Plan Review Stops For Permit 03072336 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2003-08-21 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2003-08-25 |
Time |
15:47 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
2003-08-21 |
Time |
14:37 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
N |
Date |
2003-08-25 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-08-25 |
Time |
15:31 |
Rev Time |
0.50 |
Received By |
dpalmer |
Date |
2003-08-25 |
Time |
15:31 |
Sent To |
|
|
Notes |
2003-08-25 00:00:00 | ******** NONE *********** | | | | PLEASE SUBMIT SEPARATE PLANS AND | | ELECTRICAL PERMIT APPLICATION FOR | | ELECTRICAL WORK. | | NO REVIEW FOR THIS APPLICATION. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2003-08-21 |
|
|
Cont ID |
|
Sent By |
dbaxter |
Date |
2003-08-13 |
Time |
10:46 |
Rev Time |
1.25 |
Received By |
dpalmer |
Date |
2003-08-21 |
Time |
12:30 |
Sent To |
|
|
Notes |
2003-08-21 00:00:00 | **************** UNSAT *************** | | | | 1)NOTE: PLEASE SEE RISER FOR TENNIS CTS. | | PLEASE CLARIFY AND SHOW HOW EXIST 100A | | PANEL IS BEING FED? SHOWS 400A DISC AND | | THAT APPEARS TO FEED SOMETHING ELSE? | | | | 2)NOTE: PLEASE PROVIDE ENGINEERING UNDER | | FBC FOR NEW LT POLES. 140MPH | | | | 3)NOTE: PLEASE SEE EXISTING SERVICE FOR | | PRESS BOX/BATHS. PLEASE SEE LINE AND | | LOADS IN SAME ENCLOSURE, ETC ETC | | LOAD CALCS INCOMPLETE, PANEL SCHEDULE | | AND RISER DIAGRAM DO NOT CORRELATE. | | SHOWS 200A AND 100A ETC. 215.5/240/230 | | ETC. PLEASE SEE CHAPTER 34 OF FBC FOR | | BRINGING EXIST ELEC UP TO CODE. | | 4)NOTE: PLEASE SEE RECEPTS IN BATHS TO | | BE GFI. 210.8 | | | | PLEASE SEE COMMENTS FROM OTHER REVIEWERS | | THAT MAY AFFECT ELECTRICAL PLANS. | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | REVIEW. IF THERE ARE NAY QUESTIONS, | | PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-805-6717 | | [email protected] |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
P |
Date |
2003-08-18 |
|
|
Cont ID |
|
Sent By |
mamini |
Date |
2003-08-18 |
Time |
10:06 |
Rev Time |
1.00 |
Received By |
mamini |
Date |
2003-08-18 |
Time |
10:06 |
Sent To |
|
|
Notes |
2003-08-18 00:00:00 | PASSED WITH PROVISOS: | | 1. POLLUTION / EROSION PLANS MUST BE | | INSTALLED IN FIELD PRIOR TO ANY EARTH/ | | CONSTRUCTION WORK. | | IF ANY QUESTION PLEASE CONTACT 805-6723 | | MOHAMMAD R. AMINI |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
P |
Date |
2003-11-24 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2003-11-24 |
Time |
16:12 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2003-11-24 |
Time |
16:12 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
P |
Date |
2003-08-19 |
|
|
Cont ID |
|
Sent By |
nmccray |
Date |
2003-08-19 |
Time |
16:03 |
Rev Time |
0.00 |
Received By |
nmccray |
Date |
2003-08-19 |
Time |
16:03 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2003-11-18 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-11-18 |
Time |
10:17 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-11-18 |
Time |
10:17 |
Sent To |
|
|
Notes |
2003-11-18 00:00:00 | TO COMM BD#12 |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2003-08-13 |
|
|
Cont ID |
|
Sent By |
dbaxter |
Date |
2003-08-13 |
Time |
10:46 |
Rev Time |
0.00 |
Received By |
dbaxter |
Date |
2003-08-13 |
Time |
10:46 |
Sent To |
E |
|
Notes |
2003-08-13 00:00:00 | TO COMM. BD. #14. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2003-07-31 |
|
|
Cont ID |
|
Sent By |
alange |
Date |
2003-07-31 |
Time |
08:45 |
Rev Time |
0.00 |
Received By |
alange |
Date |
2003-07-31 |
Time |
08:45 |
Sent To |
Z |
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
N |
Date |
2003-08-26 |
|
|
Cont ID |
|
Sent By |
lsmith |
Date |
2003-08-26 |
Time |
07:42 |
Rev Time |
0.00 |
Received By |
lsmith |
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
N |
Date |
2003-08-25 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2003-08-25 |
Time |
15:47 |
Rev Time |
0.50 |
Received By |
kstevens |
Date |
2003-08-25 |
Time |
15:46 |
Sent To |
B |
|
Notes |
2003-08-25 00:00:00 | NO PLUMBING REVIEW, SUBMIT PLANS AND | | SEPARATE APPLICATION FOR PLUMBING. |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2003-08-22 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2003-08-22 |
Time |
10:05 |
Rev Time |
1.00 |
Received By |
kstevens |
Date |
2003-08-22 |
Time |
10:05 |
Sent To |
|
|
Notes |
2003-08-22 00:00:00 | DENIED | | REFERENCE: FBC-2001 PLUMBING | | | | 1) SHT P-1 SANITARY RISER DIAGRAM, THE | | DRINKING FOUNTAINS AND THE URINAL ARE | | NOT VENTED. SECTION 901.2.1 | | 2) PER TABLE 403.1 A SERVICE SINK IS | | REQUIRED. | | 3) FLOORS OF SANITARY FACILITIES SHALL | | BE CONSTRUCTED OF CONCRETE OR OTHER NON- | | ABSORBENT MATERIALS, SHALL HAVE A SMOOTH | | SLIP-RESISTANT FINISH, AND SLOP TO FLOOR | | DRAINS. - FLOOR DRAINS REQUIRED FOR | | HOSEING DOWN TOILET ROOMS. SEC. 403.8.3 | | | | REVIEW BY KEN STEVENS | | (561) 805-6721 | | FAX (561) 653-2692 | | E-MAIL [email protected] |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2003-08-12 |
|
|
Cont ID |
|
Sent By |
ajones |
Date |
2003-08-12 |
Time |
15:47 |
Rev Time |
0.25 |
Received By |
ajones |
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|