Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-08-04 Cont ID  
Sent By lhatten Date 2003-08-04 Time 08:17 Rev Time 4.00
Received By lhatten Date 2003-08-03 Time 08:15 Sent To  
Notes
2003-08-04 00:00:00RESUB OK - REVIEWED & STAMPED PLANS
 08/03/2003 --GOT ALL PRODUCT APPROVALS
 ETC. MADE SPECIFIC HIGHLIGHTS ON REVIEW

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2003-06-27 Cont ID  
Sent By pkrauss Date 2003-07-28 Time 07:17 Rev Time 1.50
Received By lhatten Date 2003-06-26 Time 14:51 Sent To  
Notes
2003-06-27 00:00:00REVIEWED & FAILEDITEMS ARE AS FOLLOWS
  
 PRODUCT APPROVALS FOR THE FOLLOWING;
  
 1) ALL WINDOWS - OPERABLE,FIXED,ARCHED
 IMPACT OR NON-IMPACT!
 2) ALL DOORS BOTH SOLID PANELS OR GLASS
 IMPACT OR NON-IMPACT ,ALSO SIDELITES
 3) SHUTTERS IF NEEDED DUE TO NON-IMPACT
 4) GARAGE DOORS 8'-0" X 8'-0" WITH THE
 WOOD VENNEER AS PER THE DRAWINGS
 5) THE SPECIAL FRONT DOOR WILL REQUIRED
 PRODUCT APPROVAL IF IT IS A DOOR YOU CAN
 BUY,IF NOT AN ENGINEER WILL HAVE TO DO
 A SITE SPECIFIC REPORT ON THE DOOR!
 6)ROOF MATERIAL USED AND SPECS.
 7) AN ADDITIONAL COPY OF THE DENSITY
 REPORTS
 8) MAKE SURE AT THIS TIME IF THE POOL
 HAS NOT BEEN REMOVED THAT A SECURED
 FENCE HAS BEEN BUILT AROUND IT.
 9) IMPACT FEES NEED TO BE PAID BEFORE
 PERMIT ISSUED!
 10) COVER SHT OF THE ENERGY CALCS. (1)
 11) ANY OTHER PRODUCT APPROVALS THAT I
 MAY OF MISSEDECT.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-07-16 Cont ID  
Sent By btrobaug Date 2003-07-16 Time 14:02 Rev Time 0.50
Received By btrobaug Date 2003-07-16 Time 13:21 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2003-06-18 Cont ID  
Sent By shernand Date 2003-07-16 Time 09:52 Rev Time 0.50
Received By btrobaug Date 2003-06-18 Time 10:31 Sent To B
Notes
2003-06-18 00:00:00UNSAT
 ~~~~~
 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
 PLEASE PROVIDE THE FOLLOWING
 INFORMATION,MAKE NECESSARY CHANGES TO
 PLANS AND RESUBMIT FOR REVIEW.
  
 1} PLEASE STATE THE CORRECT AMPERAGE OF
 THE METER ENCLOSURE ON THE RISER
 DIAGRAM. 500 AMPS DOES NOT CORRELATE TO
 ANY U L LISTED METER ENCLOSURE.
  
 2} PLEASE SUBMIT AIC RATINGS FOR
 ALL NEW EQUIPMENT BEING INSTALLED.
 MAINS/PANELS/BREAKERS MUST BE RATED FOR
 THE AVAILABLE FAULT CURRENT PER 110-9.
  
 3} PLEASE INDICATE THE NUMBER AND SIZE
 OF THE CONDUCTORS IN THE 8"X8" GUTTER.
  
 4} THE #4 JUMPER SHOWN IN THE GUTTER
 FORMS A PARALLEL GROUND PATH WITH THE
 NEUTRAL THAT IS APPARANTLY TO BE
 GROUNDED AT THAT POINT,AND MUST BE
 REMOVED.
  
 5} THE #2 GROUNDING ELECTRODE CONDUCTOR
 IS NOT SUFFICIENTLY SIZED FOR THE
 SERVICE,SEE 250-66.
  
 6} THE 1/0 CONDUCTORS ARE INCORRECT FOR
 250 AMP OVERCURRENT SHOWN FROM THE
 DISCONNECT TO THE PANEL"A".310-15(B)(6).
  
 7} PLEASE LIST THE REQ'D ARC
 FAULT PROTECTED CIRCUITS ON PANEL
 SCHEDULE OR NOTE ON PLANS FOR BRANCH
 CIRCUIT PROTECTION. PER 210-12.
  
 8} PLEASE LIST THE REQ'D BATH(S)
 CIRCUIT(S). PER 210-11-C-3
 MUST BE 20A AND #12AWG.
  
 9} A GFI MUST BE ADDED TO THE FRONT TO
 COMPLY WITH 210-52(E)
  
 10} THERE ARE TWO PANELS SHOWN ON THE
 RISER DIAGRAM AND ONLY ONE SHOWN ON THE
 PLAN.PLEASE SHOW ALL EQUIPMENT.
  
 11} ALL BATH RECEPTACLES MUST COMPLY
 WITH 210-52(D).SEE MASTER BATH.
  
 IF THERE ARE ANY QUESTIONS PLEASE CALL.
  
 BILL TROBAUGH
 ELECTRICAL PLAN REVIEW
 561/805-6718

Review Stop I INCOMING/PROCESSING
Rev No 7 Status N Date 2004-12-13 Cont ID  
Sent By mjacobs Date 2004-12-13 Time 11:45 Rev Time 0.00
Received By mjacobs Date 2004-12-13 Time 11:45 Sent To P
Notes
2004-12-13 00:00:00SENT TO "P" BOX./REV.

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2004-11-16 Cont ID  
Sent By mjacobs Date 2004-11-16 Time 11:52 Rev Time 0.00
Received By mjacobs Date 2004-11-16 Time 11:52 Sent To P
Notes
2004-11-16 00:00:00SENT TO "P" BOX

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2004-03-25 Cont ID  
Sent By csiegber Date 2004-03-25 Time 11:17 Rev Time 0.00
Received By csiegber Date 2004-03-25 Time 11:16 Sent To M
Notes
2004-03-25 00:00:00TO PK BOX/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2003-08-11 Cont ID  
Sent By dbaxter Date 2003-08-11 Time 15:48 Rev Time 0.00
Received By dbaxter Date 2003-08-11 Time 15:48 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-07-16 Cont ID  
Sent By shernand Date 2003-07-16 Time 09:52 Rev Time 0.00
Received By shernand Date 2003-07-16 Time 09:52 Sent To E
Notes
2003-07-16 00:00:00BT DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-06-06 Cont ID  
Sent By shernand Date 2003-06-06 Time 08:14 Rev Time 0.00
Received By shernand Date 2003-06-06 Time 08:14 Sent To Z
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-05-23 Cont ID  
Sent By shernand Date 2003-05-23 Time 16:17 Rev Time 0.00
Received By shernand Date 2003-05-23 Time 16:17 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2004-04-01 Cont ID  
Sent By pkrauss Date 2004-04-01 Time 13:38 Rev Time 0.40
Received By pkrauss Date 2004-04-01 Time 13:38 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2003-07-28 Cont ID  
Sent By csiegber Date 2004-03-25 Time 11:17 Rev Time 0.35
Received By pkrauss Date 2003-07-28 Time 07:03 Sent To B
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2003-06-16 Cont ID  
Sent By kstevens Date 2003-07-19 Time 06:13 Rev Time 0.40
Received By pkrauss Date 2003-06-16 Time 10:33 Sent To E
Notes
2003-06-16 00:00:00DENIED:
 PLEASE PROVIDE THE FOLLOWING INFORMATION
 FOR REVIEW:
  
 1.RETURN AIR - PLEASE PROVIDE GRILLE
 SIZES AND SIZE OF DUCTWORK.PLAN SHEET
 M3 AIR TERMINAL SCHEDULE, R/A "SEE SHEET
 FOR SIZES" - GRILLE SIZES ARE NOT SHOWN.
  
 2.EXHAUST FANS ARE NOT IDENTIFIED AS
 PER SCHEDULE INDICATED ON PLAN SHEET M3.
  
 3.PLEASE PROVIDE OUTSIDE AIR CALCS BY
 BY NATURAL MEANS (2001 FBC(M) 402.2) OR
 BY MECHANICAL MEANS (2001 FBC(M) TABLE
 403.3).
  
 IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT (561) 805-6719.

Review Stop P PLUMBING
Rev No 4 Status F Date 2004-12-01 Cont ID  
Sent By kstevens Date 2004-12-01 Time 14:37 Rev Time 0.50
Received By kstevens Date 2004-12-01 Time 14:37 Sent To  
Notes
2004-12-01 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 CHAPTER 1
 FLORIDA STATUTES
  
 1) REVISIONS OF A SIGNED AND SEALED SET
 OF PLANS SHALL BE SIGNED, SEALED, AND
 DATED BY THE ENGINEER OF RECORD. SECTION
 104.2.2 - FAC 61G15-23.002(1) - FS
 471.025
 2) HAND DRAWN CHANGES TO A SIGNED AND
 SEALED SET OF PLANS ARE NOT APPROVED.
 SECTION 104.2.1.3
 3) ALL CHANGES SHALL BE SHOWN ON THE
 SANITARY RISER DIAGRAM AND THE FLOOR
 PLAN WITH NEW SHEETS. 104.2.1.3
 4) SOLIS DESIGNS INC. SHALL INCLUDE THE
 CERTIFICATE OF AUTHORIZATION NUMBER IN
 THE TITLE BLOCK OF EACH SHEET PER FS
 481.219.
  
  
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]

Review Stop P PLUMBING
Rev No 3 Status P Date 2003-08-15 Cont ID  
Sent By kstevens Date 2003-08-15 Time 18:40 Rev Time 0.50
Received By kstevens Date 2003-08-15 Time 18:40 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2003-07-19 Cont ID  
Sent By dbaxter Date 2003-08-11 Time 15:48 Rev Time 0.50
Received By kstevens Date 2003-07-19 Time 06:02 Sent To M
Notes
2003-07-19 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 AMENDMENTS, CHAPTER
 ONE, ADMID. CODE
  
 1) THE SANITARY RISER DIAGRAM DOES NOT
 REFLECT THE FLOOR PLAN NOR DOES IT MEET
 CODE REQUIREMENTS.
 2) BATH #3 SHOW 4 LAVS ON RISER AND ONLY
 2 ON THE FLOOR PLAN.
 3) BATH #4, ONLY THE FIXTURES IN THE
 BATHROOM GROUP SHALL CONNECT TO THE WET-
 VENTED HORIZONTAL BRANCH DRAIN. A SEPAR-
 ATE STACK FOR BAR SINK SHALL TIE IN
 DOWNSTREAM OF THE BATHROOM FIXTURES.
 SECTION 909.1
 4) BATH #1 FROM PREVIOUS REVIEW, THE
 LAUNDRY SINK AND WASH MACHINE SHALL TIE
 IN DOWNSTREAM OF THE BATHROOM FIXTURES.
 SECTION 909.1. ALSO SEE ATTACHED SHEET
 TO PREVIOUS REVIEW FOR EXAMPLE OF HOW
 THE LAUNDRY ROOM/BATHROOM #1 SHOULD BE
 PIPED FOR CODE COMPLIANCE AND TO REFLECT
 THE FLOOR PLAN.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692

Review Stop P PLUMBING
Rev No 1 Status F Date 2003-06-14 Cont ID  
Sent By btrobaug Date 2003-07-16 Time 14:02 Rev Time 1.00
Received By kstevens Date 2003-06-14 Time 08:12 Sent To M
Notes
2003-06-14 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 FUEL GAS
  
 1) SHT 1, SANITARY RISER DIAGRAM DOES
 NOT MEET CODE OR REFLECT THE FLOOR PLAN.
 FLOOR PLANS SHOW W/C AND SHOWER, BUT THE
 RISER DIAGRAM SHOWS NO W/C AND AN EXTRA
 TUB. MASTER BATH BIDET NOT VENTED. 908.3
 BATH #1 ONLY THE FIXTURES FROM THE BATH
 ROOM GROUP SHALL DRAIN INTO THE WET VENT
 OF THE BATHROOM FIXTURES. THE TUB AND
 LAUNDRY SHALL TIE INTO BRANCH LINE PRIOR
 TO BATH #1, AND LAUNDRY SINK AND WASH
 MACHINE SHALL REQUIRE SEPARATE STACKS AS
 THEY ARE ON DIFFERENT WALLS. BATHS #'S
 2 & 4 SHOW TUBS ON FLOOR PLAN BUT HAVE
 SHOWERS ON RISER DIAGRAM. SEC 1-4.2.1
 SEC 909.1
 2) SHT 2 SHOWS GAS RANGE IN KITCHEN.
 SEPARATE PLANS & PERMIT REQUIRED FOR GAS
 SECTION 104.2.1
 (SEE ATTACHED SHEET FOR BATH #1 - LAUN-
 DRY ROOM RISER EXAMPLE)
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377
 (561) 805-6721
 FAX (561) 653-2692

Review Stop Z ZONING
Rev No 2 Status P Date 2003-06-06 Cont ID  
Sent By sgraham Date 2003-06-06 Time 13:08 Rev Time 0.00
Received By sgraham Date   Time   Sent To P
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2003-06-02 Cont ID  
Sent By shernand Date 2003-06-06 Time 08:14 Rev Time 0.00
Received By mmclean Date   Time   Sent To  
Notes
2003-06-02 00:00:00DENIED, MAX HEIGHT IS 33'