2003-04-09 00:00:00 | UNSAT |
| ~~~~~ |
| ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ |
| PLEASE PROVIDE THE FOLLOWING |
| INFORMATION MAKE NECESSARY CHANGES TO |
| PLANS AND RESUBMIT FOR REVIEW. |
| |
| 1} THE PLANS SUBMITTED INCLUDE INTERIOR |
| WIRING,BUT NONE IS DESCRIBED ON THE |
| APPLICATION,PLEASE CLARIFY THE SCOPE OF |
| WORK AND SUBMIT PLANS INDICATING SAME. |
| |
| 2} THE LAUNDRY CIRCUIT LISTED ON THE |
| PANEL SCHEDULE AND THE LOAD CALC MUST |
| COMPLY WITH 220-16(B). |
| |
| 3} THERE ARE 3 SMALL APPLIANCE CIRCUITS |
| IN THE CALCS BUT ONLY 2 ON PANEL SCHED. |
| PLEASE CORRELATE. |
| |
| 4} THE RISER DIAGRAM SHOWS THE 200 AMP |
| PANEL AS BEING REMOVED? SHOW NEW PANEL |
| LOCATION. |
| |
| 5} THE 3000 VA WATER HEATER WOULD APPEAR |
| TO HAVE AN INCORRECT OCP @3O AMPS, |
| PLEASE CLARIFY. |
| |
| 6} PLEASE SUBMIT AIC RATINGS FOR |
| ALL NEW EQUIPMENT BEING INSTALLED. |
| MAINS/PANELS/BREAKERS MUST BE RATED FOR |
| THE AVAILABLE FAULT CURRENT PER 110-9. |
| |
| 7} PLEASE LIST THE REQ'D BATH(S) |
| CIRCUIT(S). PER 210-11-C-3 |
| MUST BE 20A AND #12AWG,AND SHALL SERVE |
| ONLY THE BATH,SCHEDULE SHOWS 1 CKT @ 30 |
| AMPS AND KITCHEN ON SAME CIRCUIT. |
| |
| 8} THE DRYER CIRCUIT MUST COMPLY WITH |
| 220-18.(5000 VA) |
| |
| 9} PLEASE LIST THE REQ'D ARC |
| FAULT PROTECTED CIRCUITS ON PANEL |
| SCHEDULE PER 210-12. |
| |
| IF THERE ARE ANY QUESTIONS PLEASE CALL. |
| |
| BILL TROBAUGH |
| ELECTRICAL PLAN REVIEW |
| CITY OF WEST PALM BEACH |
| 561/659-8096 EXT.8392 |