Plan Review Stops For Permit 03071076 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
7 |
Status |
P |
Date |
2004-06-15 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2004-06-15 |
Time |
10:22 |
Rev Time |
1.50 |
Received By |
shill |
Date |
2004-06-15 |
Time |
10:22 |
Sent To |
|
|
Notes |
2004-06-15 00:00:00 | REVISED ALL SHEETS, DATED 6/7/04 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
6 |
Status |
F |
Date |
2004-06-04 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2004-06-14 |
Time |
13:33 |
Rev Time |
2.00 |
Received By |
shill |
Date |
2004-06-04 |
Time |
14:04 |
Sent To |
|
|
Notes |
2004-06-04 00:00:00 | ****CORRECTIONS**** | | | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | [email protected] | | | | REVISION #2, UNDATED | | | | 1.)THIS PERMIT WAS ISSUED WITH A | | PROVISO.PLEASE SUBMIT THE REVISIONS | | AT THIS TIME. | | | | 2.)WHEN RESUBMITTING, DO NOT SUBMIT | | SHEETS WHICH HAVE NOT CHANGED.ALTHOUGH | | A CHANGE IS NOTED ON SHEET A1, I CANNOT | | FIND THE REVISION. | | | | 3.)SHEET A5, SHOW ZONE 3 FOR THE | | HIP ROOF SECTION.ALSO PROVIDE DESIGN | | UPLIFT INFORMATION FOR THE ROOF FRAMING. | | | | 4.)THE SEAL IS REQUIRED TO BE DATED, | | FAC61G15-23.002. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
5 |
Status |
P |
Date |
2003-11-10 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2004-05-25 |
Time |
07:31 |
Rev Time |
2.00 |
Received By |
sthyng |
Date |
2003-11-10 |
Time |
14:57 |
Sent To |
|
|
Notes |
2003-11-10 00:00:00 | ****PROVISO***** | | | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | 561-805-6724 | | | | SUBMIT A REVISION ADDRESSING: | | | | 1.)PROVIDE A STRUCTURAL DETAIL FOR | | THE STAIRS, WITH FIREBLOCK TO COMPLY | | WITH FBC2305.1.SEE ATTACHED CODE | | REFERENCE AND NOTES. REVISE SHEET A6 | | | | 2.)WALL SECTIONS SAY "MATCH EXISTING" | | FOR SOFFIT VENTING; REMOVE THIS | | LANGUAGE AND REPLACE WITH CORRECT | | SOFFIT VENTING SCHEDULE AS PER | | CALCULATIONS.REVISE SHEET A6 | | | | 3.)REVISE WINDOW BUCK DETAIL, 2-G1, | | COMPLY WITH FBC1707.4.4.2, 2003 AMEND. | | REVISE SHEET G1. | | | | 4.)REVISE DETAIL 4-G1 OR PROVIDE SPEC | | SHEET OR TECHNICAL BULLETIN FROM MFGR. | | HC10 NOT IN USP CATALOG; HC IS A WOOD-TO | | -WOOD CONNECTOR, CANNOT USE IN WOOD-TO- | | MASONRY APPLICATION UNLESS APPROVED BY | | MANUFACTURER.REVISE SHEET G1 | | | | 5.)REMOVE TRUSS ANCHOR SCHEDULE AND | | NOTE REGARDING STRESS INCREASE FOR STEEL | | FOR SHEET A5.REVISE SHEET A5, G1. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
F |
Date |
2003-11-08 |
|
|
Cont ID |
|
Sent By |
sthyng |
Date |
2003-11-08 |
Time |
16:46 |
Rev Time |
2.00 |
Received By |
sthyng |
Date |
2003-11-08 |
Time |
16:46 |
Sent To |
|
|
Notes |
2003-11-08 00:00:00 | ****CORRECTIONS**** | | | | SAMANTHA THYNG, BUILDING PLANS EXAMINER | | 561-805-6724 | | | | 1.)SEPARATE PERMITS REQUIRED. | | | | 2.)SEE PREVIOUS CORRECTION LIST, | | ITEMS 4, 6, 7, 8.A 4X THE FEE WILL BE | | CHARGED AS NONE OF THESE ITEMS WERE | | ADDRESSED; SAME PLANS SUBMITTED AS THE | | PREVIOUS REVIEW. | | | | 3.)FIRESTOP REQUIRED ON WALL DETAILS, | | FBC705.3. | | | | 4.)SEE THE PREVIOUS LIST, ITEM #9. NOW | | ONE PLAN HAS THE MULLION PRODUCT | | APPROVAL STAPLED TO IT, THE OTHER HAS | | AN IMPACT CASEMENT WINDOW PRODUCT | | APPROVAL STAPLED TO IT.SUBMIT ALL | | PRODUCT APPROVALS FOR WINDOWS, DOORS, | | ROOF, IMPACT PROTECTION IF REQUIRED. | | ANY PRODUCT APPROVALS NOT SUBMITTED | | BEFORE THE PERMIT IS ISSUED WILL NOT BE | | A PART OF THIS PERMIT AND WILL REQUIRE | | A SEPARATE PERMIT APPLICATION AND FEES | | LATER.SUBMIT TWO COPIES OF ALL | | REQUIRED PRODUCT APPROVALS, AND DO NOT | | SUBMIT PRODUCT APPROVALS WHICH ARE NOT | | NEEDED. | | | | 5.)SEE PREVIOUS LIST, ITEM #10, | | REGARDING ADDITIONAL FEES.WAS THE | | BZ WHICH WAS IN THE PACKAGE PAID?A | | 4X FEE (SEE NOTICE IN REGARDS TO FS | | 553.80(2)(B) FROM LAST REVIEW) IS | | BEING CHARGED AGAIN.PAY BOTH FEES | | BEFORE RESUBMITTAL, AND INCLUDE A COPY | | OF THE PAID BZ RECEIPTS. | | | | 6.)SEE PREVIOUS LIST, ITEM #11.THE | | MECHANICAL PROVISO MUST BE ADDRESSED AT | | THIS TIME. | | | | 7.)DETAIL 4-G1, I WAS UNABLE TO FIND | | HC10 IN THE USP CATALOG.CLARIFY.IF | | A PRODUCT IS SPECIFIED WITH A FASTENING | | SCHEDULE OR APPLICATION WHICH CONFLICTS | | WITH THE CATALOG (HCS ARE WOOD-TO-WOOD | | CONNECTORS, NOT WOOD-TO-MASONRY), SUBMIT | | A SPEC SHEET OR TECHNICAL BULLETIN FROM | | THE MANUFACTURER SHOWING THE APPLICATION | | YOU PROPOSE. | | | | 8.)REMOVE THE TRUSS ANCHOR SCHEDULE | | FROM THE PLAN AS IT HAS BEEN REVISED AND | | IS NO LONGER ACCURATE.ALSO REMOVE THE | | NOTE REGARDING ALLOWABLE STRESS INCREASE | | FROM SHEET A5. | | | | 9.)THE SEAL IS TO BE DATED, FS471.025. | | | | 10.) THERE WERE TWO ENERGY CALCS IN THE | | PACKAGE, NOW THERE IS ONLY ONE.SUBMIT | | THE SECOND COPY. | | | | 11.)WHEN RESUBMITTING, REMOVE OLD | | SHEETS AND REPLACE WITH REVISED SHEETS. | | SUBMIT OLD SHEETS SEPARATELY.THERE | | SHOULD BE TWO COPIES OF ALL DOCUMENTS | | REQUIRED FOR PERMIT. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2003-10-21 |
|
|
Cont ID |
|
Sent By |
sthyng |
Date |
2003-10-20 |
Time |
17:23 |
Rev Time |
2.00 |
Received By |
sthyng |
Date |
2003-10-20 |
Time |
17:23 |
Sent To |
|
|
Notes |
2003-10-20 00:00:00 | *****CORRECTIONS***** | | | | SAMANTHA THYNG, BUILDING PLANS EXAMINER | | [email protected] | | | | 1.)SEPARATE PERMITS REQUIRED. | | | | 2.)THE NOTICE OF COMMENCEMENT IS | | EXPIRED (OVER 90 DAYS, FS713.13). | | | | 3.)SEE PREVIOUS CORRECTION LIST, ITEM | | #3, NOT ADDRESSED.PROVIDE A COPY OF | | THE RECEIPT SHOWING THAT IMPACT FEES | | HAVE BEEN PAID. | | | | 4.)WALL SECTIONS STILL SAY "MATCH | | EXISTING", BUT A6 SHOWS THAT SOFFIT | | VENTS SHOULD BE 7X16 EVERY 12'.IS THIS | | THE EXISTING CONDITION?IF NOT, REVISE | | THE WALL SECTIONS.IF IT IS, MAKE A | | NOTE UNDER THE SOFFIT VENT CALCULATIONS. | | | | 5.)SEE PREVIOUS CORRECTION LIST, ITEM | | #6.AS DISCUSSED, THE MANUFACTURER | | DOES NOT ALLOW STRESS INCREASE FOR | | STEEL.IF THIS WAS THE ONLY ITEM ON THE | | LIST, THE PERMIT WAS TO BE ISSUED WITH | | A PROVISO THAT THE CONNECTOR TABLES BE | | REVISED.AS THERE ARE OTHER ELECTRICAL | | AND STRUCTURAL CORRECTIONS, PLEASE | | REVISE AT THIS TIME. | | | | 6.)SEE PREVIOUS LIST, ITEM #7, FIRE- | | BLOCK REQUIRED AT STAIRS,FBC2305.1.4(3). | | THE DETAIL SHOWN DOES NOT COMPLY WITH | | THE CODE. | | | | 7.)SEE PREVIOUS CORRECTION LIST, ITEM | | #8; 2-G1 WAS NOT CHANGED. | | | | 8.)SEE PREVIOUS LIST, ITEMS 10 AND 11, | | SHOW COMPLIANCE WITH FBC1608.2. | | | | 9.)SEE PREVIOUS LIST, ITEM 12, NOT | | ADDRESSED.MULLION PRODUCT APPROVALS | | ARE STILL STAPLED TO THE PLAN; STILL DO | | NOT SEE WHERE MULLIONS ARE USED ON THIS | | JOB.HOWEVER, THE OTHER PRODUCT | | APPROVALS REQUESTED ARE STILL NOT A PART | | OF THIS PACKAGE.WINDOWS AND IMPACT | | PROTECTION WILL REQUIRE A SEPARATE | | PERMIT IF PRODUCT APPROVALS ARE NOT | | SUBMITTED. | | | | 10.) ADDITIONAL FEES DUE. | | | | 11.) THERE IS A MECHANICAL PROVISO ON | | THE MECHANICAL PAGE.PLEASE ADDRESS | | AT THIS TIME, PER REQUEST OF THE | | MECHANICAL PLAN REVIEWER. | | | | WHEN RESUBMITTING, REPLACE SHEETS WHICH | | HAVE CHANGED WITH THE NEW SHEETS. SUBMIT | | THE OLD SHEETS SEPARATELY, CLEARLY | | MARKED.TO EXPEDITE PLAN REVIEW, | | INCLUDE A TRANSMITTAL SHEET EXPLAINING | | HOW EACH ITEM WAS ADDRESSED. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2003-09-30 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2003-10-16 |
Time |
10:17 |
Rev Time |
0.00 |
Received By |
sthyng |
Date |
2003-09-30 |
Time |
13:03 |
Sent To |
|
|
Notes |
2003-09-30 00:00:00 | ******CORRECTIONS******* | | | | 1) SEE PREVIOUS CORRECTION LIST, #'S 2, | | 4, 5, 7, 8, 9, 10, 11 HAVE NOT BEEN | | ADDRESSED. | | | | 2) PRODUCT APPROVALS WHICH WERE IN THE | | PACKAGE PREVIOUSLY ARE NOW MISSING.IF | | PRODUCT APPROVALS ARE NOT SUBMITTED | | BEFORE THE PERMIT IS ISSUED, SEPARATE | | PERMITS FOR THOSE COMPONENTS WILL BE | | REQUIRED. | | | | 3) THE ENGINEER'S LETTER RE: ASCE 7-98 | | MUST BE SEALED. | | | | SAMANTHA THYNG,BUILDING PLANS EXAMINER | | 561-805 [email protected] |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2003-07-29 |
|
|
Cont ID |
|
Sent By |
jleech |
Date |
2003-09-24 |
Time |
19:34 |
Rev Time |
3.00 |
Received By |
sthyng |
Date |
2003-07-29 |
Time |
17:26 |
Sent To |
|
|
Notes |
2003-07-29 00:00:00 | ******CORRECTIONS******* | | | | SAMANTHA THYNG, BUILDING PLANS EXAMINER | | [email protected] | | | | 1.)SEPARATE PERMITS REQUIRED. | | | | 2.)SIGN THE OWNER/AGENT LINE OF THE | | ENERGY CALC, FBC13-103.1.2. | | | | 3.)PROVIDE THE RECEIPT TO SHOW PAYMENT | | OF THE IMPACT FEES TO PALM BEACH CO. | | | | 4.)SOFFIT VENTS MUST COMPLY WITH | | FBC2309.7. | | | | 5.)DRAFTSTOPPING REQUIRED; SHOW A | | SCHEDULE AND DETAIL, FBC705.3. | | | | 6.)THE TRUSS ANCHOR SCHEDULE HAS | | VALUES FOR ATTACHMENTS WHICH EXCEED THE | | UPLIFT ALLOWED AS PER THE USP 2003 | | CATALOG.SEE PP 6-7, USP CATALOG, | | REGARDING STRESS INCREASES FOR STEEL. | | | | 7.)FIREBLOCK REQUIRED AT THE STAIRS, | | FBC2305.1.4(3). | | | | 8.)WINDOW BUCK DETAIL DOES NOT COMPLY | | WITH FBC1707.4.4.2, 2003 REVISION (G1). | | | | 9.)PROVIDE A STRUCTURAL DETAIL FOR | | THE STAIRS. | | | | 10.) PROVIDE A DETAIL FOR THE HANDRAIL. | | RAIL IS TO COMPLY WITH FBC1608.2.1. | | | | 11.) PROVIDE A DETAIL FOR THE GUARDRAIL; | | MUST COMPLY WITH FBC1608.2.2, FBC CH.10. | | | | 12.)MULLION PRODUCT APPROVALS WERE | | SUBMITTED.THERE WEREN'T ANY DOUBLE | | WINDOWS ON THE PLAN. | | | | 13.) SUBMIT ROOF PRODUCT APPROVALS, OR | | THEY MAY BE SUBMITTED WITH THE ROOF | | PERMIT APPLICATION. | | | | 14.)ADDITIONAL FEES (VALUE ADJUSTMENT, | | RADON); $133.70 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
7 |
Status |
P |
Date |
2004-06-10 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2004-06-10 |
Time |
10:04 |
Rev Time |
0.50 |
Received By |
dpalmer |
Date |
2004-06-10 |
Time |
10:04 |
Sent To |
P |
|
Notes |
2004-06-10 00:00:00 | *** NOTE *** | | | | PLANS REDLINED FOR EXISTING OCP FOR | | AHU'S SHOULD BE VERIFIED AND SHOULD | | MEET 424.3B | | | | PLEASE SEE LETTER FROM ENGINEER ATTACHED | | FOR SIGNATURE VERIFICATION. THIS LETTER | | WAS ONLY NEEDED TO VERIFY LEGAL SIGNAT- | | -URE. THIS LETTER MAY NOT BE USED FOR | | OTHER PROJECTS AS IT ONLY SPECIFIES | | PLANS FOR THIS RESIDENCE. | | THIS LETTER MAY NOT BE PLACED IN | | SIGNATURE FILE FOR FUTURE REFERENCE AS | | IT IS SITE SPECIFIC TO THIS PERMIT ONLY. | | | | ** REDLINED/PRINTED ON TITLE BLOCK | | CERTIFICATE OF AUTHORIZATION # 8623 | | THIS IS NOT PRINTED ON TITLE BLOCK AS | | REQUIREDPER FS 471.023,FAC 61G15-23.00 | | 2. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
6 |
Status |
F |
Date |
2004-05-08 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-06-09 |
Time |
12:56 |
Rev Time |
0.50 |
Received By |
dpalmer |
Date |
2004-05-08 |
Time |
11:44 |
Sent To |
P |
|
Notes |
2004-05-08 00:00:00 | ***********UNSAT **************** | | | | 1)NOTE: PLEASE SEE SIZING OF AWG FOR | | AHU'S, SHOWS #10 W/ 60A OCP. PLEASE SEE | | 310.16, 424.3B ETC. | | THIS HAS BEEN NOTED AND COMMENTED ON | | THE PREVIOUS 4-REVIEWS. PLANS HAVE | | STILL NOT BEEN CORRECTED. ONE SET | | OF PLANS ARE BEING RETAINED FOR POSSIBLE | | REVIEW BY THE FBPE'S . | | PLEASE CORRELATE LOAD CALCULATIONS AND | | PANEL SCHEDULES FOR A/C EQUIPMENT. | | | | PLEASE SUPPLY ADDITIONL NEW SETS FOR | | REVIEW WHEN REVISION IS RESUBMITTED. | | | | 2)NOTE: PLEASE SEE 220.3B4. | | PLEASE SHOW ALL RECESSED LTS BASED ON | | MAX WATTAGE FOR FIXTURE(S). THIS MAY NOT | | BE FIGURED IN W/ 3W/PER SQ FT. | | PLEASE PROVIDE FIXTURE INFORMATION ON | | LEGEND. | | | | | | 3)NOTE: PLANS MUST BE SIGNED WITH A | | SIGNATURE FROM ENGINEER THAT CONTIANS | | A VISABLE FIRST AND LAST NAME. PLANS | | APPEARS TO HAVE INITIALS. IF THIS IS | | ACTUAL SIGNATURE, PLEASE SUBMIT A COPY | | OF LICENSE IN ORDER TO VERIFY LEGAL | | SIGNATURE. FS 471.025, FAC 61G15-23.002 | | PER FBPE'S. THIS VERIFICATION CAN BE | | KEPT IN FILE FOR FUTURE PROJECTS. | | PLANS ALSO MUST BE DATED WHEN SIGNED BY | | ENGINEER. FS 471.025 | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | REVIEW. IF THERE ARE ANY QUESTIONS, | | PLEASE DO NOT HESITATE TO CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | CITY OF WEST PALM BEACH | | CONSTUCTION SERVICES DEPT. | | 561-805-6717 | | [email protected] |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
5 |
Status |
P |
Date |
2003-11-14 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-05-05 |
Time |
14:38 |
Rev Time |
0.00 |
Received By |
sthyng |
Date |
2003-11-14 |
Time |
15:02 |
Sent To |
|
|
Notes |
2003-11-14 00:00:00 | SEE PREVIOUS REVIEW - PASSED W/PROVISOS | | BY DP - FAILED ONLY FOR 4X FEE NOT | | PAID |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
4 |
Status |
F |
Date |
2003-11-06 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-11-06 |
Time |
11:22 |
Rev Time |
1.00 |
Received By |
dpalmer |
Date |
2003-11-06 |
Time |
11:22 |
Sent To |
|
|
Notes |
2003-11-06 00:00:00 | *************** NOTES REDLINED ***** | | | | 1)NOTE: PLEASE SEE PANEL SCHEDULE AND | | LOAD CALCULATIONS. | | AHU'S SHOWN WITH 60A OCP WITH #10 AWG | | AND 30A OCP W/ #6 AWG. PLEASE ALSO SEE | | LOAD CALCS DO NOT INCLUDE ALL A/C LOAD | | SHOWN?? TOTAL OF 3-10KW AND ONE 8KW. | | | | PLEASE SEE THAT PER FBPE PLANS SHOULD | | HAVE A COMPLETE SIGNATURE AS REQ'D UNDER | | FS 471.025. A VISBLE FIRST AND LAST | | NAME SHOULD SIGNED. | | | | PLEASE SEE THAT OLD PLAN WERE NOT TAKEN | | OUT OF SETS AND NEW SHEETS INSERTED AS | | REQUESTED. | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | REVIEW BEFORE ROUGH ELECTRICAL INSPECT- | | -ION IS CALLED IN. IF THERE ARE ANY | | QUESTIONS, PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-805-6717 | | DPALMER@WPB. | | THIS WILL REMAIN IN "F" STATUS UNTIL | | VERIFICATION CAN BE MADE THAT 4X FEE | | FOR PLAN WAS PAID. $1,407.20 WAS DUE | | BEFORE RESUBMITTING PLANS. NOTE WAS TAKE | | N OUT OF COMPUTER??? | | OWES PER FS 553.80(2)(B). |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
F |
Date |
2003-10-09 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-11-04 |
Time |
09:19 |
Rev Time |
1.50 |
Received By |
dpalmer |
Date |
2003-10-09 |
Time |
07:32 |
Sent To |
P |
|
Notes |
2003-10-09 00:00:00 | ************** UNSAT ************** | | | | PLEASE SEE THAT SOME NOTES FROM FIRST | | TWO REVIEWS ARE NOT ADDRESSED. | | PLEASE SEE THAT NOTICE WAS GIVEN TO | | DESIGN PROFESSIONAL(S) ON LAST REVIEW | | REQ'D UNDER FS 553.80(2)(B) | | PLEASE SEE BZ RECEIPT ATTACH FOR FINE | | REQ'D TO BE ASSESSED. THE FEE IS BASED | | ON PLAN REVIEW PORTION OF PERMIT FEE, | | WHICH IS 30% 4X. $1407.20 WHICH IS REQ'D | | TO BE PAID BEFORE NEXT SUBMITTIAL. | | | | 2)NOTE: PLEASE SEE SERVICE ENT CONDUCTOR | | -S STILL BEING SHOWN AT ONLY ONE SET OF | | 3/0'S? THESE ARE RATED FOR A 225A, AS | | PERMITTED UNDER 310.15B6. | | LOAD FOR SERVICE ALONE IS OVER 300A'S. | | THIS IS A 400A SERVICE. | | | | 3)NOTE: PREVIOUS NOTES REQUESTED INFO | | ON TWO MAIN DISC'S SHOWN ARE NEW OR | | EXISTING?, NOW MAINS ARE BEING SHOWN AS | | EXSITING , YET NOTE FOR THESE MENTION; | | IF REQ'D?? PLEASE CLARIFY IF NEW OR NOT? | | | | 4)NOTE: PLEASE SEE 250.66 FOR SIZING OF | | GROUNDING ELECTRODE CONDCUTOR TO BE #2 | | FOR A 400A SERVICE. | | | | 5)NOTE: PLEASE SEE PANEL SCHEDULE, | | BATH CIRCUIT IS NOW NOTED AS BEING | | RELOCATED? HOW IS THIS, IF BATH IS NEW? | | | | 6)NOTE: CORRELATE ALL AWG AND OCP ON | | PANEL SCHEDULE. (DRYER) #12 AWG? | | | | 7)NOTE: PLEASE SEE MISSING GFI RECEPT | | FOR NEW CU. 210.63 | | | | 8)NOTE: PLEASE SEE PANEL SCHEDULE B? | | FIRST AHU IS NOTED AS BEING TWO AT 10KW? | | | | 9)NOTE: PLEASE SEE MISSING REQ'D COLD | | WATER PIPE ON GROUNDING ELECTRODE.250.50 | | | | 10)NOTE: PLEASE SEE COPY OF FS 553.80(2) | | (B) ATTACHED AGAIN. PLEASE SEE THAT IF | | PLANS ARE NOT CORRECTED AND SUBMITTED | | WITH ANY OF THE SAME COMMENTS NEXT TIME, | | AN ADDITIONAL 4X FEE WILL BE ACCESSED | | AND PLANS WILL BE REQ'D TO BE TURNED | | INTO THE THE FBPE. | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | REVIEW. IF THERE ARE ANY QUESTIONS, | | PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-805-6717 | | [email protected] |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
F |
Date |
2003-09-11 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-10-06 |
Time |
10:11 |
Rev Time |
0.33 |
Received By |
dpalmer |
Date |
2003-09-11 |
Time |
06:51 |
Sent To |
P |
|
Notes |
2003-09-11 00:00:00 | ************** UNSAT ***************** | | | | 1)NOTE: PLEASE SEE PLANS, NO CORRECTIONS | | HAVE BEEN MADE? SEE FIRST REVIEW NOTES. | | PLEASE SEE ATTACHED LETTER WITH RESPECT | | TO DESIGN PROFESSIONALS PER FS 553.80(2) | | (B). | | | | 2)NOTE: PLEASE SEE ATTACHED COPIES OF | | BOTH FAC'S 61G1-16.004 FOR ARCH'S AND | | 61G15-23.002 FOR ENGINEER AND INFORMAT- | | -ION REQ'D ON TITLE BLOCKS PER FS'S | | 471 AND 481. | | | | 3)NOTE; PLEASE SEE SEC'S AND FEEDERS, | | # OF CONDUCTORS AND SIZES DO NOT SEEM | | TO CORRELATE W/ NEC. 215.5/310.16 | | | | | | | | PLEASE SUBMIT THE ABOVE INFORMATION AND | | INFORMATION FROM FIRST REVIEW NOTES FOR | | REVIEW. IF THERE ARE ANY QUESTIONS, | | PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-805-6717 | | [email protected] |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2003-07-24 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-09-09 |
Time |
10:36 |
Rev Time |
0.50 |
Received By |
dpalmer |
Date |
2003-07-24 |
Time |
06:26 |
Sent To |
P |
|
Notes |
2003-07-24 00:00:00 | *************** UNSAT ************** | | | | 1)NOTE: PLEASE SEE ATTACHED COPY OF FAC | | 61G1-16.004 FOR MISSING INFORMATION ON | | TITLE BLOCK. | | | | 2)NOTE: PLEASE INCLUDE SD REQ'D ON | | FIRST FLR LEADING TO FLR ABOVE. NFPA-72 | | 8-1.4.2 | | | | 3)NOTE: PLEASE CLARIFY/SHOW REQ'D RECEPT | | FOR A/ COND UNIT(S). 210.63 | | | | 4)NOTE: PLEASE LIST THE REQ'D DEDICATED | | BATH CIRCUIT(S) PER 210.11.C.3/ 210.52D | | #12, 20A | | | | 5)NOTE: PLEASE SEE MANY ITEMS ON | | PANEL SCHEDULE WHERE OCP/WIRE/ AND LOADS | | DO NOT CORRELATE. PLEASE ADJUST. | | 10KW ON 2-P 30'S, 1-P-20'S FOR AHU'S ETC | | | | 6)NOTE: PLEASE CLARIFY IF DISC'S SHOWN | | FOR SERVICE ARE GOING TO BE NEW? | | PANELS ARE SHOWN AS EXISTING. | | AS PER LOCAL AMENDMENTS 210-70, NO MORE | | THAN 8' OF UNPROTECTED CONDUCTORS INSIDE | | BLDG. | | PLEASE ALSO SUBMIT AIC RATINGS FOR MAINS | | IF INDEED NEW. 110.9/215.5 | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | REVIEW. IF THERE ARE ANY QUESTIONS, | | PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-805-6717 | | [email protected] |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
7 |
Status |
N |
Date |
2004-06-09 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-06-09 |
Time |
12:56 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-06-09 |
Time |
12:56 |
Sent To |
E |
|
Notes |
2004-06-09 00:00:00 | TO DP BOX/RESUB |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
6 |
Status |
N |
Date |
2004-05-05 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-05-05 |
Time |
14:38 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-05-05 |
Time |
14:38 |
Sent To |
E |
|
Notes |
2004-05-05 00:00:00 | TO DP DESK/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
2003-11-04 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-11-04 |
Time |
09:19 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-11-04 |
Time |
09:17 |
Sent To |
E |
|
Notes |
2003-11-04 00:00:00 | TO DP DESK/3RD RESUB |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2003-10-06 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-10-06 |
Time |
10:11 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-10-06 |
Time |
10:11 |
Sent To |
E |
|
Notes |
2003-10-06 00:00:00 | TO DP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2003-09-09 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-09-09 |
Time |
10:36 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-09-09 |
Time |
10:36 |
Sent To |
E |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2003-07-21 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-07-21 |
Time |
16:05 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-07-21 |
Time |
16:05 |
Sent To |
E |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2003-07-16 |
|
|
Cont ID |
|
Sent By |
mmclean |
Date |
2003-07-21 |
Time |
12:05 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-07-16 |
Time |
09:36 |
Sent To |
Z |
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
4 |
Status |
P |
Date |
2004-06-14 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2004-06-14 |
Time |
13:33 |
Rev Time |
0.25 |
Received By |
pkrauss |
Date |
2004-06-14 |
Time |
13:32 |
Sent To |
B |
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
3 |
Status |
F |
Date |
2004-05-25 |
|
|
Cont ID |
|
Sent By |
jleech |
Date |
2004-06-12 |
Time |
11:53 |
Rev Time |
0.30 |
Received By |
pkrauss |
Date |
2004-05-25 |
Time |
07:20 |
Sent To |
B |
|
Notes |
2004-05-25 00:00:00 | ******************DENIED**************** | | RETURN AIR IS NOT SIZED PROPERLY.PER | | 2001 FBC(M) 601.4, RETURN AIR SHALL BE | | EQUAL TO THE SUPPLY AIR TO THAT SPACE. | | | | AUXILIARY DRAIN PAN WITH OVERFLOW | | PROTECTION REQUIRED PER 2001 FBC(M) | | 307.2.3. | | | | SEE ALSO COMMENT #3 BY DEWEY PALMER, | | ELECTRICAL PLAN REVIEW & KENNY STEVENS, | | PLUMBING PLAN REVIEW. | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | CONTACT PATTY KRAUSS AT (561)805-6719. | | | | PATTY KRAUSS/MECHANICAL PLAN REVIEW |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
P |
Date |
2003-10-16 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2004-05-24 |
Time |
14:53 |
Rev Time |
0.25 |
Received By |
pkrauss |
Date |
2003-10-16 |
Time |
10:08 |
Sent To |
B |
|
Notes |
2003-10-16 00:00:00 | PROVISO: | | 1.PLEASE NOTE RETURN AIR NOT SIZED | | PROPERLY.PLEASE REVISE TO COMPLY WITH: | | PLEASE NOTE, REVISION TO THE 2001 | | FBC(M) 601.4, EFFECTIVE JUNE 30,2003: | | | | BALANCED AIR RETURN - RETURN/TRANSFER | | SHALL BE 1 1/2 TIMES THE CROSS SECTIONAL | | AREA (SQ INCHES) OF THE SUPPLY DUCT | | ENTERING THE ROOM ITS SERVING & THE | | DOOR HAVING AN UNRESTRICTED 1" UNDERCUT. | | | | ALL SUPPLY AIR INTO THE MASTER SUITE | | SHALL BE INCLUDED. | | | | 2.SUPPLY DUCT NOT SIZED BETWEEN THE | | UNIT AND DISTRIBUTION BOX. | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | CONTACT PATTY KRAUSS AT (561) 805-6719. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
P |
Date |
2003-07-25 |
|
|
Cont ID |
|
Sent By |
jleech |
Date |
2003-10-14 |
Time |
19:33 |
Rev Time |
0.33 |
Received By |
pkrauss |
Date |
2003-07-25 |
Time |
14:43 |
Sent To |
B |
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
5 |
Status |
P |
Date |
2004-06-12 |
|
|
Cont ID |
|
Sent By |
jleech |
Date |
2004-06-12 |
Time |
11:53 |
Rev Time |
0.50 |
Received By |
jleech |
Date |
2004-06-12 |
Time |
11:53 |
Sent To |
M |
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
4 |
Status |
F |
Date |
2004-05-24 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2004-06-10 |
Time |
11:02 |
Rev Time |
0.50 |
Received By |
kstevens |
Date |
2004-05-24 |
Time |
14:50 |
Sent To |
M |
|
Notes |
2004-05-24 00:00:00 | DENIED | | REFERENCE: FLORIDA ADMINISTRATIVE CODE | | FLORIDA STATUTES | | | | THE PERSONAL SEAL, SIGNATURE, AND DATE | | OF THE ARCHITECT SHALL APPEAR ON ALL | | ARCHITECTURAL DOCUMENTS TO BE FILED FOR | | PUBLIC RECORD. INITIALS ARE NOT ACCEPT- | | ABLE AND FIRST AND LAST NAME ARE REQUIR- | | ED PER DBPR. ALSO NO DATE IS AFFIXED ON | | SHEETS. - FAC 61G1-16.003 & FS 481.221. | | | | REVIEW BY KEN STEVENS | | (561) 805-6721 | | FAX (561) 653-2692 | | E-MAIL [email protected] |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
P |
Date |
2003-10-14 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2004-05-08 |
Time |
11:44 |
Rev Time |
0.33 |
Received By |
jleech |
Date |
2003-10-14 |
Time |
19:33 |
Sent To |
M |
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2003-09-24 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-10-09 |
Time |
08:18 |
Rev Time |
0.33 |
Received By |
jleech |
Date |
2003-09-24 |
Time |
19:34 |
Sent To |
B |
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2003-07-24 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-09-11 |
Time |
06:51 |
Rev Time |
0.50 |
Received By |
kstevens |
Date |
2003-07-24 |
Time |
15:24 |
Sent To |
M |
|
Notes |
2003-07-24 00:00:00 | DENIED | | REFERENCE: FBC-2001 PLUMBING | | | | 1) POWDER ROOM SHALL NOT DRAIN THROUGH | | THE VENT FOR THE WASH MACHINE/LAUNDRY | | SINK. SECTION 908.3 READS IN PART. WHERE | | THE FIXTURE DRAINS CONNECT AT DIFFERENT | | LEVELS, THE VENT SHALL CONNECT AS A | | VERTICAL EXTENSION OF THE VERTICAL DRAIN | | THE UPPER FIXTURE SHALL NOT BE A WATER | | CLOSET. POWDER ROOM SHALL TIE IN DOWN- | | STREAM OF THE LAUNDRY ROOM FIXTURES. SEE | | RED LINE CORRECTIONS. | | 2) DATE REQUIRED ON SIGNATURE AND SEAL | | BY ENGINEER. SEE ATTACHED SHEET FOR ANY | | OTHER REQUIREMENTS PER 61G1-16 SEALS AND | | PLANS. | | | | REVIEW BY KEN STEVENS | | (561) 805-6721 | | FAX (561) 653-2692 | | E-MAIL [email protected] |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2003-07-21 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-07-16 |
Time |
09:36 |
Rev Time |
1.00 |
Received By |
mmclean |
Date |
|
Time |
|
Sent To |
I |
|
Notes |
|
|