Plan Review Details - Permit 03040916
Plan Review Stops For Permit 03040916
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-06-30 Cont ID  
Sent By jgomez Date 2003-06-30 Time 14:58 Rev Time 0.50
Received By jgomez Date 2003-06-30 Time 14:58 Sent To PC
Notes
2003-06-30 00:00:00SUBMITTAL APPROVED WITH PROVISO:
 1-STORM SHUTTERS INSTALLATION SCHEDULE:
 REVISE SPACING OF WOOD ANCHORS. SEE
 THE ENGINEERED DRAWINGS.
 2-UPDATE TRUSS ANCHOR SCHEDULE AND ALL
 DETAILS THAT ARE AFFECTED BY SECTION
 1609.4.3 FBC 2001, WHICH DOES NOT
 ALLOW THE STEEL STRESS TO BE INCREASED

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2003-05-06 Cont ID  
Sent By shernand Date 2003-06-03 Time 08:16 Rev Time 2.00
Received By jgomez Date 2003-05-06 Time 09:23 Sent To  
Notes
2003-05-06 00:00:00BUILDING REVIEW APPROVED WITH PROVISO:
 1-RESUBMIT STORM SHUTTERS INFORMATION
 WITH UPDATED SBCCI REPORT THAT MATCHES
 ENGINEERED DRAWINGS.
 2-REVISE DETAIL S21 FOR COLUMN LOCATED
 BETWEEN GARAGE AND STAIRWAY TO MATCH
 CONDITIONS SHOWN ON 2ND. FL. FRAMING
 PLAN. SEC. 104.2.1.2 CITY AMENDMENTS
 TO FBC 2001.
 3-ROOF FRAMING PLAN: REVISE CONNECTOR
 TC-1 AT FRONT FRAMED WALL. NEED WOOD
 TO WOOD CONNECTOR. SECTION 104.2.1.2
 CITY AMENDMENTS TO FBC 2001.
 4-WINDOW 34SH DOESN'T PROVIDE THE 24"
 CLEAR HEIGHT REQUIRED BY SEC. 1005.4
 FBC 2001. REVISE AS REQUIRED.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-09-30 Cont ID  
Sent By btrobaug Date 2003-09-30 Time 12:00 Rev Time 0.33
Received By btrobaug Date 2003-09-30 Time 12:00 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-04-23 Cont ID  
Sent By csiegber Date 2003-09-17 Time 16:34 Rev Time 0.50
Received By btrobaug Date 2003-04-23 Time 18:49 Sent To M
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2003-09-29 Cont ID  
Sent By csiegber Date 2003-09-29 Time 11:09 Rev Time 0.00
Received By csiegber Date 2003-09-29 Time 11:09 Sent To M
Notes
2003-09-29 00:00:00TO PK BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-09-17 Cont ID  
Sent By csiegber Date 2003-09-17 Time 16:34 Rev Time 0.00
Received By csiegber Date 2003-09-17 Time 16:34 Sent To E
Notes
2003-09-17 00:00:00TO BT DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-06-03 Cont ID  
Sent By shernand Date 2003-06-03 Time 08:15 Rev Time 0.00
Received By shernand Date 2003-06-03 Time 08:15 Sent To B
Notes
2003-06-03 00:00:00JGOMEZ DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-04-11 Cont ID  
Sent By shernand Date 2003-04-11 Time 14:50 Rev Time 0.00
Received By shernand Date 2003-04-11 Time 14:50 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2003-10-01 Cont ID  
Sent By pkrauss Date 2003-10-01 Time 07:51 Rev Time 0.20
Received By pkrauss Date 2003-10-01 Time 07:51 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-05-05 Cont ID  
Sent By csiegber Date 2003-09-29 Time 11:09 Rev Time 0.15
Received By pkrauss Date 2003-05-05 Time 08:39 Sent To B
Notes
2003-05-05 00:00:00MECHANICAL PERMIT 03040948

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-04-23 Cont ID  
Sent By jleech Date 2003-04-23 Time 18:31 Rev Time 0.33
Received By jleech Date 2003-04-23 Time 18:31 Sent To E
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2003-05-06 Cont ID  
Sent By shernand Date 2003-04-11 Time 14:50 Rev Time 0.00
Received By jgomez Date 2003-05-06 Time 09:22 Sent To  
Notes
2003-05-06 00:00:00APPROVED BY SHIRLEY GRAHAM 4-16-03. SEE
 SURVEY.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved