Plan Review Details - Permit 03071076
Plan Review Stops For Permit 03071076
Review Stop B BUILDING (STRUCTURAL)
Rev No 7 Status P Date 2004-06-15 Cont ID  
Sent By shill Date 2004-06-15 Time 10:22 Rev Time 1.50
Received By shill Date 2004-06-15 Time 10:22 Sent To  
Notes
2004-06-15 00:00:00REVISED ALL SHEETS, DATED 6/7/04

Review Stop B BUILDING (STRUCTURAL)
Rev No 6 Status F Date 2004-06-04 Cont ID  
Sent By pkrauss Date 2004-06-14 Time 13:33 Rev Time 2.00
Received By shill Date 2004-06-04 Time 14:04 Sent To  
Notes
2004-06-04 00:00:00****CORRECTIONS****
  
 SAMANTHA HILL, BUILDING PLANS EXAMINER
 [email protected]
  
 REVISION #2, UNDATED
  
 1.)THIS PERMIT WAS ISSUED WITH A
 PROVISO.PLEASE SUBMIT THE REVISIONS
 AT THIS TIME.
  
 2.)WHEN RESUBMITTING, DO NOT SUBMIT
 SHEETS WHICH HAVE NOT CHANGED.ALTHOUGH
 A CHANGE IS NOTED ON SHEET A1, I CANNOT
 FIND THE REVISION.
  
 3.)SHEET A5, SHOW ZONE 3 FOR THE
 HIP ROOF SECTION.ALSO PROVIDE DESIGN
 UPLIFT INFORMATION FOR THE ROOF FRAMING.
  
 4.)THE SEAL IS REQUIRED TO BE DATED,
 FAC61G15-23.002.

Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status P Date 2003-11-10 Cont ID  
Sent By pkrauss Date 2004-05-25 Time 07:31 Rev Time 2.00
Received By sthyng Date 2003-11-10 Time 14:57 Sent To  
Notes
2003-11-10 00:00:00****PROVISO*****
  
 SAMANTHA HILL, BUILDING PLANS EXAMINER
 561-805-6724
  
 SUBMIT A REVISION ADDRESSING:
  
 1.)PROVIDE A STRUCTURAL DETAIL FOR
 THE STAIRS, WITH FIREBLOCK TO COMPLY
 WITH FBC2305.1.SEE ATTACHED CODE
 REFERENCE AND NOTES. REVISE SHEET A6
  
 2.)WALL SECTIONS SAY "MATCH EXISTING"
 FOR SOFFIT VENTING; REMOVE THIS
 LANGUAGE AND REPLACE WITH CORRECT
 SOFFIT VENTING SCHEDULE AS PER
 CALCULATIONS.REVISE SHEET A6
  
 3.)REVISE WINDOW BUCK DETAIL, 2-G1,
 COMPLY WITH FBC1707.4.4.2, 2003 AMEND.
 REVISE SHEET G1.
  
 4.)REVISE DETAIL 4-G1 OR PROVIDE SPEC
 SHEET OR TECHNICAL BULLETIN FROM MFGR.
 HC10 NOT IN USP CATALOG; HC IS A WOOD-TO
 -WOOD CONNECTOR, CANNOT USE IN WOOD-TO-
 MASONRY APPLICATION UNLESS APPROVED BY
 MANUFACTURER.REVISE SHEET G1
  
 5.)REMOVE TRUSS ANCHOR SCHEDULE AND
 NOTE REGARDING STRESS INCREASE FOR STEEL
 FOR SHEET A5.REVISE SHEET A5, G1.

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status F Date 2003-11-08 Cont ID  
Sent By sthyng Date 2003-11-08 Time 16:46 Rev Time 2.00
Received By sthyng Date 2003-11-08 Time 16:46 Sent To  
Notes
2003-11-08 00:00:00****CORRECTIONS****
  
 SAMANTHA THYNG, BUILDING PLANS EXAMINER
 561-805-6724
  
 1.)SEPARATE PERMITS REQUIRED.
  
 2.)SEE PREVIOUS CORRECTION LIST,
 ITEMS 4, 6, 7, 8.A 4X THE FEE WILL BE
 CHARGED AS NONE OF THESE ITEMS WERE
 ADDRESSED; SAME PLANS SUBMITTED AS THE
 PREVIOUS REVIEW.
  
 3.)FIRESTOP REQUIRED ON WALL DETAILS,
 FBC705.3.
  
 4.)SEE THE PREVIOUS LIST, ITEM #9. NOW
 ONE PLAN HAS THE MULLION PRODUCT
 APPROVAL STAPLED TO IT, THE OTHER HAS
 AN IMPACT CASEMENT WINDOW PRODUCT
 APPROVAL STAPLED TO IT.SUBMIT ALL
 PRODUCT APPROVALS FOR WINDOWS, DOORS,
 ROOF, IMPACT PROTECTION IF REQUIRED.
 ANY PRODUCT APPROVALS NOT SUBMITTED
 BEFORE THE PERMIT IS ISSUED WILL NOT BE
 A PART OF THIS PERMIT AND WILL REQUIRE
 A SEPARATE PERMIT APPLICATION AND FEES
 LATER.SUBMIT TWO COPIES OF ALL
 REQUIRED PRODUCT APPROVALS, AND DO NOT
 SUBMIT PRODUCT APPROVALS WHICH ARE NOT
 NEEDED.
  
 5.)SEE PREVIOUS LIST, ITEM #10,
 REGARDING ADDITIONAL FEES.WAS THE
 BZ WHICH WAS IN THE PACKAGE PAID?A
 4X FEE (SEE NOTICE IN REGARDS TO FS
 553.80(2)(B) FROM LAST REVIEW) IS
 BEING CHARGED AGAIN.PAY BOTH FEES
 BEFORE RESUBMITTAL, AND INCLUDE A COPY
 OF THE PAID BZ RECEIPTS.
  
 6.)SEE PREVIOUS LIST, ITEM #11.THE
 MECHANICAL PROVISO MUST BE ADDRESSED AT
 THIS TIME.
  
 7.)DETAIL 4-G1, I WAS UNABLE TO FIND
 HC10 IN THE USP CATALOG.CLARIFY.IF
 A PRODUCT IS SPECIFIED WITH A FASTENING
 SCHEDULE OR APPLICATION WHICH CONFLICTS
 WITH THE CATALOG (HCS ARE WOOD-TO-WOOD
 CONNECTORS, NOT WOOD-TO-MASONRY), SUBMIT
 A SPEC SHEET OR TECHNICAL BULLETIN FROM
 THE MANUFACTURER SHOWING THE APPLICATION
 YOU PROPOSE.
  
 8.)REMOVE THE TRUSS ANCHOR SCHEDULE
 FROM THE PLAN AS IT HAS BEEN REVISED AND
 IS NO LONGER ACCURATE.ALSO REMOVE THE
 NOTE REGARDING ALLOWABLE STRESS INCREASE
 FROM SHEET A5.
  
 9.)THE SEAL IS TO BE DATED, FS471.025.
  
 10.) THERE WERE TWO ENERGY CALCS IN THE
 PACKAGE, NOW THERE IS ONLY ONE.SUBMIT
 THE SECOND COPY.
  
 11.)WHEN RESUBMITTING, REMOVE OLD
 SHEETS AND REPLACE WITH REVISED SHEETS.
 SUBMIT OLD SHEETS SEPARATELY.THERE
 SHOULD BE TWO COPIES OF ALL DOCUMENTS
 REQUIRED FOR PERMIT.

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2003-10-21 Cont ID  
Sent By sthyng Date 2003-10-20 Time 17:23 Rev Time 2.00
Received By sthyng Date 2003-10-20 Time 17:23 Sent To  
Notes
2003-10-20 00:00:00*****CORRECTIONS*****
  
 SAMANTHA THYNG, BUILDING PLANS EXAMINER
 [email protected]
  
 1.)SEPARATE PERMITS REQUIRED.
  
 2.)THE NOTICE OF COMMENCEMENT IS
 EXPIRED (OVER 90 DAYS, FS713.13).
  
 3.)SEE PREVIOUS CORRECTION LIST, ITEM
 #3, NOT ADDRESSED.PROVIDE A COPY OF
 THE RECEIPT SHOWING THAT IMPACT FEES
 HAVE BEEN PAID.
  
 4.)WALL SECTIONS STILL SAY "MATCH
 EXISTING", BUT A6 SHOWS THAT SOFFIT
 VENTS SHOULD BE 7X16 EVERY 12'.IS THIS
 THE EXISTING CONDITION?IF NOT, REVISE
 THE WALL SECTIONS.IF IT IS, MAKE A
 NOTE UNDER THE SOFFIT VENT CALCULATIONS.
  
 5.)SEE PREVIOUS CORRECTION LIST, ITEM
 #6.AS DISCUSSED, THE MANUFACTURER
 DOES NOT ALLOW STRESS INCREASE FOR
 STEEL.IF THIS WAS THE ONLY ITEM ON THE
 LIST, THE PERMIT WAS TO BE ISSUED WITH
 A PROVISO THAT THE CONNECTOR TABLES BE
 REVISED.AS THERE ARE OTHER ELECTRICAL
 AND STRUCTURAL CORRECTIONS, PLEASE
 REVISE AT THIS TIME.
  
 6.)SEE PREVIOUS LIST, ITEM #7, FIRE-
 BLOCK REQUIRED AT STAIRS,FBC2305.1.4(3).
 THE DETAIL SHOWN DOES NOT COMPLY WITH
 THE CODE.
  
 7.)SEE PREVIOUS CORRECTION LIST, ITEM
 #8; 2-G1 WAS NOT CHANGED.
  
 8.)SEE PREVIOUS LIST, ITEMS 10 AND 11,
 SHOW COMPLIANCE WITH FBC1608.2.
  
 9.)SEE PREVIOUS LIST, ITEM 12, NOT
 ADDRESSED.MULLION PRODUCT APPROVALS
 ARE STILL STAPLED TO THE PLAN; STILL DO
 NOT SEE WHERE MULLIONS ARE USED ON THIS
 JOB.HOWEVER, THE OTHER PRODUCT
 APPROVALS REQUESTED ARE STILL NOT A PART
 OF THIS PACKAGE.WINDOWS AND IMPACT
 PROTECTION WILL REQUIRE A SEPARATE
 PERMIT IF PRODUCT APPROVALS ARE NOT
 SUBMITTED.
  
 10.) ADDITIONAL FEES DUE.
  
 11.) THERE IS A MECHANICAL PROVISO ON
 THE MECHANICAL PAGE.PLEASE ADDRESS
 AT THIS TIME, PER REQUEST OF THE
 MECHANICAL PLAN REVIEWER.
  
 WHEN RESUBMITTING, REPLACE SHEETS WHICH
 HAVE CHANGED WITH THE NEW SHEETS. SUBMIT
 THE OLD SHEETS SEPARATELY, CLEARLY
 MARKED.TO EXPEDITE PLAN REVIEW,
 INCLUDE A TRANSMITTAL SHEET EXPLAINING
 HOW EACH ITEM WAS ADDRESSED.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2003-09-30 Cont ID  
Sent By pkrauss Date 2003-10-16 Time 10:17 Rev Time 0.00
Received By sthyng Date 2003-09-30 Time 13:03 Sent To  
Notes
2003-09-30 00:00:00******CORRECTIONS*******
  
 1) SEE PREVIOUS CORRECTION LIST, #'S 2,
 4, 5, 7, 8, 9, 10, 11 HAVE NOT BEEN
 ADDRESSED.
  
 2) PRODUCT APPROVALS WHICH WERE IN THE
 PACKAGE PREVIOUSLY ARE NOW MISSING.IF
 PRODUCT APPROVALS ARE NOT SUBMITTED
 BEFORE THE PERMIT IS ISSUED, SEPARATE
 PERMITS FOR THOSE COMPONENTS WILL BE
 REQUIRED.
  
 3) THE ENGINEER'S LETTER RE: ASCE 7-98
 MUST BE SEALED.
  
 SAMANTHA THYNG,BUILDING PLANS EXAMINER
 561-805 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2003-07-29 Cont ID  
Sent By jleech Date 2003-09-24 Time 19:34 Rev Time 3.00
Received By sthyng Date 2003-07-29 Time 17:26 Sent To  
Notes
2003-07-29 00:00:00******CORRECTIONS*******
  
 SAMANTHA THYNG, BUILDING PLANS EXAMINER
 [email protected]
  
 1.)SEPARATE PERMITS REQUIRED.
  
 2.)SIGN THE OWNER/AGENT LINE OF THE
 ENERGY CALC, FBC13-103.1.2.
  
 3.)PROVIDE THE RECEIPT TO SHOW PAYMENT
 OF THE IMPACT FEES TO PALM BEACH CO.
  
 4.)SOFFIT VENTS MUST COMPLY WITH
 FBC2309.7.
  
 5.)DRAFTSTOPPING REQUIRED; SHOW A
 SCHEDULE AND DETAIL, FBC705.3.
  
 6.)THE TRUSS ANCHOR SCHEDULE HAS
 VALUES FOR ATTACHMENTS WHICH EXCEED THE
 UPLIFT ALLOWED AS PER THE USP 2003
 CATALOG.SEE PP 6-7, USP CATALOG,
 REGARDING STRESS INCREASES FOR STEEL.
  
 7.)FIREBLOCK REQUIRED AT THE STAIRS,
 FBC2305.1.4(3).
  
 8.)WINDOW BUCK DETAIL DOES NOT COMPLY
 WITH FBC1707.4.4.2, 2003 REVISION (G1).
  
 9.)PROVIDE A STRUCTURAL DETAIL FOR
 THE STAIRS.
  
 10.) PROVIDE A DETAIL FOR THE HANDRAIL.
 RAIL IS TO COMPLY WITH FBC1608.2.1.
  
 11.) PROVIDE A DETAIL FOR THE GUARDRAIL;
 MUST COMPLY WITH FBC1608.2.2, FBC CH.10.
  
 12.)MULLION PRODUCT APPROVALS WERE
 SUBMITTED.THERE WEREN'T ANY DOUBLE
 WINDOWS ON THE PLAN.
  
 13.) SUBMIT ROOF PRODUCT APPROVALS, OR
 THEY MAY BE SUBMITTED WITH THE ROOF
 PERMIT APPLICATION.
  
 14.)ADDITIONAL FEES (VALUE ADJUSTMENT,
 RADON); $133.70

Review Stop E ELECTRICAL
Rev No 7 Status P Date 2004-06-10 Cont ID  
Sent By dpalmer Date 2004-06-10 Time 10:04 Rev Time 0.50
Received By dpalmer Date 2004-06-10 Time 10:04 Sent To P
Notes
2004-06-10 00:00:00*** NOTE ***
  
 PLANS REDLINED FOR EXISTING OCP FOR
 AHU'S SHOULD BE VERIFIED AND SHOULD
 MEET 424.3B
  
 PLEASE SEE LETTER FROM ENGINEER ATTACHED
 FOR SIGNATURE VERIFICATION. THIS LETTER
 WAS ONLY NEEDED TO VERIFY LEGAL SIGNAT-
 -URE. THIS LETTER MAY NOT BE USED FOR
 OTHER PROJECTS AS IT ONLY SPECIFIES
 PLANS FOR THIS RESIDENCE.
 THIS LETTER MAY NOT BE PLACED IN
 SIGNATURE FILE FOR FUTURE REFERENCE AS
 IT IS SITE SPECIFIC TO THIS PERMIT ONLY.
  
 ** REDLINED/PRINTED ON TITLE BLOCK
 CERTIFICATE OF AUTHORIZATION # 8623
 THIS IS NOT PRINTED ON TITLE BLOCK AS
 REQUIREDPER FS 471.023,FAC 61G15-23.00
 2.

Review Stop E ELECTRICAL
Rev No 6 Status F Date 2004-05-08 Cont ID  
Sent By csiegber Date 2004-06-09 Time 12:56 Rev Time 0.50
Received By dpalmer Date 2004-05-08 Time 11:44 Sent To P
Notes
2004-05-08 00:00:00***********UNSAT ****************
  
 1)NOTE: PLEASE SEE SIZING OF AWG FOR
 AHU'S, SHOWS #10 W/ 60A OCP. PLEASE SEE
 310.16, 424.3B ETC.
 THIS HAS BEEN NOTED AND COMMENTED ON
 THE PREVIOUS 4-REVIEWS. PLANS HAVE
 STILL NOT BEEN CORRECTED. ONE SET
 OF PLANS ARE BEING RETAINED FOR POSSIBLE
 REVIEW BY THE FBPE'S .
 PLEASE CORRELATE LOAD CALCULATIONS AND
 PANEL SCHEDULES FOR A/C EQUIPMENT.
  
 PLEASE SUPPLY ADDITIONL NEW SETS FOR
 REVIEW WHEN REVISION IS RESUBMITTED.
  
 2)NOTE: PLEASE SEE 220.3B4.
 PLEASE SHOW ALL RECESSED LTS BASED ON
 MAX WATTAGE FOR FIXTURE(S). THIS MAY NOT
 BE FIGURED IN W/ 3W/PER SQ FT.
 PLEASE PROVIDE FIXTURE INFORMATION ON
 LEGEND.
  
  
 3)NOTE: PLANS MUST BE SIGNED WITH A
 SIGNATURE FROM ENGINEER THAT CONTIANS
 A VISABLE FIRST AND LAST NAME. PLANS
 APPEARS TO HAVE INITIALS. IF THIS IS
 ACTUAL SIGNATURE, PLEASE SUBMIT A COPY
 OF LICENSE IN ORDER TO VERIFY LEGAL
 SIGNATURE. FS 471.025, FAC 61G15-23.002
 PER FBPE'S. THIS VERIFICATION CAN BE
 KEPT IN FILE FOR FUTURE PROJECTS.
 PLANS ALSO MUST BE DATED WHEN SIGNED BY
 ENGINEER. FS 471.025
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 CONSTUCTION SERVICES DEPT.
 561-805-6717
 [email protected]

Review Stop E ELECTRICAL
Rev No 5 Status P Date 2003-11-14 Cont ID  
Sent By csiegber Date 2004-05-05 Time 14:38 Rev Time 0.00
Received By sthyng Date 2003-11-14 Time 15:02 Sent To  
Notes
2003-11-14 00:00:00SEE PREVIOUS REVIEW - PASSED W/PROVISOS
 BY DP - FAILED ONLY FOR 4X FEE NOT
 PAID

Review Stop E ELECTRICAL
Rev No 4 Status F Date 2003-11-06 Cont ID  
Sent By dpalmer Date 2003-11-06 Time 11:22 Rev Time 1.00
Received By dpalmer Date 2003-11-06 Time 11:22 Sent To  
Notes
2003-11-06 00:00:00*************** NOTES REDLINED *****
  
 1)NOTE: PLEASE SEE PANEL SCHEDULE AND
 LOAD CALCULATIONS.
 AHU'S SHOWN WITH 60A OCP WITH #10 AWG
 AND 30A OCP W/ #6 AWG. PLEASE ALSO SEE
 LOAD CALCS DO NOT INCLUDE ALL A/C LOAD
 SHOWN?? TOTAL OF 3-10KW AND ONE 8KW.
  
 PLEASE SEE THAT PER FBPE PLANS SHOULD
 HAVE A COMPLETE SIGNATURE AS REQ'D UNDER
 FS 471.025. A VISBLE FIRST AND LAST
 NAME SHOULD SIGNED.
  
 PLEASE SEE THAT OLD PLAN WERE NOT TAKEN
 OUT OF SETS AND NEW SHEETS INSERTED AS
 REQUESTED.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW BEFORE ROUGH ELECTRICAL INSPECT-
 -ION IS CALLED IN. IF THERE ARE ANY
 QUESTIONS, PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 DPALMER@WPB.
 THIS WILL REMAIN IN "F" STATUS UNTIL
 VERIFICATION CAN BE MADE THAT 4X FEE
 FOR PLAN WAS PAID. $1,407.20 WAS DUE
 BEFORE RESUBMITTING PLANS. NOTE WAS TAKE
 N OUT OF COMPUTER???
 OWES PER FS 553.80(2)(B).

Review Stop E ELECTRICAL
Rev No 3 Status F Date 2003-10-09 Cont ID  
Sent By csiegber Date 2003-11-04 Time 09:19 Rev Time 1.50
Received By dpalmer Date 2003-10-09 Time 07:32 Sent To P
Notes
2003-10-09 00:00:00************** UNSAT **************
  
 PLEASE SEE THAT SOME NOTES FROM FIRST
 TWO REVIEWS ARE NOT ADDRESSED.
 PLEASE SEE THAT NOTICE WAS GIVEN TO
 DESIGN PROFESSIONAL(S) ON LAST REVIEW
 REQ'D UNDER FS 553.80(2)(B)
 PLEASE SEE BZ RECEIPT ATTACH FOR FINE
 REQ'D TO BE ASSESSED. THE FEE IS BASED
 ON PLAN REVIEW PORTION OF PERMIT FEE,
 WHICH IS 30% 4X. $1407.20 WHICH IS REQ'D
 TO BE PAID BEFORE NEXT SUBMITTIAL.
  
 2)NOTE: PLEASE SEE SERVICE ENT CONDUCTOR
 -S STILL BEING SHOWN AT ONLY ONE SET OF
 3/0'S? THESE ARE RATED FOR A 225A, AS
 PERMITTED UNDER 310.15B6.
 LOAD FOR SERVICE ALONE IS OVER 300A'S.
 THIS IS A 400A SERVICE.
  
 3)NOTE: PREVIOUS NOTES REQUESTED INFO
 ON TWO MAIN DISC'S SHOWN ARE NEW OR
 EXISTING?, NOW MAINS ARE BEING SHOWN AS
 EXSITING , YET NOTE FOR THESE MENTION;
 IF REQ'D?? PLEASE CLARIFY IF NEW OR NOT?
  
 4)NOTE: PLEASE SEE 250.66 FOR SIZING OF
 GROUNDING ELECTRODE CONDCUTOR TO BE #2
 FOR A 400A SERVICE.
  
 5)NOTE: PLEASE SEE PANEL SCHEDULE,
 BATH CIRCUIT IS NOW NOTED AS BEING
 RELOCATED? HOW IS THIS, IF BATH IS NEW?
  
 6)NOTE: CORRELATE ALL AWG AND OCP ON
 PANEL SCHEDULE. (DRYER) #12 AWG?
  
 7)NOTE: PLEASE SEE MISSING GFI RECEPT
 FOR NEW CU. 210.63
  
 8)NOTE: PLEASE SEE PANEL SCHEDULE B?
 FIRST AHU IS NOTED AS BEING TWO AT 10KW?
  
 9)NOTE: PLEASE SEE MISSING REQ'D COLD
 WATER PIPE ON GROUNDING ELECTRODE.250.50
  
 10)NOTE: PLEASE SEE COPY OF FS 553.80(2)
 (B) ATTACHED AGAIN. PLEASE SEE THAT IF
 PLANS ARE NOT CORRECTED AND SUBMITTED
 WITH ANY OF THE SAME COMMENTS NEXT TIME,
 AN ADDITIONAL 4X FEE WILL BE ACCESSED
 AND PLANS WILL BE REQ'D TO BE TURNED
 INTO THE THE FBPE.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2003-09-11 Cont ID  
Sent By csiegber Date 2003-10-06 Time 10:11 Rev Time 0.33
Received By dpalmer Date 2003-09-11 Time 06:51 Sent To P
Notes
2003-09-11 00:00:00************** UNSAT *****************
  
 1)NOTE: PLEASE SEE PLANS, NO CORRECTIONS
 HAVE BEEN MADE? SEE FIRST REVIEW NOTES.
 PLEASE SEE ATTACHED LETTER WITH RESPECT
 TO DESIGN PROFESSIONALS PER FS 553.80(2)
 (B).
  
 2)NOTE: PLEASE SEE ATTACHED COPIES OF
 BOTH FAC'S 61G1-16.004 FOR ARCH'S AND
 61G15-23.002 FOR ENGINEER AND INFORMAT-
 -ION REQ'D ON TITLE BLOCKS PER FS'S
 471 AND 481.
  
 3)NOTE; PLEASE SEE SEC'S AND FEEDERS,
 # OF CONDUCTORS AND SIZES DO NOT SEEM
 TO CORRELATE W/ NEC. 215.5/310.16
  
  
  
 PLEASE SUBMIT THE ABOVE INFORMATION AND
 INFORMATION FROM FIRST REVIEW NOTES FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2003-07-24 Cont ID  
Sent By csiegber Date 2003-09-09 Time 10:36 Rev Time 0.50
Received By dpalmer Date 2003-07-24 Time 06:26 Sent To P
Notes
2003-07-24 00:00:00*************** UNSAT **************
  
 1)NOTE: PLEASE SEE ATTACHED COPY OF FAC
 61G1-16.004 FOR MISSING INFORMATION ON
 TITLE BLOCK.
  
 2)NOTE: PLEASE INCLUDE SD REQ'D ON
 FIRST FLR LEADING TO FLR ABOVE. NFPA-72
 8-1.4.2
  
 3)NOTE: PLEASE CLARIFY/SHOW REQ'D RECEPT
 FOR A/ COND UNIT(S). 210.63
  
 4)NOTE: PLEASE LIST THE REQ'D DEDICATED
 BATH CIRCUIT(S) PER 210.11.C.3/ 210.52D
 #12, 20A
  
 5)NOTE: PLEASE SEE MANY ITEMS ON
 PANEL SCHEDULE WHERE OCP/WIRE/ AND LOADS
 DO NOT CORRELATE. PLEASE ADJUST.
 10KW ON 2-P 30'S, 1-P-20'S FOR AHU'S ETC
  
 6)NOTE: PLEASE CLARIFY IF DISC'S SHOWN
 FOR SERVICE ARE GOING TO BE NEW?
 PANELS ARE SHOWN AS EXISTING.
 AS PER LOCAL AMENDMENTS 210-70, NO MORE
 THAN 8' OF UNPROTECTED CONDUCTORS INSIDE
 BLDG.
 PLEASE ALSO SUBMIT AIC RATINGS FOR MAINS
 IF INDEED NEW. 110.9/215.5
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 7 Status N Date 2004-06-09 Cont ID  
Sent By csiegber Date 2004-06-09 Time 12:56 Rev Time 0.00
Received By csiegber Date 2004-06-09 Time 12:56 Sent To E
Notes
2004-06-09 00:00:00TO DP BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2004-05-05 Cont ID  
Sent By csiegber Date 2004-05-05 Time 14:38 Rev Time 0.00
Received By csiegber Date 2004-05-05 Time 14:38 Sent To E
Notes
2004-05-05 00:00:00TO DP DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2003-11-04 Cont ID  
Sent By csiegber Date 2003-11-04 Time 09:19 Rev Time 0.00
Received By csiegber Date 2003-11-04 Time 09:17 Sent To E
Notes
2003-11-04 00:00:00TO DP DESK/3RD RESUB

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2003-10-06 Cont ID  
Sent By csiegber Date 2003-10-06 Time 10:11 Rev Time 0.00
Received By csiegber Date 2003-10-06 Time 10:11 Sent To E
Notes
2003-10-06 00:00:00TO DP DESK

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-09-09 Cont ID  
Sent By csiegber Date 2003-09-09 Time 10:36 Rev Time 0.00
Received By csiegber Date 2003-09-09 Time 10:36 Sent To E
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-07-21 Cont ID  
Sent By shernand Date 2003-07-21 Time 16:05 Rev Time 0.00
Received By shernand Date 2003-07-21 Time 16:05 Sent To E
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-07-16 Cont ID  
Sent By mmclean Date 2003-07-21 Time 12:05 Rev Time 0.00
Received By shernand Date 2003-07-16 Time 09:36 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 4 Status P Date 2004-06-14 Cont ID  
Sent By pkrauss Date 2004-06-14 Time 13:33 Rev Time 0.25
Received By pkrauss Date 2004-06-14 Time 13:32 Sent To B
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 3 Status F Date 2004-05-25 Cont ID  
Sent By jleech Date 2004-06-12 Time 11:53 Rev Time 0.30
Received By pkrauss Date 2004-05-25 Time 07:20 Sent To B
Notes
2004-05-25 00:00:00******************DENIED****************
 RETURN AIR IS NOT SIZED PROPERLY.PER
 2001 FBC(M) 601.4, RETURN AIR SHALL BE
 EQUAL TO THE SUPPLY AIR TO THAT SPACE.
  
 AUXILIARY DRAIN PAN WITH OVERFLOW
 PROTECTION REQUIRED PER 2001 FBC(M)
 307.2.3.
  
 SEE ALSO COMMENT #3 BY DEWEY PALMER,
 ELECTRICAL PLAN REVIEW & KENNY STEVENS,
 PLUMBING PLAN REVIEW.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT (561)805-6719.
  
 PATTY KRAUSS/MECHANICAL PLAN REVIEW

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2003-10-16 Cont ID  
Sent By kstevens Date 2004-05-24 Time 14:53 Rev Time 0.25
Received By pkrauss Date 2003-10-16 Time 10:08 Sent To B
Notes
2003-10-16 00:00:00PROVISO:
 1.PLEASE NOTE RETURN AIR NOT SIZED
 PROPERLY.PLEASE REVISE TO COMPLY WITH:
 PLEASE NOTE, REVISION TO THE 2001
 FBC(M) 601.4, EFFECTIVE JUNE 30,2003:
  
 BALANCED AIR RETURN - RETURN/TRANSFER
 SHALL BE 1 1/2 TIMES THE CROSS SECTIONAL
 AREA (SQ INCHES) OF THE SUPPLY DUCT
 ENTERING THE ROOM ITS SERVING & THE
 DOOR HAVING AN UNRESTRICTED 1" UNDERCUT.
  
 ALL SUPPLY AIR INTO THE MASTER SUITE
 SHALL BE INCLUDED.
  
 2.SUPPLY DUCT NOT SIZED BETWEEN THE
 UNIT AND DISTRIBUTION BOX.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT (561) 805-6719.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-07-25 Cont ID  
Sent By jleech Date 2003-10-14 Time 19:33 Rev Time 0.33
Received By pkrauss Date 2003-07-25 Time 14:43 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 5 Status P Date 2004-06-12 Cont ID  
Sent By jleech Date 2004-06-12 Time 11:53 Rev Time 0.50
Received By jleech Date 2004-06-12 Time 11:53 Sent To M
Notes
***NONE***

Review Stop P PLUMBING
Rev No 4 Status F Date 2004-05-24 Cont ID  
Sent By dpalmer Date 2004-06-10 Time 11:02 Rev Time 0.50
Received By kstevens Date 2004-05-24 Time 14:50 Sent To M
Notes
2004-05-24 00:00:00DENIED
 REFERENCE: FLORIDA ADMINISTRATIVE CODE
 FLORIDA STATUTES
  
 THE PERSONAL SEAL, SIGNATURE, AND DATE
 OF THE ARCHITECT SHALL APPEAR ON ALL
 ARCHITECTURAL DOCUMENTS TO BE FILED FOR
 PUBLIC RECORD. INITIALS ARE NOT ACCEPT-
 ABLE AND FIRST AND LAST NAME ARE REQUIR-
 ED PER DBPR. ALSO NO DATE IS AFFIXED ON
 SHEETS. - FAC 61G1-16.003 & FS 481.221.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]

Review Stop P PLUMBING
Rev No 3 Status P Date 2003-10-14 Cont ID  
Sent By dpalmer Date 2004-05-08 Time 11:44 Rev Time 0.33
Received By jleech Date 2003-10-14 Time 19:33 Sent To M
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2003-09-24 Cont ID  
Sent By dpalmer Date 2003-10-09 Time 08:18 Rev Time 0.33
Received By jleech Date 2003-09-24 Time 19:34 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2003-07-24 Cont ID  
Sent By dpalmer Date 2003-09-11 Time 06:51 Rev Time 0.50
Received By kstevens Date 2003-07-24 Time 15:24 Sent To M
Notes
2003-07-24 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
  
 1) POWDER ROOM SHALL NOT DRAIN THROUGH
 THE VENT FOR THE WASH MACHINE/LAUNDRY
 SINK. SECTION 908.3 READS IN PART. WHERE
 THE FIXTURE DRAINS CONNECT AT DIFFERENT
 LEVELS, THE VENT SHALL CONNECT AS A
 VERTICAL EXTENSION OF THE VERTICAL DRAIN
 THE UPPER FIXTURE SHALL NOT BE A WATER
 CLOSET. POWDER ROOM SHALL TIE IN DOWN-
 STREAM OF THE LAUNDRY ROOM FIXTURES. SEE
 RED LINE CORRECTIONS.
 2) DATE REQUIRED ON SIGNATURE AND SEAL
 BY ENGINEER. SEE ATTACHED SHEET FOR ANY
 OTHER REQUIREMENTS PER 61G1-16 SEALS AND
 PLANS.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]

Review Stop Z ZONING
Rev No 1 Status P Date 2003-07-21 Cont ID  
Sent By shernand Date 2003-07-16 Time 09:36 Rev Time 1.00
Received By mmclean Date   Time   Sent To I
Notes
***NONE***