Plan Review Details - Permit 03070496
Plan Review Stops For Permit 03070496
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-08-08 Cont ID  
Sent By rmcdouga Date 2003-08-08 Time 09:16 Rev Time 2.50
Received By rmcdouga Date 2003-08-08 Time 09:16 Sent To  
Notes
2003-08-08 00:00:00BUILDING PROVISO
  
 1) SITE SPECIFIC ENGINEERING FOR FIXED
 GLASS WINDOWS DOES NOT INDICATE LOCATION
 OF JOB, HAS NOT BEEN SEALED BY THE
 DESIGNER OF RECORD AND DOES NOT LIST ALL
 OF THE SIZES OF FIXED GLASS WINDOWS THAT
 ARE SHOWN ON THE PLANS. APPLY UNDER A
 SEPARATE PERMIT FOR ALL OF THE FIXED
 GLASS WINDOWS.
  
 2)SUBMIT PRODUCT APPROVAL FOR STRUCTURAL
 MULLIONS.
  
 3) STRUCTURE IS LOCATED IN AN "AO" FLOOD
 ZONE AN ELEVATION CERTIFICATE WILL BE
 REQUIRED.
  
 4)THE PRELIMINARY SOIL REPORT RECOMMENDS
 ADDITIONAL TESTING. CONTRACTOR IS
 PROCEEDING AT HIS OWN RISK WITHOUT IT.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2003-07-30 Cont ID  
Sent By alange Date 2003-08-07 Time 14:43 Rev Time 4.00
Received By rmcdouga Date 2003-07-30 Time 15:28 Sent To  
Notes
2003-07-30 00:00:00BUILDING DENIED
  
 1) IMPACT FEES MUST BE PAID TO PALM
 BEACH COUNTY, PLANS STAMPED BY THEM AND
 COPY OF RECEIPT SUBMITTED TO CITY OF
 WEST PALM BEACH BUILDING DEPARTMENT,
 BEFORE A BUILDING PERMIT CAN BE ISSUED.
  
 2) STRUCTURE IS LOCATED IN AN "AO" FLOOD
 ZONE AN ELEVATION CERTIFICATE WILL BE
 REQUIRED.
  
 3)THE PRELIMINARY SOIL REPORT RECOMMENDS
 ADDITIONAL TESTING.
  
 4) REVISE NOTE #11 UNDER PLAN NOTES ON
 C1. FBC 1606.1.4 REQUIRES PROTECTION OF
 GLAZED OPENINGS IN WINDBOURNE DEBRIS
 REGIONS AS WELL AS HVHZ AREAS.
  
 5) REVISE NOTE #15 UNDER FRAMING NOTES
 ON C1. ASTM C 1063 REQUIRES HIGH RIB
 METAL LATH TO BE ATTACHED AT EACH RIB
 (4'OC).
  
 6) SPECIFY THE LENGTH/EMBEDMENT DEPTH OF
 THE 1/2" DIA. ANCHOR BOLTS USED TO
 FASTEN THE GARAGE DOOR BUCKS ON A4.
  
 7) CLARIFY ON THE S.G.D. DETAIL ON A4
 THAT THE FRAME IS FASTENED THROUGH THE
 1X BUCK.
  
 8) REVISE THE TRUSS CONNECTOR SCHEDULE
 ON A6 TO VALUES THAT DO NOT INCLUDE THE
 ONE-THIRD INCREASE IN THE STEEL CALCS.
 SEE FBC 1609.4.3 AND THE 2003 USP
 CATALOG.
  
 9) REVISE THE UPLIFT VALUES IN DETAILS
 14 AND 15 ON A5 TO COMPLY WITH 1609.4.3.
  
 10) REVISE CONNECTION DETAIL 8 ON A5 TO
 COMPLY WITH FBC 1609.4.3. SEE 2003 USP
 CATALOG.
  
 11) PROVIDE (2) CURRENT AND COMPLETE
 COPIES OF SBCCI OR METRO-DADE PRODUCT
 APPROVALS FOR:
 - FIXED GLASS WINDOWS
 - ARCHED FIXED GLASS WINDOWS
 - ROUND FIXED GLASS WINDOW
 - STRUCTURAL MULLIONS
  
 12) THE PRODUCT APPROVALS FOR THE DOUBLE
 OUTSWING DOOR IS ILLEGIBLE.
  
 13) THE DRAWING FOR THE OVERHEAD DOOR IS
 ILLEGIBLE.
  
 14) THE DRAWINGS FOR THE GLASS BLOCK ARE
 ILLEGIBLE.
  
 15) PAGES ARE MISSING FROM THE SLIDING
 GLASS DOOR PRODUCT APPROVAL.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2004-01-30 Cont ID  
Sent By dpalmer Date 2004-01-30 Time 10:20 Rev Time 0.33
Received By dpalmer Date 2004-01-30 Time 10:20 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2004-01-27 Cont ID  
Sent By csiegber Date 2004-01-29 Time 10:17 Rev Time 0.50
Received By dpalmer Date 2004-01-27 Time 08:39 Sent To  
Notes
2004-01-27 00:00:00*************** UNSAT ***************
  
 1)NOTE: PLEASE HAVE PLANS SIGNED WITH
 A COMPLETE SIGNATURE AND/OR SIGNATURE AS
 SIGNED ON ARCH LICENSE AND DRIVERS
 LICENSE. FS 481.221
 WE ARE IN POSSESSION OF MORE THAN ONE
 SET OF PLANS WITH MORE THAN ONE SIGNAT-
 -URE.
 WE ARE RETAINING ONE COPY OF EACH SET
 FOR ABOVE SAID VERIFICATION. IF LICENES
 ARE SIGNED WITH COMPLETE SIGNATURE, THEN
 PLANS MUST BE SIGNED THE SAME WAY.
  
 2)NOTE: PLEASE PROVIDE ALL LICENSE #'S
 IN TITLE BLOCK AS REQD UNDER FS 481.219
 FAC 61G1-16.004
  
 3)NOTE: PLEASE SEE NOTE ON PLANS REFER-
 -ENCE ARC FAULT PROTECTION FOR RECEPTS,
 THIS JOB WAS APPLIED FOR PERMIT AFTER
 7/1/03. THE 2002 NEC'S REQUIREMENT FOR
 210.12 HAS CHANGED. PLEASE ADJUST NOTE.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 CONSTUCTION SERVICES DEPT.
 561-805-6717
 [email protected]

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-07-24 Cont ID  
Sent By btrobaug Date 2003-07-24 Time 15:57 Rev Time 0.50
Received By btrobaug Date 2003-07-24 Time 15:23 Sent To M
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2004-01-29 Cont ID  
Sent By csiegber Date 2004-01-29 Time 10:17 Rev Time 0.00
Received By csiegber Date 2004-01-29 Time 10:17 Sent To E
Notes
2004-01-29 00:00:00TO DP DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-08-07 Cont ID  
Sent By alange Date 2003-08-07 Time 14:43 Rev Time 0.00
Received By alange Date 2003-08-07 Time 14:43 Sent To B
Notes
2003-08-07 00:00:00TO RM DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-07-09 Cont ID  
Sent By mmclean Date 2003-07-11 Time 15:35 Rev Time 0.00
Received By shernand Date 2003-07-09 Time 08:47 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-07-29 Cont ID  
Sent By btrobaug Date 2003-07-24 Time 15:57 Rev Time 0.25
Received By pkrauss Date 2003-07-29 Time 11:24 Sent To P
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-07-30 Cont ID  
Sent By pkrauss Date 2003-07-29 Time 11:25 Rev Time 0.20
Received By rmcdouga Date 2003-07-30 Time 14:50 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2003-07-11 Cont ID  
Sent By shernand Date 2003-07-09 Time 08:47 Rev Time 1.00
Received By mmclean Date   Time   Sent To I
Notes
***NONE***