Plan Review Stops For Permit 03041476 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
8 |
Status |
F |
Date |
2004-03-03 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2004-03-03 |
Time |
14:15 |
Rev Time |
0.50 |
Received By |
shill |
Date |
2004-03-03 |
Time |
14:15 |
Sent To |
|
|
Notes |
2004-03-03 00:00:00 | ****CORRECTIONS**** | | | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | 561-805-6724 | | | | STAIR DRAWINGS PREPARED BY ORLANDO | | M. FORTUN CONSULTING ENGINEERS, PA | | | | THE AUTHORIZATION NUMBER IS TO BE ON | | EACH SHEET.THE PRINTED NAME &LICENSE# | | OF THE PERSON SEALING THE DOCUMENT IS TO | | BE ON EACH SHEET.THE SIGNATURE IS TO | | BE A FULL SIGNATURE AS PER THE FBPE AND | | BUILDING OFFICIAL.THE RAISED SEAL IS | | TO BE LEGIBLE. | | | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | 561-805-6724 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
7 |
Status |
P |
Date |
2004-03-03 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2004-03-03 |
Time |
14:11 |
Rev Time |
0.50 |
Received By |
shill |
Date |
2004-03-03 |
Time |
14:11 |
Sent To |
|
|
Notes |
2004-03-03 00:00:00 | REVISED A7, A8, A9 DATED 2/10/04 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
6 |
Status |
F |
Date |
2004-01-29 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2004-02-18 |
Time |
12:52 |
Rev Time |
0.50 |
Received By |
shill |
Date |
2004-01-29 |
Time |
19:14 |
Sent To |
|
|
Notes |
2004-01-29 00:00:00 | ****CORRECTIONS**** | | REVISION | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | 561-805-6724 | | | | 1.)FASTENERS FOR USP TA20R CONFLICT | | WITH THE CATALOG. | | | | 2.)SUBMIT ORIGINAL, SEALED STAIR | | DETAILS.FINAL DRAWINGS FILED FOR | | PUBLIC RECORD ARE TO BE SIGNED, DATED | | AND SEALED FS471.025. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
5 |
Status |
N |
Date |
2004-01-02 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2004-01-27 |
Time |
10:57 |
Rev Time |
0.50 |
Received By |
shill |
Date |
2004-01-02 |
Time |
10:24 |
Sent To |
|
|
Notes |
2004-01-02 00:00:00 | RESTAMP |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
P |
Date |
2003-06-12 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-12-31 |
Time |
13:08 |
Rev Time |
0.50 |
Received By |
sthyng |
Date |
2003-06-12 |
Time |
15:19 |
Sent To |
|
|
Notes |
2003-06-12 00:00:00 | *****PROVISO******** | | SUBMIT HURRICANE SHUTTER ATTACHMENT | | SCHEDULE WITH CORRECT ANCHORS AND | | SPACING. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2003-06-11 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-06-12 |
Time |
15:13 |
Rev Time |
1.00 |
Received By |
sthyng |
Date |
2003-06-11 |
Time |
13:21 |
Sent To |
|
|
Notes |
2003-06-11 00:00:00 | IMPACT FEES ONLY |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2003-06-04 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-06-11 |
Time |
10:26 |
Rev Time |
1.00 |
Received By |
sthyng |
Date |
2003-06-04 |
Time |
14:17 |
Sent To |
|
|
Notes |
2003-06-04 00:00:00 | *****CORRECTIONS****** | | | | 1.)IMPACT FEES; SEE PREVIOUS LIST | | ITEM #2. | | | | 2.)ITEM #3 FROM PREVIOUS LIST NOT | | ADDRESSED (COLUMN LEGEND ILLEGIBLE ON | | SHEET A3). | | | | 3.)ITEM #4 FROM PREVIOUS LIST;U WAS | | CORRECTED BUT NOT BB. | | | | 4.)ITEM #5 FROM PREVIOUS LIST; Q & R | | AS TEMPERED ON WINDOW SCHEDULE. | | | | 5.)ITEM #7 FROM PREVIOUS LIST; TRUSS | | CONNECTORS FROM 2003 CATALOG; DO NOT | | INCLUDE STRESS INCREASES FOR STEEL. | | READ PP 6 & 7 OF USP CATALOG. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2003-05-16 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2003-06-04 |
Time |
11:35 |
Rev Time |
3.00 |
Received By |
sthyng |
Date |
2003-05-15 |
Time |
12:05 |
Sent To |
|
|
Notes |
2003-05-15 00:00:00 | **********CORRECTIONS*********** | | | | 1.)A NOTICE OF COMMENCEMENT MUST BE | | FILED WITH THE CLERK OF COURTS BEFORE A | | PERMIT CAN BE ISSUED. | | | | 2.)IMPACT FEES MUST BE PAID TO PALM | | BEACH COUNTY; CALL 233-5025 FOR MORE | | INFORMATION.THE PLANS MUST BE STAMPED | | AND THE RECEIPT ATTACHED TO THE | | APPLICATION. | | | | 3.)THE COLUMN LEGEND ON SHEET A3 IS | | PARTIALLY ILLEGIBLE. | | | | 4.)SHOW WINDOWS BB AND U AS TEMPERED | | ON THE FLOOR PLAN, SHEET A6. | | | | 5.)SHOW WINDOWS Q AND R AS TEMPERED | | ON THE WINDOW SCHEDULE, A1. | | | | 6.)THE WINDOW AND SGD JAMB DETAIL, | | AND THE 'REPAIR MASONRY GAPS' DETAIL, | | SHEET A12, MUST COMPLY WITH FBC | | 1707.4.4.2. | | | | 7.)SOME VALUES FOR THE USP CONNECTORS | | ARE INCORRECT (SHEET A8).REFER TO | | THE 2003 CATALOG. | | | | 8.)PROVIDE LEGIBLE PRODUCT APPROVALS | | (SINGLE HUNG WINDOW, TILE SPECS). | | | | 9.)SOME PANEL LENGTHS ON THE | | HURRICANE SHUTTER INSTALLATION SCHEDULE | | EXCEED THE MAX LENGTH FOR THE DESIGN | | PRESSURE INDICATED.REVISE. | | | | 10.)SHEET A5, BEARING WALL NOTE IS | | ILLEGIBLE. | | | | 11.)PROVIDE A SOILS INVESTIGATION | | REPORT. | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CALL | | SAMANTHA THYNG, BUILDING PLANS EXAMINER | | [email protected] |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
P |
Date |
2004-02-18 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2004-02-18 |
Time |
12:51 |
Rev Time |
0.33 |
Received By |
btrobaug |
Date |
2004-02-18 |
Time |
12:38 |
Sent To |
B |
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
F |
Date |
2004-01-27 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-02-17 |
Time |
08:46 |
Rev Time |
0.50 |
Received By |
btrobaug |
Date |
2004-01-27 |
Time |
10:55 |
Sent To |
B |
|
Notes |
2004-01-27 00:00:00 | | | FAILED | | ~~~~~~ | | ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ | | PLEASE MAKE THE FOLLOWING CORRECTIONS | | FOR CODE COMPLIANCE AND RESUBMIT FOR | | REVIEW. | | | | 1} THE RISER DIAGRAM AND THE PANEL | | SCHEDULE FEEDER SIZE FOR SUB PANEL DO | | NOT CORRELATE.SEE 1-15 #14 ON SCHEDULE | | & 3 #6'S ON RISER. | | | | 2} REVISION #3 SHOWS THE ADDITION OF | | AN"INSTA HOT",BUT THE ADDED LOAD DOES | | NOT APPEAR ON THE SCHEDULE. | | | | 3} PLEASE RECALCULATE THE TOTAL LOAD. | | 45.7 DOES NOT SEEM TO BE CORRECT. | | | | 4} THE TITLE BLOCK DOES NOT CONTAIN THE | | FIRM LICENSE NUMBER PER 61G1-16.004(2). | | | | BILL TROBAUGH | | ELECTRICAL PLAN REVIEW | | 561/805-6718 | | [email protected] |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2003-04-30 |
|
|
Cont ID |
|
Sent By |
sgraham |
Date |
2003-04-25 |
Time |
08:43 |
Rev Time |
0.50 |
Received By |
btrobaug |
Date |
2003-04-30 |
Time |
09:29 |
Sent To |
P |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
6 |
Status |
N |
Date |
2004-02-17 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-02-17 |
Time |
08:46 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-02-17 |
Time |
08:46 |
Sent To |
E |
|
Notes |
2004-02-17 00:00:00 | TO BT DESK/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
2003-12-31 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-12-31 |
Time |
13:08 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-12-31 |
Time |
13:08 |
Sent To |
B |
|
Notes |
2003-12-31 00:00:00 | TO SH DESK/RESTAMP |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2003-06-12 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-06-12 |
Time |
15:13 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-06-12 |
Time |
15:13 |
Sent To |
B |
|
Notes |
2003-06-12 00:00:00 | STHYNG DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2003-06-11 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-06-11 |
Time |
10:26 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-06-11 |
Time |
10:26 |
Sent To |
B |
|
Notes |
2003-06-11 00:00:00 | STHYNG DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2003-05-28 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-05-28 |
Time |
15:30 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-05-28 |
Time |
15:30 |
Sent To |
P |
|
Notes |
2003-05-28 00:00:00 | KSTEVENS DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2003-04-21 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-04-21 |
Time |
09:13 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-04-21 |
Time |
09:13 |
Sent To |
Z |
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
P |
Date |
2003-06-04 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2003-06-04 |
Time |
11:29 |
Rev Time |
0.10 |
Received By |
pkrauss |
Date |
2003-06-04 |
Time |
11:23 |
Sent To |
B |
|
Notes |
2003-06-04 00:00:00 | MECHANICAL PERMIT 03041525 | | PLANS APPROVED 5-14-03 |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2003-05-15 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2003-05-31 |
Time |
07:45 |
Rev Time |
0.20 |
Received By |
pkrauss |
Date |
2003-05-15 |
Time |
09:50 |
Sent To |
B |
|
Notes |
2003-05-15 00:00:00 | DENIED:MECHANICAL PERMIT 03041525 | | | | MECHANICAL FLOOR PLAN DOES NOT MATCH A-5 | | & A-6.MECHANICAL FLOOR PLAN IS | | "REVERSED".PLEASE CLARIFY | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | CONTACT PATTY KRAUSS AT (561) 805-6719. |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2003-05-31 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2003-05-31 |
Time |
07:45 |
Rev Time |
0.33 |
Received By |
kstevens |
Date |
2003-05-31 |
Time |
07:34 |
Sent To |
M |
|
Notes |
2003-05-31 00:00:00 | PASSED/PROVISO - REVISION REQUIRED - | | TUB & SHR NOT VENTED. |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2003-05-10 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-05-28 |
Time |
15:30 |
Rev Time |
0.50 |
Received By |
kstevens |
Date |
2003-05-10 |
Time |
15:39 |
Sent To |
M |
|
Notes |
2003-05-10 00:00:00 | DENIED | | REFERENCE: FBC-2001 PLUMBING | | | | 1) SANITARY RISER DIAGRAM DOES NOT RE- | | FLECT THE FLOOR PLAN. | | 2) SHOWER NOT SHOWN ON FIRST FLOOR. | | 3) MASTER BATH IS OVER KITCHEN AND BATH | | #2 IS ON THE OTHER SIDE OF THE HOUSE. | | | | REVIEW BY KEN STEVENS | | (561) 659-8096 EXT 8377 | | (561) 805-6721 | | FAX (561) 653-2692 |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2003-04-25 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-04-21 |
Time |
09:13 |
Rev Time |
0.00 |
Received By |
sgraham |
Date |
|
Time |
|
Sent To |
E |
|
Notes |
|
|