Plan Review Details - Permit 03041692
Plan Review Stops For Permit 03041692
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-06-02 Cont ID  
Sent By rmcdouga Date 2003-06-02 Time 13:21 Rev Time 2.00
Received By rmcdouga Date 2003-06-02 Time 13:21 Sent To  
Notes
2003-06-02 00:00:00BUILDING PROVISO
  
 1) SUBMIT SIGNED AND SEALED LETTER OR
 DRAWING SPECIFYING THE DIAMETER OF THE
 8" LONG ANCHOR BOLT USED TO ATTACH THE
 GIRDER TRUSS ANCHOR IN DETAIL F ON S2.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2003-05-19 Cont ID  
Sent By shernand Date 2003-05-30 Time 16:20 Rev Time 4.00
Received By rmcdouga Date   Time   Sent To M
Notes
2003-05-19 00:00:00BUILDING DENIED
  
 1) A RECORDED COPY OF THE NOTICE OF
 COMMENCEMENT MUST BE SUBMITTED BEFORE A
 PERMIT CAN BE ISSUED.
  
 2) SUBMIT THE PAID RECEIPT FOR THE
 COUNTY IMPACT FEES.
  
 3) THE OWNER AND BUILDER LISTED ON THE
 ENERGY CALCULATIONS DO NOT MATCH THE
 INFORMATION ON THE APPLICATION.
  
 4) PROVIDE A SOIL BORING TEST REPORT AS
 REQUIRED BY CITY AMEND. TO FBC 1804.2.2.
  
 5) SPECIFY THE LENGTH/EMBEDMENT DEPTH OF
 THE 1/2" DIAMETER ANCHORS AT THE WOOD
 FRAME TO CONCRETE WALL CONNECTION DETAIL
 ON A5. SEMCO WAS PURCHASED BY USP LAST
 YEAR. UPDATE THE SEMCO CONNECTOR THAT IS
 SPECIFIED FOR THE STUD TO PLATE
 CONNECTION.
  
 6) CLARIFY NOTE 1 UNDER STAIRS ON A4.
 HANDRAILS ARE REQUIRED TO BE NOT LESS
 THAN 34" OR MORE THAN 38" ABOVE THE
 LEADING EDGE OF TREADS PER 1007.5.1.
 GUARDRAILS FOR DWELLINGS CAN BE A
 MINIMUM OF 36" HIGH PER FBC 1026.5.1.
  
 7) REVISE THE STUCCO SOFFIT SPECS. ON
 A4. INDICATE THE FASTENER SIZE IN NOTE 3
 NOTES 4 AND 5 ARE THE SAME. INDICATE IN
 NOTE 7 THAT 3/8" HIGH RIB METAL LATH IS
 REQUIRED TO BE FASTENED AT EVERY RIB
 (4"O.C.) PER ASTM C 1063.
  
 8) CLARIFY THE CONNECTION AT STEEL
 COLUMN DETAIL 4 ON S2. THE PLAN APPEARS
 TO INDICATE THAT TWO GIRDERS ARE CARRIED
 BY THIS COLUMN. HOWEVER, THE DETAIL ONLY
 SHOWS ONE.
  
 9) THE BUCKET IN DETAIL C ON S2 IS SHOWN
 ON AN ANGLE ON THE ROOF PLAN. THIS IS
 NOT INDICATED ON THE DETAIL.
  
 10) DETAIL E ON S3 WHICH IS A TRUSS TO
 WOOD CONNECTOR IS INCORRECTLY INDICATED
 AT THE MASONRY WALL AT THE MASTER
 BEDROOM.
  
 11) REVISE THE CONNECTOR VALUES TO
 REFLECT VALUES THAT DO NOT INCLUDE A
 STRESS INCREASE ON THE STEEL CALCS.
 SEE FBC 1609.4.3.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)659-8096 EXT.8202

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-10-02 Cont ID  
Sent By dpalmer Date 2003-10-02 Time 11:15 Rev Time 0.33
Received By dpalmer Date 2003-10-02 Time 11:15 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-05-08 Cont ID  
Sent By csiegber Date 2003-09-23 Time 16:48 Rev Time 0.50
Received By btrobaug Date 2003-05-08 Time 12:41 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-09-23 Cont ID  
Sent By csiegber Date 2003-09-23 Time 16:48 Rev Time 0.00
Received By csiegber Date 2003-09-23 Time 16:48 Sent To E
Notes
2003-09-23 00:00:00TO DP DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-05-30 Cont ID  
Sent By shernand Date 2003-05-30 Time 16:20 Rev Time 0.00
Received By shernand Date 2003-05-30 Time 16:20 Sent To B
Notes
2003-05-30 00:00:00RM DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-04-23 Cont ID  
Sent By shernand Date 2003-04-23 Time 10:14 Rev Time 0.00
Received By shernand Date 2003-04-23 Time 10:14 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-05-20 Cont ID  
Sent By rmcdouga Date 2003-05-19 Time 09:35 Rev Time 0.25
Received By pkrauss Date 2003-05-20 Time 09:10 Sent To  
Notes
2003-05-20 00:00:00MECHANICAL PERMIT 03041719

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-05-10 Cont ID  
Sent By btrobaug Date 2003-05-08 Time 12:57 Rev Time 0.33
Received By kstevens Date 2003-05-10 Time 17:13 Sent To M
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status P Date 2003-06-04 Cont ID  
Sent By rmcdouga Date 2003-06-02 Time 14:22 Rev Time 0.00
Received By tjonseck Date 2003-06-04 Time 11:52 Sent To  
Notes
2003-06-02 00:00:00CONTRACTOR TO SUBMIT NOC AND PAID
 RECEIPT FOR IMPACT FEES BEFORE PERMIT
 CAN BE PRINTED.

Review Stop Z ZONING
Rev No 1 Status P Date 2003-04-30 Cont ID  
Sent By shernand Date 2003-04-23 Time 10:14 Rev Time 0.00
Received By sgraham Date   Time   Sent To E
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy