Plan Review Details - Permit 03031883
Plan Review Stops For Permit 03031883
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-05-06 Cont ID  
Sent By jgomez Date 2003-05-06 Time 17:15 Rev Time 0.50
Received By jgomez Date 2003-05-06 Time 17:15 Sent To  
Notes
2003-05-06 00:00:00STORM SHUTTERS, SOIL TEST REPORT,GARAGE
 BUCK DETAIL AND HANDRAIL INFORMATION.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2003-04-16 Cont ID  
Sent By shernand Date 2003-05-05 Time 14:07 Rev Time 2.00
Received By jgomez Date 2003-04-16 Time 14:37 Sent To  
Notes
2003-04-16 00:00:00BUILDING REVIEW APPROVED WITH PROVISO:
 1-PROVIDE STORM SHUTTERS UPDATED SBCCI
 PRODUCT APPROVAL THAT MATCHES THE
 ENGINEERED DRAWINGS. ALSO, CHECK THE
 DESIGN PRESSURES AND MAX./MIN. PANEL
 SPAN. SEC. 104..2.1.2 CITY AMENDMENTS
 TO FBC 2001.
 2-PROVIDE COMPLETE SPECIFICATIONS FOR
 GARAGE DOOR STRUCTURAL BUCK DETAIL.
 NEED ANCHOR EMBEDMENT AND WASHER. SEC.
 104.2.1.2 CITY AMENDMENTS TO FBC 2001.
 3-BUILDING SECTION A/A-5: REVISE THE
 HANDRAIL HEIGHT. SEE SEC. 1007.5.1
 FBC 2001.
 4-PROVIDE SOIL TEST REPORT PRIOR TO
 CONSTRUCTION.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-08-27 Cont ID  
Sent By dpalmer Date 2003-08-27 Time 07:43 Rev Time 0.25
Received By dpalmer Date 2003-08-27 Time 07:43 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-04-03 Cont ID  
Sent By csiegber Date 2003-08-19 Time 14:38 Rev Time 0.25
Received By dpalmer Date 2003-04-03 Time 20:17 Sent To P
Notes
2003-04-03 00:00:00RECEPT REDLINED 2ND FLOOR.

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-08-19 Cont ID  
Sent By csiegber Date 2003-08-19 Time 14:38 Rev Time 0.00
Received By csiegber Date 2003-08-19 Time 14:38 Sent To E
Notes
2003-08-19 00:00:00TO DP DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-05-05 Cont ID  
Sent By shernand Date 2003-05-05 Time 14:07 Rev Time 0.00
Received By shernand Date 2003-05-05 Time 14:07 Sent To B
Notes
2003-05-05 00:00:00JGOMEZ DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-03-24 Cont ID  
Sent By sthyng Date 2003-03-24 Time 15:26 Rev Time 0.00
Received By sthyng Date 2003-03-24 Time 15:26 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2003-08-11 Cont ID  
Sent By pkrauss Date 2003-08-11 Time 09:29 Rev Time 0.25
Received By pkrauss Date 2003-08-11 Time 09:18 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-04-15 Cont ID  
Sent By jleech Date 2003-04-09 Time 19:11 Rev Time 0.33
Received By rregueir Date 2003-04-15 Time 19:26 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-04-09 Cont ID  
Sent By dpalmer Date 2003-04-03 Time 20:17 Rev Time 0.33
Received By jleech Date 2003-04-09 Time 19:11 Sent To M
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2003-03-27 Cont ID  
Sent By sthyng Date 2003-03-24 Time 15:26 Rev Time 0.00
Received By sgraham Date   Time   Sent To E
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved