09:42 Sent To  
Notes
2003-10-01 00:00:00COMM BD#2/ON RACK

Review Stop M MECHANICAL (A/C)
Rev No 7 Status P Date 2004-10-20 Cont ID  
Sent By pkrauss Date 2004-10-20 Time 14:47 Rev Time 0.25
Received By pkrauss Date 2004-10-20 Time 14:47 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 6 Status N Date 2004-09-21 Cont ID  
Sent By pkrauss Date 2004-09-21 Time 08:37 Rev Time 0.55
Received By pkrauss Date 2004-09-21 Time 07:38 Sent To  
Notes
2004-09-21 00:00:00CALLED CONTRACTOR/PER CONVERSATION WITH
 ERICA, NEED PERMIT # THAT GIVES THE
 SEQUENCE OF OPERATION FOR THE SMOKE
 EVAC SYSTEM. WAITING FOR RESPONSE.

Review Stop M MECHANICAL (A/C)
Rev No 5 Status P Date 2004-04-15 Cont ID  
Sent By csiegber Date 2004-09-14 Time 12:08 Rev Time 1.20
Received By pkrauss Date 2004-04-15 Time 16:01 Sent To B
Notes
2004-04-15 00:00:00REVISION FOR FRESH AIR DUCT & SMOKE
 EXHAUST DUCT (SHAFT DETAIL) FOR PHASE
 4, 1B, 1A, & 3.

Review Stop M MECHANICAL (A/C)
Rev No 4 Status P Date 2004-04-13 Cont ID  
Sent By pkrauss Date 2004-04-13 Time 10:22 Rev Time 0.40
Received By pkrauss Date 2004-04-13 Time 10:00 Sent To B
Notes
2004-04-13 00:00:00PROVISO:

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2004-02-23 Cont ID  
Sent By pkrauss Date 2004-02-23 Time 06:41 Rev Time 0.40
Received By pkrauss Date 2004-02-23 Time 06:41 Sent To  
Notes
2004-02-23 00:00:00REVISIONS:
 FC-6 ADDIONAL SUPPLY DUCT TO REPLACE (2)
 FC-7 (EXCERCISE RM); FC-10 REPLACING (1)
 FC-7 (TOILET RM).

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2003-11-24 Cont ID  
Sent By pkrauss Date 2003-11-24 Time 15:57 Rev Time 0.25
Received By pkrauss Date 2003-11-24 Time 15:57 Sent To  
Notes
2003-11-24 00:00:00PLANS APPROVED 10-31-03 PHK

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-11-03 Cont ID  
Sent By pkrauss Date 2003-10-31 Time 16:10 Rev Time 1.15
Received By pkrauss Date 2003-10-31 Time 16:10 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2003-12-05 Cont ID  
Sent By pschmitz Date 2003-12-05 Time 10:09 Rev Time 1.00
Received By pschmitz Date 2003-12-05 Time 10:08 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2003-10-27 Cont ID  
Sent By kstevens Date 2003-10-27 Time 17:53 Rev Time 0.50
Received By kstevens Date 2003-10-27 Time 17:53 Sent To  
Notes
2003-10-27 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 CHAPTER 1
 FBC-2001 CHAPTER 11
 FLORIDA ADMINISTRATIVE CODE
  
 1) INDICATE ON FLOOR PLAN ROOM THAT WILL
 BE ACCESSIBLE ECT. SECTION 104.2.1
 2) 61G15-23.002(1) DATE REQUIRED ON SEAL
 OF ENGINEER.
 3) SHT MP-102 VENDING ROOM STATES "SEE
 RISER DIAGRAM" NONE FOUND ON PLANS.
 PLEASE CLAIRFY. SEC 104.2.1
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]