Plan Review Details - Permit 03060712
Plan Review Stops For Permit 03060712
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2003-09-22 Cont ID  
Sent By sthyng Date 2003-09-22 Time 16:00 Rev Time 0.50
Received By sthyng Date 2003-09-22 Time 16:00 Sent To  
Notes
2003-09-22 00:00:00REVISION

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-07-14 Cont ID  
Sent By rmcdouga Date 2003-07-14 Time 14:26 Rev Time 2.00
Received By rmcdouga Date 2003-07-14 Time 14:26 Sent To  
Notes
2003-07-14 00:00:00BUILDING PROVISO
  
 1) STRUCTURE IS IN AN "AO" FLOOD ZONE AN
 ELEVATION CERTIFICATE WILL BE REQUIRED.
  
 2) SUBMIT AN INSTALLATION SCHEDULE AND A
 KEY PLAN FOR THE STORM PANELS.
  
 3) SUBMIT REVISED DESIGN WINDLOADS FOR
 ALL EXTERIOR OPENINGS BASED ON EXPOSURE
 CATEGORY B.
  
 4) SUBMIT A REVISED CONNECTOR SCHEDULE
 FOR THE TRUSSES PRIOR TO INSTALLING.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2003-07-03 Cont ID  
Sent By rregueir Date 2003-06-28 Time 13:30 Rev Time 2.00
Received By rmcdouga Date 2003-07-03 Time 15:37 Sent To  
Notes
2003-07-03 00:00:00BUILDING DENIED
  
 SAME COMMENTS AS 03051875.

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2003-10-31 Cont ID  
Sent By dpalmer Date 2003-10-31 Time 12:42 Rev Time 0.33
Received By dpalmer Date 2003-10-31 Time 12:42 Sent To  
Notes
2003-10-31 00:00:00REV FOR FAN SYMBOL.

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2003-09-17 Cont ID  
Sent By dpalmer Date 2003-09-17 Time 07:15 Rev Time 0.25
Received By dpalmer Date 2003-09-17 Time 07:15 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-06-24 Cont ID  
Sent By bstaples Date 2003-08-19 Time 09:29 Rev Time 0.33
Received By btrobaug Date 2003-06-24 Time 17:03 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2003-06-20 Cont ID  
Sent By btrobaug Date 2003-06-20 Time 08:02 Rev Time 0.50
Received By btrobaug Date 2003-06-20 Time 07:53 Sent To P
Notes
2003-06-20 00:00:00FAILED
 ~~~~~~
 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
 PLEASE NOTE THAT ALL PLANS
 DRAWN BY AN ARCHITECT/ENGINEER CONTAIN-
 ING A TITLE BLOCK, MUST BE SIGNED, DATED
 AND SEALED BY THE ARCH/ENGINEER OF
 RECORD. PER FS/FAC 481.221 & 471.025
  
 BILL TROBAUGH
 ELECTRICAL PLAN REVIEW
 561/805-6718

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-08-19 Cont ID  
Sent By bstaples Date 2003-08-19 Time 09:29 Rev Time 0.00
Received By bstaples Date 2003-08-19 Time 09:29 Sent To E
Notes
2003-08-19 00:00:00TO DP DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-06-11 Cont ID  
Sent By shernand Date 2003-06-11 Time 09:18 Rev Time 0.00
Received By shernand Date 2003-06-11 Time 09:18 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-06-28 Cont ID  
Sent By jleech Date 2003-06-26 Time 18:02 Rev Time 0.25
Received By rregueir Date 2003-06-28 Time 13:29 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2003-06-26 Cont ID  
Sent By btrobaug Date 2003-06-24 Time 17:07 Rev Time 0.25
Received By jleech Date 2003-06-26 Time 18:01 Sent To M
Notes
2003-06-26 00:00:00NO PLUMBING PLANS.

Review Stop Z ZONING
Rev No 1 Status P Date 2003-07-03 Cont ID  
Sent By shernand Date 2003-06-11 Time 09:18 Rev Time 0.00
Received By rmcdouga Date   Time   Sent To  
Notes
2003-07-03 00:00:00OK PER M.MCLEAN 6-12-03