Plan Review Details - Permit 03032042
Plan Review Stops For Permit 03032042
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-06-25 Cont ID  
Sent By jgomez Date 2003-06-24 Time 18:52 Rev Time 0.50
Received By jgomez Date 2003-06-24 Time 18:36 Sent To  
Notes
2003-06-25 00:00:00PROVISO SUBMITTAL.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2003-04-16 Cont ID  
Sent By rregueir Date 2003-04-15 Time 18:35 Rev Time 2.00
Received By jgomez Date 2003-04-16 Time 18:43 Sent To  
Notes
2003-04-16 00:00:00BUILDING REVIEW APPROVED WITH PROVISO:
 1-PROVIDE UPDATED SBCCI PRODUCT APPROVAL
 REPORT THAT MATCHES ENGINEERING DWGS.
 CHECK THE DESIGN PRESSURES AND MAX/MIN
 PANEL SPAN SHOWN ON THE INSTALLATION
 SCHEDULE AND VERIFY WITH ENGINEERED
 DRAWINGS. SECTION 104.2.1.2 CITY
 AMENDMENTS TO FBC 2001.
 2-CLARIFY/REVISE DETAIL S21 TO MATCH 2ND
 FLOOR FRAMING PLAN. SEC. 104.2.1.2
 CITY AMENDMENTS TO FBC 2001.
 3-WINDOW 34SH DOESN'T PROVIDE THE 24"
 CLEAR HEIGHT REQUIRED BY SECTION
 1005.4 FBC 2001. REVISE/CLARIFY AS
 REQUIRED. ALSO, VERIFY THAT 24+5SH
 WINDOW PROVIDE THE 24" CLEAR HEIGHT &
 5.7 S.F. MINIMUM CLEAR OPENING.
 4-RESUBMIT ENERGY CALCULATIONS WITH
 ENGINEER'S ORIGINAL SIGNATURE & SEAL.
 CHAPTER 471 FLORIDA STATUTES AND SEC.
 103.0 CHAPTER 13 FBC 2001.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-09-17 Cont ID  
Sent By dpalmer Date 2003-09-17 Time 17:45 Rev Time 0.25
Received By dpalmer Date 2003-09-17 Time 17:45 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-04-09 Cont ID  
Sent By csiegber Date 2003-09-11 Time 10:35 Rev Time 0.25
Received By dpalmer Date 2003-04-09 Time 02:36 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-09-11 Cont ID  
Sent By csiegber Date 2003-09-11 Time 10:21 Rev Time 0.00
Received By csiegber Date 2003-09-11 Time 10:21 Sent To E
Notes
2003-09-11 00:00:00TO DP DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-09-03 Cont ID  
Sent By csiegber Date 2003-09-03 Time 16:55 Rev Time 0.00
Received By csiegber Date 2003-09-03 Time 16:55 Sent To M
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-03-25 Cont ID  
Sent By sthyng Date 2003-03-25 Time 13:49 Rev Time 0.00
Received By sthyng Date 2003-03-25 Time 13:49 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2003-09-15 Cont ID  
Sent By pkrauss Date 2003-09-15 Time 07:19 Rev Time 0.20
Received By pkrauss Date 2003-09-15 Time 07:19 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-04-15 Cont ID  
Sent By csiegber Date 2003-09-03 Time 16:55 Rev Time 0.33
Received By rregueir Date 2003-04-15 Time 18:35 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-04-09 Cont ID  
Sent By dpalmer Date 2003-04-09 Time 02:43 Rev Time 0.33
Received By jleech Date 2003-04-09 Time 19:41 Sent To M
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2003-03-27 Cont ID  
Sent By sthyng Date 2003-03-25 Time 13:49 Rev Time 0.00
Received By sgraham Date   Time   Sent To E
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved