Plan Review Stops For Permit 03092018 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2004-02-26 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-03-25 |
Time |
10:21 |
Rev Time |
0.50 |
Received By |
jwitmer |
Date |
2004-02-26 |
Time |
12:23 |
Sent To |
|
|
Notes |
2004-02-26 00:00:00 | REVISION (EFIS) |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2003-12-03 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-02-18 |
Time |
08:18 |
Rev Time |
3.00 |
Received By |
jwitmer |
Date |
2003-12-03 |
Time |
10:08 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2003-10-29 |
|
|
Cont ID |
|
Sent By |
jwitmer |
Date |
2003-10-29 |
Time |
14:41 |
Rev Time |
2.00 |
Received By |
jwitmer |
Date |
2003-10-29 |
Time |
14:40 |
Sent To |
|
|
Notes |
2003-10-29 00:00:00 | BUILDING PLAN REVIEW | | PERMIT: 03092018 PHASE 2B | | ADD: 630 CLEARWATER PARK RD | | 1ST FL- PHASE 2B | | CONT: WHITING-TURNER | | TEL: (954)776-0800 | | FL BLD CODE= 2001 FLORIDA BUILDING CODE | | | | 1)1606.1.4(1) IN WIND BORNE DEBRIS | | REGIONS, EXTERIOR GLAZING THAT RECEIVES | | POSITIVE PRESSURE IN BUILDINGS SHALL BE | | ASSUMED TO BE OPENINGS UNLESS SUCH | | GLAZING IS IMPACT RESISTANT OR PROTECTED | | WITH AN IMPACT RESISTANT COVERING MEET- | | ING THE REQUIREMENTS OF SSTD 12, ASTM | | E 1886 AND ASTM E 1996 OR MIAMI-DADE. | | | | 1) GLAZED OPENINGS LOCATED WITHIN 30 FT | | OF GRADE SHALL MEET THE REQUIREMENTS OF | | LARGE MISSLE TEST. | | MISSING ALL PRODUCT APPROVALS INCLUDING | | ROOFING ASSEMBLIES! | | FL BLD CODE 1606.1.5: COMPONENTS & | | CLADDING, PROVIDE 2 COPIES(3 IF THRESH- | | OLD OR RESIDENT INSPECTOR) OF PRODUCT | | TESTING REPORT, SBCCI OR DADE COUNTY | | REPORT ARE ACCEPTED. | | | | 2) 1707.4.4.2 TAPERED BUCKS: | | SHALL EXTEND BEYOND THE INTERIOR FACE | | OF THE WINDOW OR DOOR FRAME SUCH THAT | | FULL SUPPORT OF THE FRAME IS SUPPORTED. | | | | 3) 1707.4.3 EACH EXTERIOR DOOR | | ASSEMBLY NOT COVERED BY 1707.4.2 | | (GLAZED DOORS) SHALL BE LISTED AND TEST- | | ED FOR A PERIOD EQUAL TO THE QUANITY | | 3600/ V WHERE THE TIME PERIOD IS IN | | SECTIONS AND V IS IN MILES PER HR TAKEN | | FROM FIGURE 1606. THE TIME PERIOD SHALL | | ALSO INCLUDE A 10 SECOND PERIOD AT A | | LOAD EQUAL TO 1.5 TIMES THE DESIGN | | PRESSURE. DADE COUNTY & SBCCI REPORTS | | ARE ACCEPTED. | | | | 4)1707.4.5.1 MULLIONS OCCURRING | | BETWEEN INDIVIDUAL WINDOW AND GLASS | | DOOR ASSEMBLIES. TESTING REPORTS ARE | | REQUIRED BY AN APPROVED TESTING | | LABORATORY OR BE ENGINEERED. | | | | 5)1707.4.5.2 MULLIONS SHALL BE DESIGN- | | ED TO TRANSFER THE DESIGN PRESSURE LOADS | | APPLIED BY THE WINDOW OR DOOR ASSEMBLIES | | TO THE ROUGH OPENING SUBTRATE. | | | | 6)1204.2 SURROUNDING MATERIALS; | | THE WALLS & FLOORS OF ALL PUBLIC REST- | | ROOMS SHALL BE LINED WITH NONABSORBANT | | MATERIALS TO A HEIGTH OF 4'-0" ABOVE THE | | FLOOR. | | | | 7) EFIS SYSTEMS, EXTERIOR WALL COVERING: | | ARE TO COMPLY WITH 2603.6 (1-7). | | | | BUILDING PLAN REVIEW | | JIM WITMER | | TEL: (561)805-6715 | | FAX: (561)659-8026 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
6 |
Status |
N |
Date |
2004-04-15 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2004-04-15 |
Time |
07:26 |
Rev Time |
0.25 |
Received By |
dpalmer |
Date |
2004-04-15 |
Time |
07:26 |
Sent To |
|
|
Notes |
2004-04-15 00:00:00 | PLANS ALREADY REVIEWED UNDER PERMIT # | | 04031253 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
5 |
Status |
P |
Date |
2004-03-08 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-04-14 |
Time |
15:35 |
Rev Time |
1.00 |
Received By |
dpalmer |
Date |
2004-03-08 |
Time |
16:02 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
4 |
Status |
P |
Date |
2004-03-08 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2004-03-08 |
Time |
12:44 |
Rev Time |
0.33 |
Received By |
dpalmer |
Date |
2004-03-08 |
Time |
12:44 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
F |
Date |
2004-01-13 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-03-02 |
Time |
10:06 |
Rev Time |
0.33 |
Received By |
dpalmer |
Date |
2004-01-13 |
Time |
15:51 |
Sent To |
FIRE |
|
Notes |
2004-01-13 00:00:00 | **************UNSAT *************** | | | | 1)NOTE: PLEASE SEE LETTERS FROM ENGINEER | | OF RECORD. THESE NEW LETTERS NOW CONTAIN | | A TITLE BLOCK FOR AN ENGINEERING FIRM?? | | TITLE BLOCK(S) NOW SHOW ARE NOT PART OF | | THE ORIGINAL REVIEW OR PLANS. | | PLEASE SEE FS 471.025 AND FAC 61G15-23. | | 002. | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | REVIEW. IF THERE ARE ANY QUESTIONS, | | PLEASE DO NOT HESITATE TO CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | CITY OF WEST PALM BEACH | | CONSTUCTION SERVICES DEPT. | | 561-805-6717 | | [email protected] |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2003-12-02 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-12-02 |
Time |
06:08 |
Rev Time |
0.50 |
Received By |
dpalmer |
Date |
2003-12-02 |
Time |
06:08 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2003-10-21 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-10-21 |
Time |
09:06 |
Rev Time |
1.50 |
Received By |
dpalmer |
Date |
2003-10-21 |
Time |
09:05 |
Sent To |
|
|
Notes |
2003-10-21 00:00:00 | ************** UNSAT ************** | | | | 1)NOTE: PLEASE CORRELATE RISER DIAGRAM. | | SHOWS FEED TO NEW HV-1 AS 400A AND NOTE | | MENTIONS NEW 200A?? | | | | 2)NOTE: PLEASE ALSO SHOW GROUNDING | | ATTACHMENT PER 250.30 FOR TRANSFORMERS. | | | | 3)NOTE: PLEASE PROVIDE LOAD CALCULATIONS | | FOR ADDITION OF NEW EQUIPMENT TO EXIST- | | -ING MDP-1. 215.5/220 | | | | PLEASE SEE COMMENTS FROM OTHER REVIEWERS | | THAT MAY HAVE AFFECT ON ELECTRICAL PLANS | | | | | | PLEASE SUBMITTHE ABOVE INFORMATION FOR | | REVIEW. IF THERE ARE ANY QUESTIONS, | | PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-805-6717 | | [email protected] |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
P |
Date |
2004-04-12 |
|
|
Cont ID |
|
Sent By |
mamini |
Date |
2004-04-12 |
Time |
09:53 |
Rev Time |
0.50 |
Received By |
mamini |
Date |
2004-04-12 |
Time |
09:53 |
Sent To |
|
|
Notes |
2004-04-12 00:00:00 | PASSED: | | 1. REVIEWED FOR ADDING PAVERS AT PORTE | | COCHERE. | | IF ANY QUESTION PLEASE CONTACT 805-6723 | | MOHAMMAD R. AMINI |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
P |
Date |
2003-11-26 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2004-01-13 |
Time |
15:51 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2003-11-26 |
Time |
07:16 |
Sent To |
|
|
Notes |
2003-11-26 00:00:00 | 1) PROVIDE SEPARATE PLANS AND PERMITS | | FOR NEW HOOD, DUCT, AND FIRE | | SUPPRESSION SYSTEM. | | | | 2) PROVIDE SEPARATE PLANS AND PERMITS | | FOR NEW FIRE ALARM EQUIPMENT PLANNED | | FOR THE FIRST FLOOR. | | | | 3) PROVIDE SEPARATE PLANS AND PERMITS | | FOR NEW FIRE SPRINKLER SYSTEM | | EQUIPMENT. | | | | MIKE CARSILLO, ASSISTANT FIRE MARSHAL | | 835-2910 |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
P |
Date |
2003-10-31 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2003-10-31 |
Time |
07:13 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2003-10-31 |
Time |
07:13 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
10 |
Status |
N |
Date |
2004-04-14 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-04-14 |
Time |
15:35 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-04-14 |
Time |
15:35 |
Sent To |
E |
|
Notes |
2004-04-14 00:00:00 | TO DP DESK/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
9 |
Status |
N |
Date |
2004-03-25 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-03-25 |
Time |
10:21 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-03-25 |
Time |
10:21 |
Sent To |
B |
|
Notes |
2004-03-25 00:00:00 | TO JW DESK/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
8 |
Status |
N |
Date |
2004-03-03 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-03-03 |
Time |
09:29 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-03-03 |
Time |
09:29 |
Sent To |
P |
|
Notes |
2004-03-03 00:00:00 | TO KS BOX/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
7 |
Status |
N |
Date |
2004-03-02 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-03-02 |
Time |
11:13 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-03-02 |
Time |
11:13 |
Sent To |
M |
|
Notes |
2004-03-02 00:00:00 | TO PK BOX/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
6 |
Status |
N |
Date |
2004-03-02 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-03-02 |
Time |
10:07 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-03-02 |
Time |
10:07 |
Sent To |
M |
|
Notes |
2004-03-02 00:00:00 | TO PK DESK/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
2004-03-02 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-03-02 |
Time |
10:06 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-03-02 |
Time |
10:06 |
Sent To |
E |
|
Notes |
2004-03-02 00:00:00 | TO DP DESK/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2004-02-25 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-02-25 |
Time |
15:20 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-02-25 |
Time |
15:20 |
Sent To |
E |
|
Notes |
2004-02-25 00:00:00 | TO DP DESK/PHASE 2B - E |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2004-02-18 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-02-18 |
Time |
08:18 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-02-18 |
Time |
08:18 |
Sent To |
B |
|
Notes |
2004-02-18 00:00:00 | TO JW DESK/SUBMITTALS |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2003-11-12 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-11-12 |
Time |
14:59 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-11-12 |
Time |
14:59 |
Sent To |
|
|
Notes |
2003-11-12 00:00:00 | TO COMM BD#1 /RACK/RESUB |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2003-11-03 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2003-11-03 |
Time |
08:40 |
Rev Time |
0.00 |
Received By |
pkrauss |
Date |
2003-10-01 |
Time |
09:42 |
Sent To |
|
|
Notes |
2003-10-01 00:00:00 | COMM BD#2/ON RACK |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
4 |
Status |
P |
Date |
2004-03-09 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2004-03-09 |
Time |
14:49 |
Rev Time |
1.10 |
Received By |
pkrauss |
Date |
2004-03-09 |
Time |
12:38 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
3 |
Status |
P |
Date |
2004-02-23 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-03-02 |
Time |
11:13 |
Rev Time |
0.40 |
Received By |
pkrauss |
Date |
2004-02-23 |
Time |
06:54 |
Sent To |
|
|
Notes |
2004-02-23 00:00:00 | REVISION: | | SK-M150-1 1ST FL MODIFY CFM DISTRIBUTION | | IN RESTAURANT & SIZING NEW SUPPLY DUCT | | | | SK-M150-2 1ST FL MODIFY CFM DISTRIBUTION | | IN RESTAURANT & SIZING RETURN DUCT. | | | | SK-M150-3 1ST FL REVISED ROUTING OF DUCT | | WORK IN THE LOUNGE | | | | SKM-151-1 1ST FL REVISED DUCT ROUNTING | | IN THE LOBBY. | | | | RFI 183 VAV CLARIFICATION. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
P |
Date |
2003-11-24 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2003-11-24 |
Time |
15:49 |
Rev Time |
0.25 |
Received By |
pkrauss |
Date |
2003-11-24 |
Time |
15:49 |
Sent To |
|
|
Notes |
2003-11-24 00:00:00 | PLANS APPROVED 10-31-03 PHK |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
P |
Date |
2003-10-31 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2003-10-31 |
Time |
15:59 |
Rev Time |
1.15 |
Received By |
pkrauss |
Date |
2003-10-31 |
Time |
15:57 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
P |
Date |
2004-03-13 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-04-14 |
Time |
15:34 |
Rev Time |
1.00 |
Received By |
kstevens |
Date |
2004-03-13 |
Time |
12:04 |
Sent To |
|
|
Notes |
2004-03-13 00:00:00 | REVISION OK - ADDED BAR AREA PLUMBING |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2003-12-04 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-03-03 |
Time |
09:29 |
Rev Time |
2.00 |
Received By |
pschmitz |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2003-12-04 00:00:00 | PROVISO: SEE SHT MP-301, SHOCK ARRESTOR. | | PES |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2003-10-24 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2003-10-24 |
Time |
16:55 |
Rev Time |
2.50 |
Received By |
kstevens |
Date |
2003-10-24 |
Time |
16:55 |
Sent To |
|
|
Notes |
2003-10-24 00:00:00 | DENIED | | REFERENCE: FBC-2001 PLUMBING | | FBC-2001 CHAPTER 11 | | | | 1) SHTS A/060 & A/061 DEMO NOTE #11, ALL | | CAPPED PLUMBING LINES SHALL BE INSPECTED | | PRIOR TO COVERING. | | 2) SHT A/100 WOMENS TOILET ROOM #027, | | WHERE 6 OR MORE STALLS ARE PROVIDED, IN | | ADDITION TO THE STALL COMPLYING WITH 11- | | 4.17.3, AT LEAST ONE STALL 36" WIDE WITH | | AN OUTWARD SWINGING, SELF-CLOSING DOOR | | AND PARALLEL GRAAB BARS COMPLYING WITH | | FIG. 30(D) AND 11-4.16 SHALL BE PROVIDED | | 3) SHT K-2 PLUMBING NOTES #2 - CONTACT | | RODNEY COMPO, ENVIRONMENTAL COMPLIANCE | | FOR SIZE OF GREASE INTERCEPTOR. UTILITY | | ORD. #29389-96. (561) 837-4074 | | 4) PLANS SHALL BE ROUTED TO THE DEPART- | | MENT OF BUSINESS REGULATION HOTEL AND | | RESTAURANT DIVISION FOR REVIEW PRIOR TO | | SUBMITTING TO CITY FOR PLAN REVIEW. ALL | | REVIEW/WORK SHEETS SHALL ACCOMPANY THE | | PLANS FOR REVIEW. (954) 958-5520 | | SECTION 101.4.7 | | 5) SHTS MP060, MP061, & MP100 ALL CAPPED | | PLUMBING LINES TO BE INSPECTED PRIOR TO | | COVERING. | | 6) SHT MP 301 ALL WATER RISER DIAGRAMS, | | ALL WATER HAMMER ARRESTORS SHALL BE LO- | | CATED NEAR THE FIXTURES IN AN "EFFECTIVE | | RANGE" NOT IN THE CEILING AS SHOWN. PDI- | | WH 201 AND MANUF. INSTALLATION INSTRUCT- | | IONS. UNLESS BOTH WASH MACHINES ARE ON A | | COMMON DROP, BOTH WASH MACHINES WILL RE- | | QUIRE A WATER HAMMER ARRESTOR. | | | | REVIEW BY KEN STEVENS | | (561) 805-6721 | | FAX (561) 653-2692 | | E-MAIL [email protected] |
|
|