Plan Review Details - Permit 03031005
Plan Review Stops For Permit 03031005
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2003-04-03 Cont ID  
Sent By hmoser Date 2003-03-31 Time 19:15 Rev Time 2.00
Received By jgomez Date 2003-04-03 Time 13:09 Sent To  
Notes
2003-04-03 00:00:00BUILDING REVIEW APPROVED WITH PROVISO:
 1-PROVIDE CORRECT INFORMATION FOR STORM
 SHUTTERS. SEE ENGINEERED DRAWINGS AND
 REVISE THE INSTALLATION SCHEDULE
 SUBMITTED FOR THIS PROJECT. CHECK THE
 DESIGN PRESSURES, PANEL SPAN & ANCHOR
 TYPE AND SPACING.
 2-REVISE DETAIL S-21 FOR COLUMN LOCATED
 BETWEEN GARAGE AND STAIRWAY. DETAIL
 SHOWN DOESN'T APPLY.SEC. 104.2.1.2
 CITY AMENDMENTS TO FBC 2001.
 3-SHEET S-1: REVISE CONNECTOR TC-1 SHOWN
 ON ROOF PLAN AT SECOND FLOOR FRONT
 ELEVATION. NEED WOOD TO SPECIFY WOOD
 TO WOOD CONNECTOR. SEC. 104.2.1.2
 CITY AMENDMENTS TO FBC 2001.
 4-34SH WINDOW DON'T ALLOW THE 24" CLEAR
 HEIGHT OPENING. REVISE AS REQUIRED.
 ALSO CHECK THAT 24+5SH WINDOW PROVIDES
 5.7 SF CLEAR OPENING. AS REQUIRED BY
 SEC. 1005.4.4 FBC 2001.
 5-ENERGY CALCULATIONS TO HAVE ENGINEER'S
 ORIGINAL SIGNATURE AND DATE AS REQ'D
 BY CHAPTER 471 FLORIDA STATUTES AND
 SEC. 103.0 CHAPTER 13 OF FBC 2001.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-08-11 Cont ID  
Sent By dpalmer Date 2003-08-11 Time 07:07 Rev Time 0.25
Received By dpalmer Date 2003-08-11 Time 07:07 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-03-25 Cont ID  
Sent By alange Date 2003-08-06 Time 09:39 Rev Time 0.25
Received By dpalmer Date 2003-03-25 Time 06:51 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-08-20 Cont ID  
Sent By csiegber Date 2003-08-20 Time 09:55 Rev Time 0.00
Received By csiegber Date 2003-08-20 Time 09:55 Sent To M
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-08-06 Cont ID  
Sent By alange Date 2003-08-06 Time 09:39 Rev Time 0.00
Received By alange Date 2003-08-06 Time 09:39 Sent To E
Notes
2003-08-06 00:00:00TO DP DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-03-14 Cont ID  
Sent By sthyng Date 2003-03-14 Time 12:01 Rev Time 0.00
Received By sthyng Date 2003-03-14 Time 12:01 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2003-08-26 Cont ID  
Sent By pkrauss Date 2003-08-26 Time 07:05 Rev Time 0.25
Received By pkrauss Date 2003-08-26 Time 07:00 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-03-31 Cont ID  
Sent By csiegber Date 2003-08-20 Time 09:55 Rev Time 0.25
Received By hmoser Date 2003-03-31 Time 19:15 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-03-27 Cont ID  
Sent By dpalmer Date 2003-03-25 Time 06:52 Rev Time 0.33
Received By jleech Date 2003-03-27 Time 18:57 Sent To M
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2003-03-17 Cont ID  
Sent By sthyng Date 2003-03-14 Time 12:01 Rev Time 0.00
Received By sgraham Date   Time   Sent To E
Notes
***NONE***