Plan Review Details - Permit 03040601
Plan Review Stops For Permit 03040601
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-06-05 Cont ID  
Sent By rmcdouga Date 2003-06-05 Time 07:59 Rev Time 2.00
Received By rmcdouga Date 2003-06-05 Time 07:59 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2003-05-20 Cont ID  
Sent By shernand Date 2003-06-04 Time 14:39 Rev Time 4.00
Received By rmcdouga Date 2003-05-20 Time 10:23 Sent To  
Notes
2003-05-20 00:00:00BUILDING DENIED
  
 1) A RECORDED COPY OF THE NOTICE OF
 COMMENCEMENT MUST BE SUBMITTED BEFORE A
 PERMIT CAN BE ISSUED.
  
 2) SUBMIT THE PAID RECEIPT FOR THE
 IMPACT FEES.
  
 3) SUBMIT A SOIL BORING TEST REPORT AS
 REQUIRED BY CITY AMEND. TO FBC 1804.2.2.
  
 4) THE OWNER INFORMATION LISTED ON THE
 APPLICATION DOES NOT MATCH THE OWNER OF
 RECORD WITH THE CITY OR COUNTY.
  
 5) THE OWNER AND CONTRACTOR INFORMATION
 ON THE ENERGY CALCULATIONS DOES NOT
 MATCH THE APPLICATION OR CITY RECORDS.
  
 6) REVISE STUCCO NOTES ON A5. SPECIFY
 THE FASTENER SIZE IN NOTE 3. INDICATE IN
 NOTE 7 THAT 3/8" HIGH RIB METAL LATH IS
 REQUIRED TO BE FASTENED AT EVERY RIB
 (4"O.C.). NOTES 4 AND 5 ARE EXACTLY THE
 SAME.
  
 7) SPECIFY THE LENGTH/EMBEDMENT DEPTH OF
 THE 1/2" DIAMETER EXP. ANCHORS AT THE
 WOOD FRAME TO CONCRETE WALL DETAIL ON A6
 UPDATE THE SEMCO TPP4 OR TPP6 CONNECTORS
 SEMCO WAS PURCHASED BY USP.
  
 8) THE COLUMN SCHEDULE ON S-1 LISTS C2
 AS (2) 2X4 POSTS AND THE NOTE ON THE
 FOUNDATION PLAN SPECIFIES (3) 2X4 WOOD
 POSTS AT C2. PLEASE CLARIFY.
  
 9) THE SURVEYS SUMITTED DO NOT MATCH THE
 PLANS AT THE COVERED PATIO.
  
 10) REVISE THE UPLIFT VALUES FOR THE
 TRUSS CONNECTORS TO REFLECT THE VALUES
 THAT DO NOT HAVE STRESS INCREASES FOR
 THE STEAL CALCULATIONS. SEE 2003 USP
 CATALOG AND FBC 1609.4.3.
  
 11) ONE OF THE LOCATIONS WHERE THE STEEL
 COLUMN CAP DETAIL 4 ON S2 IS SPECIFIED
 IS SHOWN ON THE FLOOR PLAN CARRYING TWO
 GIRDERS AT 90 DEGREE ANGLES. THIS IS NOT
 INDICATED BY THE DETAIL.
  
 12) DETAIL 1 ON S2 DOES NOT INDICATE HOW
 THE FLOOR TRUSS IS ATTACHED TO THE BLOCK
 WALL.
  
 13) THE "USP" RT20T CONNECTOR IN DETAIL
 3 ON S2 REQUIRES (14) NAILS EQUALLY
 DISTRIBUTED ON EACH SIDE OF THE
 CONNECTION PER USP CATALOG.
  
 14) THE ROOF SHEATHING NAILING ZONE
 DIAGRAM DOES NOT INDICATE THAT THE
 GABLE ENDS AT THE GARAGE AND SECOND
 FLOOR BATHROOM ARE ZONE 3.
  
 15) SUBMIT PRODUCT APPROVALS FOR THE
 SLIDING GLASS DOORS.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)659-8096 EXT.8202

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2003-10-02 Cont ID  
Sent By dpalmer Date 2003-10-02 Time 09:35 Rev Time 0.33
Received By dpalmer Date 2003-10-02 Time 09:35 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status N Date 2003-04-28 Cont ID  
Sent By csiegber Date 2003-09-23 Time 16:48 Rev Time 0.33
Received By btrobaug Date 2003-04-28 Time 10:28 Sent To P
Notes
2003-04-28 00:00:00 
 THIS PLAN WAS ON THE INCOMING TABLE THIS
 A.M,SENT TO PLUMBING./WRT

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-04-16 Cont ID  
Sent By btrobaug Date 2003-04-16 Time 13:18 Rev Time 0.50
Received By btrobaug Date 2003-04-16 Time 12:18 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2003-09-23 Cont ID  
Sent By csiegber Date 2003-09-23 Time 16:48 Rev Time 0.00
Received By csiegber Date 2003-09-23 Time 16:47 Sent To E
Notes
2003-09-23 00:00:00TO DP DESK

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2003-06-04 Cont ID  
Sent By rmcdouga Date 2003-06-05 Time 08:35 Rev Time 0.00
Received By shernand Date 2003-06-04 Time 14:39 Sent To B
Notes
2003-06-04 00:00:00RM DESK

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-06-03 Cont ID  
Sent By mmclean Date 2003-06-04 Time 12:06 Rev Time 0.00
Received By shernand Date 2003-06-03 Time 12:28 Sent To Z
Notes
2003-06-03 00:00:00RESUB FOR ZONING AND BUILDING

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-04-18 Cont ID  
Sent By shernand Date 2003-04-18 Time 16:31 Rev Time 0.00
Received By shernand Date 2003-04-18 Time 16:31 Sent To Z
Notes
2003-04-18 00:00:00BROUGHT SURVEY FOR ZONING APPROVAL.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-04-09 Cont ID  
Sent By shernand Date 2003-04-09 Time 09:42 Rev Time 0.00
Received By shernand Date 2003-04-09 Time 09:42 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-05-12 Cont ID  
Sent By pkrauss Date 2003-05-12 Time 08:33 Rev Time 0.15
Received By pkrauss Date 2003-05-12 Time 08:33 Sent To P
Notes
2003-05-12 00:00:00MECH PERMIT 03040694

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-05-16 Cont ID  
Sent By pkrauss Date 2003-05-12 Time 08:38 Rev Time 0.50
Received By kstevens Date 2003-05-16 Time 15:59 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2003-06-05 Cont ID  
Sent By shernand Date 2003-06-03 Time 12:28 Rev Time 0.00
Received By rmcdouga Date   Time   Sent To I
Notes
2003-06-05 00:00:006/4/03 PASS ZONING MM
2003-04-09 00:00:00DENIED NEED SURVEY