Plan Review Details - Permit 03031013
Plan Review Stops For Permit 03031013
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2003-08-26 Cont ID  
Sent By jgomez Date 2003-08-26 Time 14:54 Rev Time 0.33
Received By jgomez Date 2003-08-26 Time 14:54 Sent To PC
Notes
2003-08-26 00:00:00SOIL TEST REPORT.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-04-29 Cont ID  
Sent By dbaxter Date 2003-08-15 Time 13:22 Rev Time 0.50
Received By jgomez Date 2003-04-29 Time 11:55 Sent To  
Notes
2003-04-29 00:00:00ENERGY CALCULATIONS AND STORM SHUTTERS
 SUBMITTAL.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2003-04-09 Cont ID  
Sent By jgomez Date 2003-04-09 Time 17:28 Rev Time 2.00
Received By jgomez Date 2003-04-09 Time 17:28 Sent To  
Notes
2003-04-09 00:00:00BUILDING REVIEW APPROVED WITH PROVISO:
 1-PROVIDE SOIL TEST REPORT.
 2-RE-SUBMIT STORM SHUTTERS INFORMATION
 WITH UPDATED SBCCI PRODUCT APPROVAL
 #2229A WHICH MATCHES ENGINEERED DWGS.
 **CHECK THE DESIGN PRESSURES AND MAX/MIN
 PANEL SPANS ALLOWED. SEE ENGINEERED
 DRAWINGS.
 3-RE-SUBMIT ENERGY CALCULATIONS WITH
 ENGINEER'S ORIGINAL SIGNATURE AND SEAL
 AS REQ'D BY CHAPTER 471 FLORIDA ST.
 AND SEC. 103.0 CHAPTER 13 FBC 2001.
 4-SPECIFY DETAIL AT TOP OF COLUMN BY THE
 STAIRS. SEE SHEET S-1.
 SEC. 104.2.1.2 CITY AMENDMENTS TO FBC.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-08-27 Cont ID  
Sent By btrobaug Date 2003-08-27 Time 18:18 Rev Time 0.33
Received By btrobaug Date 2003-08-27 Time 18:10 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-03-26 Cont ID  
Sent By csiegber Date 2003-08-21 Time 14:24 Rev Time 0.50
Received By btrobaug Date 2003-03-26 Time 08:27 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2003-08-21 Cont ID  
Sent By btrobaug Date 2003-08-21 Time 16:57 Rev Time 0.00
Received By btrobaug Date 2003-08-21 Time 14:24 Sent To  
Notes
2003-08-21 00:00:00TO BT DESK

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-08-21 Cont ID  
Sent By csiegber Date 2003-08-21 Time 13:42 Rev Time 0.00
Received By csiegber Date 2003-08-21 Time 13:41 Sent To M
Notes
2003-08-21 00:00:00TO PK DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-08-15 Cont ID  
Sent By dbaxter Date 2003-08-15 Time 13:22 Rev Time 0.00
Received By dbaxter Date 2003-08-15 Time 13:22 Sent To B
Notes
2003-08-15 00:00:00TO JGOMEZ DESK.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-03-14 Cont ID  
Sent By sthyng Date 2003-03-14 Time 13:20 Rev Time 0.00
Received By sthyng Date 2003-03-14 Time 13:20 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2003-09-04 Cont ID  
Sent By pkrauss Date 2003-09-04 Time 08:39 Rev Time 0.25
Received By pkrauss Date 2003-09-04 Time 08:39 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-03-31 Cont ID  
Sent By csiegber Date 2003-08-21 Time 13:42 Rev Time 0.25
Received By hmoser Date 2003-03-31 Time 19:35 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-03-27 Cont ID  
Sent By btrobaug Date 2003-03-26 Time 08:57 Rev Time 0.33
Received By jleech Date 2003-03-27 Time 19:36 Sent To M
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2003-03-17 Cont ID  
Sent By sthyng Date 2003-03-14 Time 13:20 Rev Time 0.00
Received By sgraham Date   Time   Sent To E
Notes
***NONE***