Plan Review Details - Permit 03040605
Plan Review Stops For Permit 03040605
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-05-07 Cont ID  
Sent By rmcdouga Date 2003-05-07 Time 16:46 Rev Time 2.00
Received By rmcdouga Date 2003-05-07 Time 16:46 Sent To  
Notes
2003-05-07 00:00:00BUILDING PROVISO
  
 1) SUBMIT A SOIL BORING TEST REPORT AS
 REQUIRED BY CITY AMEND. TO FBC 1804.2.2,
 PRIOR TO POURING THE FOUNDATION.
  
 2) SUBMIT REVISED TRUSS CONNECTOR UPLIFT
 VALUES THAT DO NOT INCLUDE A STRESS
 INCREASE ON THE STEEL CALCULATIONS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2003-05-05 Cont ID  
Sent By hmoser Date 2003-04-23 Time 18:59 Rev Time 4.00
Received By rmcdouga Date 2003-05-05 Time 10:11 Sent To  
Notes
2003-05-05 00:00:00BUILDING DENIED
  
 1) A RECORDED COPY OF THE NOTICE OF
 COMMENCEMENT MUST BE SUBMITTED BEFORE A
 PERMIT CAN BE ISSUED.
  
 2) PROVIDE A SOIL BORING TEST REPORT AS
 REQUIRED BY THE CITY AMENDMENTS TO THE
 FBC 1804.2.2.
  
 3) THE COVERED PATIO SHOWN ON THE
 SURVEY DOES NOT MATCH THE PLANS.
  
 4) SPECIFY THE LENGTH/EMBEDMENT DEPTH OF
 THE 1/2" DIAMETER EXPANSION ANCHORS USED
 AT THE WOOD FRAME TO CONCRETE WALL
 CONNECTION ON SHEET A6.
  
 5) THE COLUMN SCHEDULE ON S1 SPECIFIES
 TWO 2X4S FOR POST C2 AND THE NOTE ON THE
 FOUNDATION PLAN AT C2 SPECIFIES THREE
 2X4S FOR THE POST. PLEASE CLARIFY.
  
 6) STRESS INCREASES FOR THE SHORT TERM
 LAOD OF STEEL ARE NO LONGER ALLOWED TO
 BE TAKEN BY FBC 1609.4.3. SEE THE 2003
 USP CATALOG FOR LOAD VALUES THAT DO NOT
 INCLUDE A STRESS INCREASE ON THE STEEL
 CALCULATIONS. PLEASE REVISE THE
 CONNECTOR UPLIFT VALUES ACCORDINGLY.
  
 7) PLEASE REVISE NOTE #7 UNDER EXTERIOR
 SOFFIT SPECS. ON A5 TO INDICATE THAT
 3/8" HIGH RIB METAL LATH IS REQUIRED TO
 BE FASTENED AT EVERY RIB (4"O.C.) PER
 ASTM C 1063. PLEASE CORRECT.
 NOTES 4 AND 5 ARE THE SAME.
  
 8) PROVIDE A PRODUCT APPROVAL FOR THE
 OUTSWING GLAZED DOOR AT THE CABANA BATH.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)659-8096 EXT.8202

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-09-02 Cont ID  
Sent By btrobaug Date 2003-09-02 Time 15:41 Rev Time 0.50
Received By btrobaug Date 2003-09-02 Time 15:37 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-04-23 Cont ID  
Sent By csiegber Date 2003-08-25 Time 08:34 Rev Time 0.50
Received By btrobaug Date 2003-04-23 Time 17:21 Sent To M
Notes
2003-04-23 00:00:00REDLINED FOR 220-16 B & 250-22./WRT.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-08-25 Cont ID  
Sent By csiegber Date 2003-08-25 Time 08:34 Rev Time 0.00
Received By csiegber Date 2003-08-25 Time 08:34 Sent To E
Notes
2003-08-25 00:00:00TO BT DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-04-09 Cont ID  
Sent By shernand Date 2003-04-09 Time 09:41 Rev Time 0.00
Received By shernand Date 2003-04-09 Time 09:40 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-04-23 Cont ID  
Sent By btrobaug Date 2003-04-23 Time 17:43 Rev Time 0.25
Received By hmoser Date 2003-04-23 Time 18:58 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-04-21 Cont ID  
Sent By alange Date 2003-04-21 Time 19:42 Rev Time 0.33
Received By alange Date 2003-04-21 Time 19:42 Sent To E
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2003-04-09 Cont ID  
Sent By shernand Date 2003-04-09 Time 09:41 Rev Time 0.00
Received By sgraham Date   Time   Sent To E
Notes
***NONE***