Plan Review Details - Permit 03041651
Plan Review Stops For Permit 03041651
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-07-01 Cont ID  
Sent By jgomez Date 2003-07-01 Time 17:42 Rev Time 0.50
Received By jgomez Date 2003-07-01 Time 17:42 Sent To PC
Notes
2003-07-01 00:00:00BUILDING REVIEW APPROVED WITH PROVISO:
 1-STORM SHUTTERS INSTALLATION SCHEDULE:
 REVISE SPACING FOR WOOD ANCHORS. SEE
 ENGINEERED DRAWINGS FOR REQUIRED
 MINIMUM SPACING.
 2-UPDATE TRUSS ANCHOR SCHEDULE AND ALL
 DETAILS THAT ARE AFFECTED BY SECTION
 1609.4.3 FBC 2001, WHICH DOES NOT
 ALLOW THE STEEL STRESS TO BE INCREASED

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2003-05-16 Cont ID  
Sent By shernand Date 2003-06-03 Time 09:07 Rev Time 2.00
Received By jgomez Date 2003-05-16 Time 11:00 Sent To  
Notes
2003-05-16 00:00:00BUILDING REVIEW APPROVED WITH PROVISO:
 1-PROVIDE UPDATED SBCCI STORM SHUTTERS
 PRODUCT APPROVAL.
 2-REVISE DETAIL S21 FOR COLUMN LOCATED
 BETWEEN GARAGE AND STAIRWAY TO MATCH
 CONDITIONS SHOWN ON 2ND FLOOR FRAMING
 PLAN WHERE THE TWO TRUSS GIRDERS ARE
 RESTING ON THE COLUMN. SECTION
 104.2.1.2 CITY AMENDMENTS TO FBC 2001.
 3-WINDOW 34SH DOESN'T PROVIDE THE 24"
 CLEAR HEIGHT REQUIRED FOR BEDROOMS.
 REVISE AS REQUIRED. SEC. 1005.4 FBC.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-09-30 Cont ID  
Sent By btrobaug Date 2003-09-30 Time 12:07 Rev Time 0.33
Received By btrobaug Date 2003-09-30 Time 12:07 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-05-08 Cont ID  
Sent By csiegber Date 2003-09-17 Time 16:31 Rev Time 0.50
Received By btrobaug Date 2003-05-08 Time 09:50 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2003-09-29 Cont ID  
Sent By csiegber Date 2003-09-29 Time 11:08 Rev Time 0.00
Received By csiegber Date 2003-09-29 Time 11:08 Sent To M
Notes
2003-09-29 00:00:00TO PK BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-09-17 Cont ID  
Sent By csiegber Date 2003-09-17 Time 16:31 Rev Time 0.00
Received By csiegber Date 2003-09-17 Time 16:31 Sent To E
Notes
2003-09-17 00:00:00TO BT DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-06-03 Cont ID  
Sent By shernand Date 2003-06-03 Time 09:07 Rev Time 0.00
Received By shernand Date 2003-06-03 Time 09:07 Sent To B
Notes
2003-06-03 00:00:00JGOMEZ DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-04-23 Cont ID  
Sent By shernand Date 2003-04-23 Time 09:29 Rev Time 0.00
Received By shernand Date 2003-04-23 Time 09:29 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2003-10-01 Cont ID  
Sent By pkrauss Date 2003-10-01 Time 07:50 Rev Time 0.20
Received By pkrauss Date 2003-10-01 Time 07:49 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-05-15 Cont ID  
Sent By csiegber Date 2003-09-29 Time 11:08 Rev Time 0.20
Received By pkrauss Date 2003-05-15 Time 09:47 Sent To B
Notes
2003-05-15 00:00:00MECHANICAL PERMIT 03041653

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-05-10 Cont ID  
Sent By btrobaug Date 2003-05-08 Time 09:51 Rev Time 0.33
Received By kstevens Date 2003-05-10 Time 16:41 Sent To M
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2003-04-30 Cont ID  
Sent By shernand Date 2003-04-23 Time 09:29 Rev Time 0.00
Received By sgraham Date   Time   Sent To E
Notes
***NONE***