Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-06-30 Cont ID  
Sent By jgomez Date 2003-06-30 Time 15:17 Rev Time 0.50
Received By jgomez Date 2003-06-30 Time 15:17 Sent To PC
Notes
2003-06-30 00:00:00BUILDING PROVISO:
 1-STORM SHUTTERS INSTALLATION SCHEDULE:
 REVISE SPACING FOR WOOD ANCHOR. SEE
 THE ENGINEERED DRAWINGS.
 2-UPDATE THE TRUSS ANCHOR SCHEDULE AND
 ALL DETAILS THAT ARE AFFECTED BY SEC.
 1609.4.3 FBC 2001, WHICH DOES NOT
 ALLOW THE STEEL STRESS TO BE INCREASED

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2003-05-05 Cont ID  
Sent By shernand Date 2003-06-03 Time 08:22 Rev Time 2.00
Received By jgomez Date 2003-05-05 Time 16:43 Sent To  
Notes
2003-05-05 00:00:00BUILDING REVIEW APPROVED WITH PROVISO:
 1-RESUBMIT STORM SHUTTERS INFORMATION
 WITH UPDATED SBCCI PRODUCT APPROVAL
 THAT MATCHES ENGINEERED DRAWINGS.
 2-REVISE DETAIL S-21 FOR COLUMN BETWEEN
 GARAGE AND STAIRWAY TO MATCH CONDITION
 SHOWN ON 2ND FLOOR FRAMING PLAN. SEC.
 104.2.1.2 CITY AMENDMENTS TO FBC 2001.
 3-ROOF FRAMING PLAN: REVISE CONNECTOR
 TC-1 FOR FRAMED WALL. NEED WOOD TO
 WOOD CONNECTOR. SEC. 104.2.1.2 CITY
 AMENDMENTS TO FBC 2001.
 4-WINDOW 34SH DOESN'T PROVIDE THE 24"
 CLEAR HEIGHT AS REQUIRED BY SECTION
 1005.4 FBC 2001. REVISE AS REQUIRED.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-10-03 Cont ID  
Sent By btrobaug Date 2003-10-03 Time 17:03 Rev Time 0.33
Received By btrobaug Date 2003-10-03 Time 17:03 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-04-23 Cont ID  
Sent By csiegber Date 2003-09-19 Time 08:21 Rev Time 0.50
Received By btrobaug Date 2003-04-23 Time 19:36 Sent To M
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2003-09-25 Cont ID  
Sent By csiegber Date 2003-09-25 Time 09:57 Rev Time 0.00
Received By csiegber Date 2003-09-25 Time 09:57 Sent To M
Notes
2003-09-25 00:00:00TO PK DESK

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-09-19 Cont ID  
Sent By csiegber Date 2003-09-19 Time 08:21 Rev Time 0.00
Received By csiegber Date 2003-09-19 Time 08:21 Sent To E
Notes
2003-09-19 00:00:00TO BT DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-06-03 Cont ID  
Sent By shernand Date 2003-06-03 Time 08:21 Rev Time 0.00
Received By shernand Date 2003-06-03 Time 08:21 Sent To B
Notes
2003-06-03 00:00:00JGOMEZ DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-04-11 Cont ID  
Sent By shernand Date 2003-04-11 Time 14:44 Rev Time 0.00
Received By shernand Date 2003-04-11 Time 14:44 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2003-09-30 Cont ID  
Sent By pkrauss Date 2003-09-30 Time 08:00 Rev Time 0.20
Received By pkrauss Date 2003-09-30 Time 08:00 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-05-05 Cont ID  
Sent By csiegber Date 2003-09-25 Time 09:58 Rev Time 0.15
Received By pkrauss Date 2003-05-05 Time 09:08 Sent To B
Notes
2003-05-05 00:00:00MECHANICAL PERMIT 03040933

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-04-23 Cont ID  
Sent By jleech Date 2003-04-23 Time 18:28 Rev Time 0.33
Received By jleech Date 2003-04-23 Time 18:28 Sent To E
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2003-05-05 Cont ID  
Sent By shernand Date 2003-04-11 Time 14:44 Rev Time 0.00
Received By jgomez Date 2003-05-05 Time 16:42 Sent To  
Notes
2003-05-05 00:00:00APPROVED BY SHIRLEY GRAHAM ON 4-16-03.
 SEE SURVEY.