Plan Review Details - Permit 03071919
Plan Review Stops For Permit 03071919
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-08-26 Cont ID  
Sent By sthyng Date 2003-08-26 Time 11:58 Rev Time 1.50
Received By sthyng Date 2003-08-26 Time 11:58 Sent To  
Notes
2003-08-26 00:00:00SEPARATE PERMIT FOR SHUTTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2003-08-19 Cont ID  
Sent By csiegber Date 2003-08-25 Time 11:41 Rev Time 1.00
Received By sthyng Date 2003-08-19 Time 17:42 Sent To  
Notes
2003-08-19 00:00:00******CORRECTIONS*******
  
 1.)THE WRONG SQUARE FOOTAGE IS ON THE
 IMPACT FEE STAMP.
  
 2.)ADDITIONAL FEES, $17.83.
  
 3.)PROVIDE A SOILS INVESTIGATION
 REPORT.
  
 4.)A NOTICE OF COMMENCEMENT MUST BE
 FILED WITH THE CLERK OF COURTS BEFORE A
 PERMIT CAN BE ISSUED.
  
 5.)SHEET A5 SPECIFIES A SEMCO
 ATTACHMENT.THIS IS NOT AVAILABLE.
  
 6.)NAILING FOR 4-A5 CONFLICTS WITH
 THE USP 2003 CATALOG.REVISE OR EXPLAIN
 HOW THIS DETAIL MEETS THE DESIGN
 REQUIREMENT OF 2550# UPLIFT.CHECK ALL
 OTHER ATTACHMENTS.
  
 7.)IMPACT PROTECTION IS REQUIRED FOR
 GLAZING, FBC1606.1.7.EITHER PROVIDE
 TWO COPIES OF A HURRICANE SHUTTER
 ATTACHMENT SCHEDULE AND PRODUCT
 APPROVALS OR A SEPARATE PERMIT WILL BE
 REQUIRED.
  
 8.)SUBMIT PRODUCT APPROVALS FOR ALL
 GLAZING, DOORS, ROOF, MULLIONS,SHUTTERS.
 ANY PRODUCT APPROVALS NOT SUBMITTED
 BEFORE THE LAST REVIEW WILL REQUIRE
 SEPARATE PERMITS FOR THOSE ITEMS.
  
 SAMANTHA THYNG, BUILDING PLANS EXAMINER
 [email protected]

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2004-03-09 Cont ID  
Sent By btrobaug Date 2004-03-09 Time 11:29 Rev Time 0.50
Received By btrobaug Date 2004-03-09 Time 11:23 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-08-07 Cont ID  
Sent By csiegber Date 2004-03-04 Time 13:38 Rev Time 0.33
Received By dpalmer Date 2003-08-07 Time 07:25 Sent To M
Notes
2003-08-07 00:00:00REDLINED EVE RECEPTS, TO BE GFI 210.8
 REDLINED 2002 NEC

Review Stop I INCOMING/PROCESSING
Rev No 7 Status N Date 2004-03-17 Cont ID  
Sent By csiegber Date 2004-03-17 Time 11:19 Rev Time 0.00
Received By csiegber Date 2004-03-17 Time 11:19 Sent To P
Notes
2004-03-17 00:00:00TO KS BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2004-03-04 Cont ID  
Sent By csiegber Date 2004-03-04 Time 13:40 Rev Time 0.00
Received By csiegber Date 2004-03-04 Time 13:40 Sent To P
Notes
2004-03-04 00:00:00TO KS BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2004-03-04 Cont ID  
Sent By csiegber Date 2004-03-04 Time 13:38 Rev Time 0.00
Received By csiegber Date 2004-03-04 Time 13:38 Sent To E
Notes
2004-03-04 00:00:00TO BT DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2004-01-20 Cont ID  
Sent By csiegber Date 2004-01-20 Time 16:46 Rev Time 0.00
Received By csiegber Date 2004-01-20 Time 16:46 Sent To M
Notes
2004-01-20 00:00:00TO PK BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-08-25 Cont ID  
Sent By csiegber Date 2003-08-25 Time 11:40 Rev Time 0.00
Received By csiegber Date 2003-08-25 Time 11:40 Sent To B
Notes
2003-08-25 00:00:00TO ST DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-07-29 Cont ID  
Sent By alange Date 2003-07-29 Time 13:39 Rev Time 0.00
Received By alange Date 2003-07-29 Time 13:39 Sent To E
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-07-25 Cont ID  
Sent By mmclean Date 2003-07-29 Time 12:21 Rev Time 0.00
Received By alange Date 2003-07-25 Time 08:59 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2004-01-26 Cont ID  
Sent By hmoser Date 2004-01-26 Time 17:28 Rev Time 0.25
Received By hmoser Date 2004-01-26 Time 17:28 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-08-14 Cont ID  
Sent By csiegber Date 2004-01-20 Time 16:46 Rev Time 0.25
Received By pkrauss Date 2003-08-14 Time 13:29 Sent To P
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status P Date 2004-03-19 Cont ID  
Sent By kstevens Date 2004-03-19 Time 18:25 Rev Time 0.33
Received By kstevens Date 2004-03-19 Time 18:25 Sent To  
Notes
2004-03-19 00:00:00REVISION OK - SANT. RISER DIAGRAM

Review Stop P PLUMBING
Rev No 2 Status F Date 2004-03-10 Cont ID  
Sent By csiegber Date 2004-03-17 Time 11:19 Rev Time 0.50
Received By kstevens Date 2004-03-10 Time 07:51 Sent To  
Notes
2004-03-10 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
  
 SANITARY RISER DIAGRAM DOES NOT REFLECT
 THE FLOOR PLAN. - SEE RED LINE CORRECT-
 IONS AND MAKE CHANGES AND RESUBMIT.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-08-14 Cont ID  
Sent By csiegber Date 2004-03-04 Time 13:40 Rev Time 0.25
Received By jleech Date 2003-08-14 Time 18:36 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2003-07-29 Cont ID  
Sent By alange Date 2003-07-25 Time 09:00 Rev Time 0.00
Received By mmclean Date   Time   Sent To I
Notes
***NONE***