Plan Review Details - Permit 03032421
Plan Review Stops For Permit 03032421
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2003-06-24 Cont ID  
Sent By jgomez Date 2003-06-24 Time 17:57 Rev Time 0.50
Received By jgomez Date 2003-06-24 Time 17:57 Sent To PC
Notes
2003-06-24 00:00:00IMPACT FEES PAID. PLANS APPROVED WITH
 PROVISO. SEE DRAWING A-2.

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status   Date 2003-06-17 Cont ID  
Sent By shernand Date 2003-06-24 Time 16:33 Rev Time 3.00
Received By jgomez Date 2003-06-17 Time 17:46 Sent To PC
Notes
2003-06-17 00:00:00BUILDING REVIEW APPROVED WITH PROVISO:
 1-PROVIDE SOIL TEST REPORT PRIOR TO
 CONSTRUCTION. SOIL TEST REPORT IN FILE
 IS PRELIMINARY ONLY AND IT REQUIRES
 ADDITIONAL BORINGS TO BE PERFORMED.
 SEE LIMITATIONS ON PRELIMINARY REPORT.
 2-UPDATE TRUSS ANCHOR SCHEDULE AND ALL
 DETAILS THAT ARE AFFECTED BY SECTION
 1609.4.3 FBC 2001, WHICH DOESN'T ALLOW
 THE STRESS INCREASE TO BE USED.
 **NOTE: ANCHORS HIGHLIGHTED ON THE USP
 2003 CATALOGUE ARE THE ONLY ONES THAT
 DON'T INCLUDE THE INCREASE. OTHERS DO.
 SEE FOOTNOTE ON USP 2003 CATALOGUE.
 3-REVISE DETAIL 2/A3. THIS CAN NOT BE A
 BEARING WALL ACCORDING TO THE SPECS
 SHOWN. SEC. 104.2.1.2 CITY AMENDMENTS
 TO FBC 2001.
 4-MISSING PRODUCT APPROVAL FOR SINGLE
 HUNG WINDOWS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2003-05-28 Cont ID  
Sent By kstevens Date 2003-06-14 Time 07:54 Rev Time 3.00
Received By jgomez Date 2003-05-28 Time 08:49 Sent To  
Notes
2003-05-28 00:00:00CHECKLIST:
 1-PROVIDE COPY OF THE SOIL TEST REPORT.
 2-ENERGY CALCULATIONS NEED TO BE SITE
 SPECIFIC OR CALCULATED FOR THE WORST
 CASE SCENARIO. REVISE AS REQUIRED.
 3-NEED TO UPDATE WORKER'S COMPENSATION
 INSURANCE.
 4-PAY IMPACT FEES AND FILE NOTICE OF
 COMMENCEMENT.
 5-SPECIFICATIONS FOR FIREBLOCKING DON'T
 APPLY ONLY TO CONCEALED SPACES UNDER
 STAIRS, BUT TO ALL CONCEALED SPACES
 IN THE BUILDING. SEE SEC. 2305 FBC
 2001 AND REVISE AS REQUIRED.
 6-SHEET A-6: A)REVISE HANDRAIL HT. SEE
 SEC. 1007.5.1 FBC 2001.
 B)THERE ARE NOT SPECS FOR RISER HEIGHT.
 SEE SEC. 1007.3.1 (EXCEPTION #1).
 C)TYPICAL TWO STORY WALL SECTION IS
 MISSING ALL THE CONNECTORS TOP & BOTT.
 FOR 2X FRAMED WALL. SEC. 104.2.1.2
 CITY AMENDMENTS TO FBC 2001.
 **NEED 7/8" MIN. STUCCO THICKNESS AS
 REQUIRED BY ASTM C-926.
 **REVISE WALL SHEATHING THICKNESS. SEE
 DIAPHRAGM SCHEDULE ON SHEET A-9.
 **SEE PLANS FOR ADDITIONAL COMMENTS.
 7-CLARIFY WHAT IS THE DETACHABLE SAFETY
 RAIL SPECIFIED ON ELEVATION ON SHEET
 A-4 AND WHERE IS IT GOING TO BE
 INSTALLED. SEC. 104.2.1.2 CITY AMENDM.
 8-UPDATE TRUSS SCHEDULE. 33% ALLOWABLE
 STRESS INCREASE IS NOT ALLOWED BY SEC.
 1609.4.3 FBC 2001. SEE USP 2003
 CATALOGUE WITH REVISED LOADS AND
 REVISE AS REQUIRED.
 9-PROVIDE COMPLETE DETAILS & STRUCTURAL
 INFORMATION FOR PRECAST GUARDRAIL
 INSTALLATION. DETAIL PROVIDE IS NOT
 COMPLETE. SEE SEC. 1608.2.2 FBC 2001.
 10-FOUNDATION PLAN: CLARIFY FOOTING AT
 GARAGE INTERIOR BEARING WALL. IS IT
 F8 OR TE-17? SEE PLAN.
 11-THERE ARE SOME CONNECTORS THAT ARE NO
 SPECIFIED. SEE FRAMING PLAN FOR
 COMMENTS. SEC. 104.2.1.2 CITY AMENDM.
 12-FRAMING DETAIL FOR ARCHED OPENINGS
 NEED TO HAVE 2X BLOCKS, NOT 1X BLOCKS
 TO PROVIDE STRUCTURAL SUPPORT FOR
 WINDOW. SEC. 104.2.1.2 CITY AMENDMENTS
 TO FBC 2001.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status   Date 2003-05-01 Cont ID  
Sent By kstevens Date 2003-05-24 Time 09:29 Rev Time 4.00
Received By jgomez Date 2003-05-01 Time 10:40 Sent To  
Notes
2003-05-01 00:00:00BUILDING REVIEW APPROVED WITH PROVISO:
 1-PROVIDE SOIL TEST REPORT PRIOR TO
 CONSTRUCTION.
 2-SHEET C-1: SPECIFY THE APPLICABLE
 INTERNAL PRESSURE COEFFICIENT ON THE
 DESIGN INFORMATION AS REQUIRED BY SEC.
 1606.1.7 FBC 2001.
 3-PROVIDE COMPLETE DETAIL/SPECIFICATIONS
 FOR HANGING AIR HANDLER UNIT FROM
 TRUSSES. SPECIFY ALL FASTENERS. SEC.
 104.2.1.2 CITY AMENDMENTS TO FBC 2001.
 4-PROVIDE SPECIFICATIONS FOR FIREBLOCK'G
 AT ALL CONCEALED SPACES AS REQUIRED BY
 SEC. 2305 FBC 2001. INCLUDING STAIRS.
 5-PROVIDE COMPLETE DETAILS AND SPECS FOR
 HANDRAIL HEIGHT AND OPENINGS ALLOWANCE
 AS REQUIRED BY SEC. 1007.5 FBC 2001.
 6-SPECIFY SAFETY GLASS FOR WINDOW AT
 COVERED ENTRY. SEC. 2405.2 FBC 2001.
 7-CLARIFY WHAT IS THE DETACHABLE SAFETY
 RAIL SPECIFIED ON ELEVATION ON SHEET
 A-4. SEC. 104.2.1.2 CITY AMENDMENTS.
 8-UPDATE TRUSS SCHEDULE. SEE UPDATED
 USP CATALOGUE (2003). ALSO, PROVIDE
 ENGINEERING CALCULATIONS FOR VALUES
 OTHER THAN THOSE SHOWN BY USP. SECTION
 104.2.1.2 CITY AMENDMENTS TO FBC 2001.
 **NOTE: ALSO CONSIDER THAT IF USING 10D
 NAILS, THEN IT NEEDS 1 3/4" MINIMUM
 PENETRATION TO USE THIS VALUES. ONE
 TRUSS DOESN'T HAVE THIS THICKNESS.
 9-ROOF FRAMING PLAN: REVISE CONNECTORS
 SPECIFIED FOR FRAMED WALLS. NEED WOOD
 TO WOOD CONNECTORS. SEC. 104.2.1.2
 CITY AMENDMENTS TO FBC 2001.
 10-PROVIDE COMPLETE DETAILS & STRUCTURAL
 INFORMATION FOR PRECAST GUARDRAIL TO
 BE USED ON 2ND FLOOR BALCONY.SECTION
 1015 FBC 2001 AND SEC. 104.2.1.2 CITY
 AMENDMENTS TO FBC 2001.
 11-SHEET A-1: CLARIFY FOOTING AT GARAGE
 INTERIOR BEARING WALL. F8 OR TE-1?.
 DETAIL #2 DOESN'T APPLY AT GARAGE.
 REVISE AS REQUIRED.
 DETAIL 38 NEED 12" MIN. BELOW GRADE.
 12-PROVIDE COMPLETE/CORRECT INFORMATION
 FOR STORM SHUTTERS UNDER A SEPARATE
 PERMIT.

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2004-06-15 Cont ID  
Sent By dpalmer Date 2004-06-15 Time 10:43 Rev Time 0.33
Received By dpalmer Date 2004-06-15 Time 10:43 Sent To  
Notes
2004-06-15 00:00:00MISSING EQUIPMENT GROUNDING FROM MAIN
 PANEL TO 60A SUB PANEL.
 REDLINED.

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2003-07-14 Cont ID  
Sent By mjacobs Date 2004-06-14 Time 15:33 Rev Time 0.25
Received By dpalmer Date 2003-07-14 Time 12:54 Sent To  
Notes
2003-07-14 00:00:00************ NOTE *********
  
 PLANS STILL SHOW WRONG GROUNDING ELEC-
 -TRODE COND. 310-15/250-66

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-05-16 Cont ID  
Sent By shernand Date 2003-07-07 Time 12:02 Rev Time 0.50
Received By dpalmer Date 2003-05-16 Time 15:54 Sent To P
Notes
2003-05-16 00:00:00PLANS STILL SHOW WRONG SIZE ELECTRODE
 GROUNDING CONDUCTOR. NEEDS TO BE #2
 250-66

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2003-04-10 Cont ID  
Sent By shernand Date 2003-05-15 Time 16:35 Rev Time 0.33
Received By dpalmer Date 2003-04-10 Time 03:34 Sent To P
Notes
2003-04-10 00:00:00************* UNSAT ***************
  
 1)NOTE: PLEASE SIZE GROUNDING ELECTRODE
 CONDUCTOR PER 250-66. PLEASE NOTE, SEC`S
 ARE BASED ON 310-15FOR 400A SERVICE.
  
 2)NOTE: PLEASE SUBMIT PANEL SCHEDULE FOR
 PANEL "C" AS SHOWN ON RISER?
  
 3)NOTE: PLEASE SEE MISSING EQUIPMENT
 GROUNDING COND FROM MAIN DISC TO PANEL
 "B". 250-122
  
 4)NOTE: SD NOT PERMITTED IN KITCHEN
 PER NFPA-72 8-1.4.2
  
 5)NOTE: PLEASE SEE 220-16 FOR MIN KW FOR
 WASHER CIRCUIT. 1.5KW
  
 6)NOTE: PLEASE SEE MISSING REQ`DBATH
 CIRCUIT(S) 210-52D/210-11C-3
  
 PLEASE VERIFY SIZE OF SERVICE WITH
 CONTRACTOR.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE CALL.
  
 DEWEYPALMER
 ELECTRICAL PLANREVIEW
 561-659-8096 EXT 8372
 [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2004-06-14 Cont ID  
Sent By mjacobs Date 2004-06-14 Time 15:33 Rev Time 0.00
Received By mjacobs Date 2004-06-14 Time 15:33 Sent To E
Notes
2004-06-14 00:00:00TO DP DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2003-07-07 Cont ID  
Sent By shernand Date 2003-07-07 Time 12:02 Rev Time 0.00
Received By shernand Date 2003-07-07 Time 12:02 Sent To E
Notes
2003-07-07 00:00:00DP DESK

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2003-06-24 Cont ID  
Sent By shernand Date 2003-06-24 Time 16:33 Rev Time 0.00
Received By shernand Date 2003-06-24 Time 16:33 Sent To B
Notes
2003-06-24 00:00:00JGOMEZ DESK

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-06-11 Cont ID  
Sent By shernand Date 2003-06-11 Time 09:45 Rev Time 0.00
Received By shernand Date 2003-06-11 Time 09:45 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-05-15 Cont ID  
Sent By shernand Date 2003-05-15 Time 16:35 Rev Time 0.00
Received By shernand Date 2003-05-15 Time 16:35 Sent To E
Notes
2003-05-15 00:00:00DP DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-04-01 Cont ID  
Sent By sthyng Date 2003-04-01 Time 10:30 Rev Time 0.00
Received By sthyng Date 2003-04-01 Time 10:30 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-04-19 Cont ID  
Sent By jleech Date 2003-04-16 Time 16:40 Rev Time 0.33
Received By rregueir Date 2003-04-19 Time 11:59 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status P Date 2003-06-14 Cont ID  
Sent By kstevens Date 2003-06-14 Time 07:54 Rev Time 0.25
Received By kstevens Date 2003-06-14 Time 07:54 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2003-05-24 Cont ID  
Sent By shernand Date 2003-06-11 Time 09:45 Rev Time 0.33
Received By kstevens Date 2003-05-24 Time 09:17 Sent To B
Notes
2003-05-24 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
  
 1) SANITARY RISER DIAGRAM DOES NOT RE-
 FLECT FLOOR PLAN, AND DOES NOT MEET CODE
 2) EXTRA LAV IN MASTER BATH NOT SHOWN ON
 FLOOR PLAN.
 3) CANNOT ROUTE DRAINAGE FROM M/BATH TUB
 AND LAV IN TWO DIRECTIONS. SEE RED LINE
 CORRECTIONS ON PLANS AND MAKE CORRECTION
 4) NOTE: ALL RISERS ON THIS MODEL HAVE
 BEEN REVERSED. PLEASE SUBMIT A RISER
 DIAGRAM THAT REFLECTS THE FLOOR PLAN OF
 THIS MODEL. IT WILL HELP EXPEDITE THE
 PLAN REVIEW PROCESS.
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377
 (561) 805-6721
 FAX (561) 653-2692

Review Stop P PLUMBING
Rev No 1 Status F Date 2003-04-16 Cont ID  
Sent By dpalmer Date 2003-05-16 Time 16:12 Rev Time 0.50
Received By jleech Date 2003-04-16 Time 16:40 Sent To M
Notes
2003-04-16 00:00:00DENIED;
 PAGE A-1 PLUMBING RISER DIAGRAM NOT TO
 CODE. SEC. 909.1. WET VENTS FOR BATHROOM
 S ARE PERMITED TO VENT ONLY BATHROOM
 FIXTURES. WASHING MACHINE AND LAUNDRY
 TUB ARE REQUIRED TO DISCHARGE DOWN
 STREAM OF THE BATHROOM GROUP.
 PLUMBING PLAN REVIEW BY;
 JOHN LEECH
 659-8096 EXT 8369

Review Stop Z ZONING
Rev No 1 Status P Date 2003-04-03 Cont ID  
Sent By sthyng Date 2003-04-01 Time 10:30 Rev Time 0.00
Received By sgraham Date   Time   Sent To E
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved