Plan Review Details - Permit 03060138
Plan Review Stops For Permit 03060138
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-07-24 Cont ID  
Sent By jgomez Date 2003-07-24 Time 09:24 Rev Time 1.00
Received By jgomez Date 2003-07-24 Time 09:24 Sent To PC
Notes
2003-07-24 00:00:00BUILDING REVIEW APPROVED WITH PROVISO:
 1-STORM SHUTTERS INSTALLATION SCHEDULE:
 REVISE THE SPACING OF THE WOOD
 ANCHORS. SEE THE ENGINEERED DRAWINGS
 FOR MAXIMUM SPACING ALLOWED.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2003-07-09 Cont ID  
Sent By alange Date 2003-07-22 Time 14:34 Rev Time 2.00
Received By jgomez Date 2003-07-08 Time 18:50 Sent To PC
Notes
2003-07-08 00:00:00CHECKLIST:
 1-SURVEY DOESN'T MATCH MODEL 203 AS
 SHOWN ON PLANS. IT WAS MODEL 204 AND
 IT WAS CROSS OUT TO READ MODEL 203.
 REVISE AS REQUIRED. CLARIFY WHICH
 MODEL IS GOING TO BE BUILT.
 2-PROVIDE COMPLETE & CORRECT INFORMATION
 FOR STORM SHUTTERS, INCLUDING CORRECT
 ANCHOR SPACING FOR WOOD ANCHORS OR
 APPLY FOR A SEPARATE PERMIT.
 3-REVISE FRONT ELEVATION TO MATCH TYPE
 OF WINDOW SPECIFIED ON THE WINDOW
 SCHEDULE.
 4-REVISE TRUSS ANCHOR SCHEDULE AND ALL
 DETAILS THAT ARE AFFECTED BY SECTION
 1609.4.3 FBC 2001, WHICH DOES NOT
 PERMIT THE ALLOWABLE STEEL STRESS TO
 BE INCREASED.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-08-05 Cont ID  
Sent By csiegber Date 2003-10-24 Time 09:14 Rev Time 0.50
Received By btrobaug Date 2003-08-05 Time 06:39 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-06-19 Cont ID  
Sent By btrobaug Date 2003-08-05 Time 06:39 Rev Time 0.50
Received By btrobaug Date 2003-06-19 Time 17:50 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2003-11-03 Cont ID  
Sent By csiegber Date 2003-11-03 Time 14:24 Rev Time 0.00
Received By csiegber Date 2003-11-03 Time 14:24 Sent To M
Notes
2003-11-03 00:00:00TO PK BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2003-10-24 Cont ID  
Sent By csiegber Date 2003-10-24 Time 09:14 Rev Time 0.00
Received By csiegber Date 2003-10-24 Time 09:14 Sent To E
Notes
2003-10-24 00:00:00TO BT DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-08-05 Cont ID  
Sent By btrobaug Date 2003-08-05 Time 06:39 Rev Time 0.00
Received By btrobaug Date 2003-07-28 Time 13:22 Sent To E
Notes
2003-07-28 00:00:00TO BT DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-07-22 Cont ID  
Sent By alange Date 2003-07-22 Time 14:33 Rev Time 0.00
Received By alange Date 2003-07-22 Time 14:33 Sent To B
Notes
2003-07-22 00:00:007/22/03 TO JGOMES

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-06-04 Cont ID  
Sent By shernand Date 2003-06-04 Time 10:10 Rev Time 0.00
Received By shernand Date 2003-06-04 Time 10:10 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2003-11-18 Cont ID  
Sent By pkrauss Date 2003-11-18 Time 16:12 Rev Time 0.25
Received By pkrauss Date 2003-11-18 Time 16:12 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-06-30 Cont ID  
Sent By csiegber Date 2003-11-03 Time 14:24 Rev Time 0.25
Received By pkrauss Date 2003-06-30 Time 07:15 Sent To P
Notes
2003-06-30 00:00:00MECHANICAL PERMIT 03060206

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-07-02 Cont ID  
Sent By pkrauss Date 2003-06-30 Time 07:16 Rev Time 0.25
Received By jleech Date 2003-07-02 Time 17:32 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2003-06-04 Cont ID  
Sent By shernand Date 2003-06-04 Time 10:10 Rev Time 0.00
Received By mmclean Date   Time   Sent To E
Notes
***NONE***